Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Count the Pots in Your Sunroom Before the Roofers Pick a Date

A sunroom full of plants is a roof day question, so compare who moves the pots, where they wait, and who keeps them watered.

A sunroom is often the room a homeowner forgets when the roof crew is planned. The glass is the first thing a crew sees from the drive, and the room sits under a roof edge that will be open for part of a day. If you keep a row of pots on the sill, a fern on a stand, or a citrus tree that goes outdoors in summer, those plants have a stake in the roof date. This page covers what to compare when each roofer answers the question of who moves the plants, where they go, and what happens to the water on the shelf.

Why the plants are a roof day question

Tear-off throws grit and dust into any room with glass or an open ceiling nearby. A sunroom usually has a glass or polycarbonate roof, and the crew works on the main roof right above it. Plants under that glass can pick up a scatter of granules on the leaves, and they can be knocked over if a staging path runs through the room. Heavy planters also become a hazard if the room has to be cleared quickly because of a storm. None of this is unusual. The sunroom is one of the places where the living space and the roof work meet, so the bid should say who clears it.

Before the crew arrives

Whatever each roofer says, the homeowner can do some of the work ahead of the crew. Count the pots, note their sizes, and photograph the shelves and the window line on the day you choose a roofer. A dated photo gives you a baseline if something changes during the job. Move the lightest plants first, and leave the heavy ones until the crew has agreed in writing who handles them. Keep a clear path from the sunroom door to the room where the plants will wait, and measure the door width if a large planter has to pass through it.

Tell each roofer which plants need light, water or cool air on a schedule, and which ones are cuttings or seedlings that would not survive several days in a dark garage. That detail changes the answer. A crew can carry a rubber tree out in one trip, but it cannot keep a tray of seedlings alive in a closed garage for a week unless someone waters them on a set schedule.

Roofer comparison

Ask each roofer the same three things. First, who moves the plants: the homeowner, the crew, or a named helper. Second, where the plants go once they leave the room, and whether that space is inside the house and out of the drop zone. Third, who waters the plants on each day the room stays closed off, because a plant moved on Monday may need water on Thursday while the room is still sealed. Write each answer in its own row. If one roofer says the crew will move everything and another says the homeowner must move everything, that gap belongs on your comparison sheet before the price does.

Pay attention to the wording. "We can help" is not the same as "our crew will carry each pot to the garage and bring it back on the final day." A roofer who names a task, a person and a day is answering the question. A roofer who says the plants will be taken care of has not answered it.

Check whether the answer matches the rest of the bid. If the bid has a line for protecting interior finishes but nothing about the glass room, ask why. Plants are rarely a separate line item, which is why they get missed.

What it costs

Moving plants costs time, and someone pays for that time. A crew that helps carry pots, cover a shelf and haul a heavy planter adds labor, and a bid that includes this work should show it as labor, not as a vague allowance. A homeowner who moves the plants alone pays in hours and in the risk of a back strain. Neither choice is wrong, but the two are not the same price. Do not compare a quote where the crew moves everything against a quote where the homeowner does.

Ask whether plastic sheeting or drop cloths for the plants are in the price or billed separately. Ask what it costs to move the plants back in, and whether that happens on the final day or on a later visit. If a roofer offers to store plants in a garage, ask whether that garage is inside the scope or is an area you must prepare yourself. None of these questions require a number on the spot. They do require a written line.

What to ask

  • Who moves each plant out of the sunroom, by name or by role, and on which day?
  • Where do the plants go, and is that space inside the house and outside the drop zone?
  • Who waters the plants on each day the room stays closed off?
  • Which plants are heavy enough that the crew, not the homeowner, should carry them?
  • Is any covering for the plants priced in the bid, or billed later?
  • Who wipes grit off the leaves and the sill before the plants return?
  • What happens if rain or a storm forces the room to be cleared on short notice?

Write each answer beside the roofer's name. A complete answer names a person, a place and a day. A blank cell still tells you something, so mark it and ask again in writing. If you want Keys to answer these questions in writing, call the office at (314) 220-2333.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection