Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Compare the Closeout Packet Each Roofer Hands You Before the Final Check

Each roofer should hand you the same closeout packet, and listing what it contains is a fair way to compare bids before you sign.

When the last nail is in, a roof job still has paperwork to finish. Most homeowners focus on the start date and the total, but the papers handed over at the end decide what you can prove later about what was installed, who was paid, and who to call when a shingle lifts in the first hard wind. Comparing roofers on this point is simple. Ask each one to list what the closeout packet will contain, in writing, before you sign.

Roofer comparison

Put the closeout list inside the bid itself so you can read the roofers side by side. A bid that says warranty paperwork will be provided tells you very little. A bid that names each document, says who signs it, and gives a date for when you will hold it gives you something to check on the final day. Keys Roofing can be asked to list each item below in the bid before you accept it, and the same question can go to every other contractor you are weighing. Keys can be reached at (314) 220-2333.

A complete packet for a St. Louis reroof usually includes the following items. Compare each bid against this list and mark what is missing.

  • A signed completion form that matches the start and finish dates in the contract, with the final walkthrough noted on it.
  • The shingle product name, color, and bundle or lot information for what was installed, so a later repair can be matched to the original material.
  • The workmanship warranty in writing, with its start date and the coverage stated plainly rather than as a summary.
  • Any manufacturer warranty registration, along with who files it and by what date.
  • Lien waivers from the roofer, and from the suppliers and subcontractors who were paid through the job, tied to the amounts actually paid.
  • A disposal receipt for the old roofing material that left the property.
  • The permit number and the result of the final inspection, with the sign-off from the municipal permit desk recorded in the packet.
  • A dated photo set of the finished roof, taken slope by slope, plus the ridge, valleys, and penetrations.
  • A final invoice that matches the signed bid line by line, with any change orders shown as separate lines.
  • A named contact and a direct number for service calls after closeout.

The photo set matters more than it first appears. A roof in St. Louis goes through freeze and thaw cycles every winter, and hail season comes around every spring. A dated set of clear photos taken on the day the job closes is the baseline you will compare against when the next storm passes through or when a stain shows up on a ceiling after a thaw. Without it, nobody can say what the roof looked like on the day it was finished.

Roofers differ in how they handle this packet. Some hand it over in a folder at the final walk. Others email a link days later. Neither method is wrong by itself, but a packet that arrives after the final payment has already cleared gives you less leverage than one you hold before the last check is written. Ask each roofer when the packet will be in your hands and what happens if a document is still pending on that date.

What it costs

Closeout paperwork should not add a line to your total. The signed bid, the warranty terms, the disposal of old material, and the final photo set are normally part of the work the price already covers. If a closeout fee appears on the final invoice that was not in the signed bid, compare it to the written terms before paying. Ask the roofer to show you where that fee was stated in the contract.

Pay attention to any money held back until closeout. Some contracts hold a share of the total until the final inspection passes and the packet is delivered. When that is the case, the release date for the held amount should be written in the bid, along with the condition that releases it. Without that, a retained amount can sit for weeks while you wait on a document nobody has named.

Lien waivers are the document most often missing from a packet, and they cost nothing to produce. A waiver from a supplier or subcontractor that does not match the amount paid is a sign to ask why before the final check goes out. The waiver protects your property from claims by people who were not paid by the roofer, so the amounts on the waivers should match the payments the bid describes.

The price of a roof is only one number in the decision. The packet is what keeps that number honest after the crew leaves, and it is cheap to compare. Two bids with the same total can produce very different packets, and the difference will only show up if you asked for the list in advance.

What to ask

Ask each roofer these questions and write down the answers. Compare the replies in the order they were given, because the answer to the first question often shapes the rest.

  1. Which documents will be in the closeout packet, and can you list them in the bid?
  2. Who signs the completion form, and will I see it at the final walkthrough?
  3. What is the exact start date of the workmanship warranty, and where is that stated in writing?
  4. Who files any manufacturer warranty registration, and by what date?
  5. Which suppliers and subcontractors will sign lien waivers, and for what amounts?
  6. Who takes the old roofing to disposal, and will I receive the receipt?
  7. Who requests the final inspection, and when will the permit sign-off be in my hands?
  8. Will the photo set cover each slope, the valleys, and every penetration?
  9. Does the final invoice match the signed bid line by line, and where would a change order appear?
  10. When will the complete packet be in my hands, and what happens if one document is still pending?

If a roofer cannot answer one of these questions on the first call, put the question in writing and time the reply. A roofer who knows the closeout process will usually answer it in the same breath. A pause, or a promise that someone will look into it later, is a difference between bids worth recording in your comparison sheet.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection