
Compare Who Pays When the Crew Breaks Something in Your Home
Each roof bid should name who pays for broken glass, cracked pavers or a dented gutter, and put the answer in writing before the crew arrives.
A roof job puts more people, ladders, trucks and debris on a house than most homeowners expect. Over a few days a crew may walk through the side yard, set a ladder against a gutter, drop a bundle near a patio table and carry tools past a glass storm door. Most of the time nothing breaks. When something does break, the bid is often the only written record of who was supposed to pay for it, and many bids say nothing at all.
This page is for a homeowner comparing roofers who wants one specific answer before signing: when the crew damages something inside or outside the house, who pays, how the damage is recorded, and how fast it gets fixed. The question is not about the roof itself. It is about everything around the roof that the crew touches on the way in and out.
Where roof day damage usually lands
Most small damage on a roof job lands in predictable places. Gutters and downspouts take ladder hooks and bundle drops. Patio furniture, grills and outdoor lights sit under the drop zone. Storm doors and screens get knocked by people carrying tools. Landscape lighting, sprinkler heads and hose bibs get stepped on or cut. Garage doors and side gates get left open or latched wrong. Each of these is ordinary work exposure, and a careful bid names how each one is handled.
The larger risk is what falls. A tear-off sends shingles, nails and granules down the roof, and the debris can crack a skylight, dent a car or puncture a window screen. Heavy items like a dumpster or a ladder can chip a paver edge or a concrete step. Glass is expensive to replace, and a cracked storm pane can cost more than the gutter it fell beside.
Read the bid for the word damage
Open each roof bid and search for the words damage, repair, broken, cracked, restore and replace. If none of them appears outside the roof line items, the bid does not answer the question. A bid that says the crew will be "careful" or will "clean up" has made a promise about behavior, not about money. A bid that names who repairs a broken pane, a bent downspout or a cracked paver, and at whose cost, has made an answer you can hold the contractor to.
Pay attention to the scope section. Some bids list property protection as a line item, such as tarps over landscaping or plywood over an open entry. Others leave it out. A missing line does not mean the contractor will refuse to fix what it breaks, but it does mean you will need to ask. The answer you get on the phone is not part of the contract unless it goes into writing.
Ask for a photo walk before the crew arrives
Before any material leaves the truck, a clear record of the house as it stands protects both sides. Keys documents the property before work starts, with dated photos of the roof, gutters, siding, windows, landscaping and anything near the drop zone. Ask each roofer to explain what their pre-start photos will show and whether you receive copies. A roofer who cannot describe the photo process probably does not have one.
Photos taken before the work help in two ways. They show whether a storm door already had a crack or a gutter already sagged, so the crew is not blamed for it later. They also give you a fast way to tell whether a new mark came from the roof job. Ask for the photos in their original form, with the date visible, rather than as screenshots or a compressed set.
What a written answer should cover
Ask each roofer to write down, in the bid or in a short addendum, the following points:
- Who inspects the property at the end of each day, and who writes down any new mark.
- How you report damage, and the time frame in which the contractor says it will respond.
- Who pays for a repair that the crew causes, and whether the contractor pays directly or only after some other step is finished.
- Whether the contractor carries general liability coverage, and whether you can receive a certificate that names your property.
- How a broken item is replaced, whether by a matching part, a comparable part or a cash allowance.
The last two points need the closest reading. Liability coverage is handled by the roofer's insurance agent, so ask for the certificate from the agent directly rather than from a sales rep. A repair that the contractor agrees to make is also different from a repair that waits on a third party. Put the sequence in writing so you know what happens first.
What the roofer cannot do with your insurance
Missouri law (RSMo 407.725) forbids a roofing contractor from representing or negotiating a homeowner's insurance claim, and forbids saying anything about paying, waiving or covering a deductible. That rule applies to damage a crew causes as much as to storm damage. A roofer can document what happened, write a scope and attend while you deal with your own insurer, but the claim and the deductible stay with you. Keys will not handle or negotiate a claim for you, and any bid that offers to do so should raise a question.
If a crew breaks a window during the job, your own policy may or may not respond, depending on the policy wording and the cause. Keep the damage photographed, get the contractor's written account, and take the file to your insurer yourself. The roofer's written scope and photo record will help that file, but the roofer cannot file it for you.
Questions to ask each roofer
- What do you photograph before the crew starts, and do I get copies?
- Who inspects the yard at the end of each day, and where is that written?
- Who repairs a broken pane, gutter or paver the crew causes, and who pays for it?
- How do I report damage, and how long until you respond?
- Can I have your liability certificate from your agent before I sign?
- Is any of this written in the bid, or only said on the phone?
Write down the answers from each roofer side by side. The bid that answers every question in writing has done the work. The bid that answers with a shrug has told you what to expect on roof day. You can call Keys at (314) 220-2333 with these questions before you sign, and ask for the answers in writing.
When the crew does break something
If something breaks during the job, stop, photograph the item and the area around it before anyone moves it, and tell the crew lead. Ask for the contractor's written account the same day. Do not accept a verbal fix that has no date, no cost and no name attached. A short note that says what broke, when, and what the contractor will do about it gives you a clear starting point for the rest of the conversation.
The answer to who pays should already be in the bid. If it is not, that gap is the thing to settle before the crew comes back. Waiting until the tear-off is finished makes the conversation harder and gives the broken item more time to get lost in the paperwork.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.