Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Count the Leftover Bundles Before Each Roofer's Truck Leaves

Ask each roofer how leftover shingle bundles are counted, returned and stored, so the number on your sheet matches the number on the truck.

A roof job leaves a small pile of material that most homeowners never think about until the truck is gone. Shingles are sold in bundles, and a roofer orders a little more than the measured area so the crew does not run short on the last slope. That extra is normal. What matters is where the extra goes when the job ends. Unopened bundles can often go back to the supplier for credit, opened bundles usually cannot, and the count sheet is the only record you will have. Ask each roofer to write down the bundle count before the crew loads the truck, and compare the answers.

Why the leftover count affects your bill

The shingle line on a roof quote is built from squares, and a square is enough material to cover one hundred square feet of roof before waste. Most roofers add a waste allowance on top of the measured number. If the allowance is generous and the extra bundles come back unopened, the final invoice may show less shingle cost than the quote carried. If the bundles stay on your property, the cost stays with you as well. Either outcome can be reasonable. The problem is an answer that changes between the bid, the day of delivery, and the final walk.

In St. Louis the timing matters too. A pallet that sits on a driveway through a freeze or through a hot July can warp, and a supplier may refuse a return on bundles that were stored outdoors for long. Ask how long the leftover bundles will sit on your lot, who moves them, and whether they will be covered if rain is forecast before the truck leaves. A stack that gets soaked on the drive is a different problem from a stack that rides back to the yard on the same afternoon.

The questions to put to each roofer

Write these questions down in the same words for every company, so the answers can be compared line by line. A roofer who answers the same question two different ways across two calls has told you something useful, and you should note it.

  • How many bundles were ordered against the measured squares, and how many of those bundles are the waste allowance?
  • How many bundles were unloaded on your property, and how many were actually installed on the roof?
  • Which unopened bundles go back to the supplier, and what credit does the supplier give for each one?
  • Who signs the return slip, and will you get a copy of it before the crew leaves?
  • Where do opened or partly used bundles go, and do they stay with you or leave with the crew?
  • How are the remaining bundles covered on your lot overnight, and who is responsible if they get wet?

Lot numbers and shade matching

Keys installs Atlas and Malarkey shingles only, and each bundle carries a lot number printed on its wrapper. Ask the crew to record the lot number of every bundle that leaves the property, whether it goes back to the supplier or stays in your garage. That record lets a return or a leftover be matched to the original order. It also matters later. Bundles from different production runs can differ slightly in shade, so if a shingle is ever damaged and needs replacing, the lot number on the spare is the fastest way to find a match that is close to the roof you have.

For this reason, keep at least one bundle from the job in a dry place with its wrapper still on, and write the date the roof was finished on the wrapper or on a card inside the bag. Many homeowners keep nothing at all, and then a small repair turns into a guess about color. A single labeled bundle costs little to keep and settles the question quickly when a neighbor or an inspector asks what was installed.

What a clear answer sounds like

A clear answer gives a number, names a place, and names a person. An answer like we will take care of the extra bundles usually means the question has not been thought through by anyone on the crew. An answer like 6 bundles over the waste allowance, unopened ones go back on the next supplier run, the crew lead signs the slip, and you keep the copy is one you can check. Compare the two answers on the same line of your sheet, and mark the one that gives a count.

Some roofers will say the leftovers are part of the price and leave it there. That can be a fair answer if the bid says so in writing, and if the bundles are not a hidden charge later. Ask whether the leftover material is included in the quoted price or billed separately at the end, and get the reply in the same written form as the bid itself. A spoken promise on the driveway is not something you can check after the truck has gone.

Putting the answers in one place

Keep each roofer's answers in one folder, with the question at the top of the page and the reply beneath it. When the final invoice arrives, pull the bundle count from the sheet and compare it to the number on the invoice and to the number on the truck. If the three numbers do not agree, ask the roofer to explain the difference in writing before you pay the final amount.

If you want to ask Keys directly how leftover bundles are counted and returned, call the office at (314) 220-2333 and ask for the count sheet that applies to your address. Ask the same questions you would ask anyone else, and write down the answers as they are given. The point of the exercise is not to catch a roofer out. It is to have a number you can rely on when the job is over.

  • Write the bundle count on the day of delivery, before the first bundle is opened.
  • Record the lot number of each bundle that leaves the property.
  • Get a signed copy of every return slip the day it is signed.
  • Keep one labeled bundle from the job in a dry place.
Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection