Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Compare Each Roofer's Washer Hookups and Laundry Room Plan

Ask each roofer how the washer hookups, drain and laundry ceiling are handled, and who answers if a line fails after the crew leaves.

Roof day in St. Louis usually reaches the laundry room whether anyone plans for it or not. The washer hoses, the supply valves and the drain standpipe often sit on the same interior wall as the plumbing vent that runs up through the roof, and the crew's path to that vent can pass straight through the room. Two bids can read the same on the roof and still handle this room very differently, so it is worth asking each roofer about it before the date is set.

Why the laundry room belongs in the roof plan

Three things can go wrong in a laundry room during a reroof. The first is the water supply. Many washers connect to rubber hoses on shutoff valves that have not been turned in years. When a crew needs to work near the plumbing vent, someone may close those valves, and an old valve can seize or drip when it is turned back on. The second is the drain. A standpipe or drain box that gets bumped during tear-off can crack or shift, and a washer that drains into a loose connection can flood the floor during a cycle the homeowner runs a week later. The third is the ceiling. Dust, dropped nails and foot traffic from above can loosen drywall or a light fixture under a vent penetration, and a ceiling stain that appears after the job can be hard to trace back to a specific day.

Timing matters here too. A reroof scheduled in late fall can run into a hard freeze in the middle of the work. A supply line that was drained for the job and not reconnected can freeze inside an exterior wall, and a laundry room on the north side of the house is often the coldest room in the place. Ask whether the plan includes restoring water service and checking the valves at the end of each working day, not only at the end of the job.

None of this makes the laundry room a hard job. It makes it a short list of specific items that a good bid either names or leaves out. A bid that says protect interior without naming the washer, the valves or the ceiling below the vent has not answered the question.

What to compare in each roofer's plan

Read each bid for the following points and write the answer beside each roofer's name.

  • Whether the washer supply valves will be touched at all, and if so, who turns them off and who checks that they open again.
  • Whether the washer hoses and drain standpipe will be covered, moved or left in place, and whether the crew will stage materials or work near them.
  • Whether the ceiling below the plumbing vent is inspected and photographed before tear-off starts.
  • Whether any crew member will enter the laundry room, or whether all work stays on the roof and the exterior of the house.
  • Who is responsible if a hose, valve or drain fails in the first days after the crew leaves, and how that failure is reported to the homeowner.

A roofer who answers all five points in writing is giving you a plan you can check later. A roofer who answers only in person and never writes it down has given you a conversation, which is harder to hold them to on the day the crew shows up.

Roofer comparison

Put the two or three bids side by side and look only at the laundry room lines. Set the shingle brand and the total price aside for this step. Notice whether the roofers use the same words. Some will write washer and drain protected, which says the crew intends to cover the appliance and its lines. Others will write interior protection as needed, which leaves the decision to the crew on the day. The second wording is not necessarily wrong, but it gives you nothing specific to check when the job is done.

Pay attention to the vent. A plumbing vent that runs down through an upstairs bath or a laundry closet is a common source of leaks after a reroof, and the flashing around it is a roof detail that belongs in the same bid. A roofer who mentions the vent when describing the laundry room has thought about the path from the roof down to the ceiling below. A roofer who does not mention it may still do the job well, but you should ask directly.

Also compare who is named as the person to call. A bid that lists a crew lead, a project contact and an office number gives you a clear path if a line fails. A bid that names only a salesperson leaves you to find the right person after the trouble has started. Keys Roofing can be reached at (314) 220-2333 to answer questions about how its own bid handles the laundry room.

What it costs

Protecting a laundry room is usually a small line in a roof bid. Covering the appliance, laying down drop cloths near the hookups and pulling boxes away from the wall take time but not much material. The cost that matters is what happens if the room is not protected. A flooded floor, or a ceiling stain that has to be cut out and repaired, is a separate job, and it is rarely quick or cheap.

Ask each roofer whether the laundry protection is included in the price or listed as an extra line. Ask whether any valve or hose replacement would be done by the roofer or by a plumber brought in separately, and how that work would be billed. Ask whether a plumber's visit would be scheduled through the roofer or through you. Each of these answers changes the number you are comparing, so get them in writing before you line up the totals.

Keys Roofing can put the laundry room into the written scope with photos taken before the crew arrives, so the starting condition is on paper. Whatever roofer you choose, the photos are the record you will want if a question comes up later about the ceiling or the valves.

What to ask

  1. Will you turn off the washer supply valves, and who checks that they open again before the crew leaves?
  2. Will the washer hoses and drain standpipe be covered, moved or left alone, and where does the crew stage materials near that wall?
  3. Will you photograph the laundry room ceiling below the plumbing vent before tear-off starts?
  4. Will any crew member enter the house, and if so, through which door and to which room?
  5. If a hose, valve or drain fails in the first week after the job, who do I call, and how is that reported?
  6. Is the laundry protection included in the price, or is it an extra line on the bid?

Write each answer down with the date and the name of the person who gave it. If a roofer cannot answer one of these questions before the crew is on the schedule, that gap is worth knowing before you sign anything.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection