Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Compare Each Roofer's Truck Insurance Certificate Before the Trucks Park at Your Curb

Ask each roofer for the auto certificate covering trucks and trailers on your street, then compare the named insured, policy dates and limit.

A roofing crew parks a work truck, a dump trailer and sometimes a pickup for the lead carpenter on your street for days at a time. Each of those vehicles carries a liability exposure. If a trailer clips a mailbox, a truck rolls on a sloped drive, or a crew member's personal car is struck while it sits in your driveway, the question of who pays starts with insurance. Most homeowners never ask to see the auto part of a roofer's coverage. Here is what to ask, what the paper should show, and how to compare the answers across the bids you are holding.

Why the truck belongs in the comparison

General liability and workers' compensation get most of the attention on a roof bid, and both matter. The auto line covers the vehicles the company owns and the vehicles it uses without owning, such as a trailer rented from a yard or a delivery van hired for a single day. Those vehicles spend their time on public streets and on private drives, and the damage they cause on your lot usually runs through the auto policy rather than the general liability policy.

Ask for the certificate before you compare prices. A bid that looks lower may rest on a company that cannot show a vehicle policy in force on your job dates, and that gap does not show up on the proposal itself.

What the certificate should show

A certificate of insurance is a summary issued by an agent. It does not change the policy underneath it, and it does not give you the policy language. Read it for these items:

  • The named insured, which should match the company name on the contract, the truck door and the invoice. A different legal name on the certificate is a question to settle in writing before the crew arrives.
  • The policy period, which should cover every day the crew will be on your lot, with a few days of margin in case the schedule slips into the following week.
  • A commercial auto liability limit written in dollars. A phrase such as as required by law tells you nothing about the amount, so ask the agent for the number.
  • A line for hired and non-owned auto, which covers vehicles the company rents or borrows. Many roofing crews tow rented trailers, so this line matters more than the company's own truck list.
  • The agency name, a phone number and the date the certificate was issued.

Compare the stated limit against the minimum the state requires for a registered vehicle. Your agent or the state's motor vehicle office can confirm that minimum. A limit below it is a reason to stop comparing and ask the roofer why.

Three things a certificate can leave out

The first is your own name. General liability certificates often list the homeowner as an additional insured on the job. Auto coverage usually does not work that way, so do not read the absence of your name on the auto line as a defect in the paperwork. Ask instead whether the auto policy responds to a claim made against the homeowner for a vehicle the crew used on your property, and get the answer from the agent in writing.

The second is the vehicle the company does not list. Many fleet policies schedule vehicles by number or by description. A crew member's personal car, a neighboring contractor's trailer parked on your drive, or a rented skid steer may fall outside the schedule. Ask the agent how an unscheduled vehicle is treated and whether that answer appears in writing. If it does not, the question is still open.

The third is the date. A certificate issued last spring may describe a policy that renewed in the summer. The certificate is a snapshot, so ask for one issued near the signing date, note the renewal month, and ask to be told in writing if the policy is cancelled or lapses before the job ends. Most certificates say that notice of cancellation follows the policy terms, which means you may not be told unless you ask.

What the crew's own cars do on your street

Personal vehicles are the part of a roof job that homeowners see most and ask about least. A crew of four may arrive in four cars, and those cars take up the curb space your shingle truck needs. Ask each roofer where the personal vehicles will park, whether they will be moved for the delivery, and whether the company's auto policy treats them as covered when a crew member is driving for the job. Those are separate questions, and each roofer should answer them without a pause for a call to the office.

A roofer who says the crew's cars are the crew's own business has answered the insurance question and the parking question at once, and the answer is that you may be on your own. That answer is worth knowing before the first morning, not after a fender is dented.

Asking the same question of each roofer

Send each roofer the same three questions in writing, then compare the replies line by line.

  1. Name the agency and the carrier for your commercial auto policy, and send the certificate with the policy dates.
  2. Confirm whether the crew's personal vehicles, rented trailers and delivery vehicles fall under the same auto policy as the company trucks, or under a separate one.
  3. State the auto liability limit in dollars and say whether that limit applies per accident.

A roofer who answers all three with a document and a date has given you something to compare. A roofer who answers with a sentence such as we are fully insured has given you a sentence and nothing else. Note how long each reply takes as well. The agency that issues the certificate is usually the same agency you would call if something went wrong on your street, so its speed is part of what you are buying.

What an auto certificate cannot do for a home claim

An auto certificate does nothing for a dent in your siding from a hail storm or a stain after a tear-off. Those are property matters, and they run through your own insurer. Missouri law (RSMo 407.725) forbids a roofing contractor from representing or negotiating a homeowner's insurance claim, and it also forbids the contractor from saying anything about paying, waiving or covering a deductible. A roofer may document damage, put a written scope with photos and measurements in your hands, and attend as the contractor while you deal with your own insurer. A roofer may not take over the claim.

Keep the auto question and the claim question on separate lists. The auto certificate answers who pays for a truck on your street. Your policy answers who pays for the roof. Mixing the two lists is how a homeowner ends up waiting on the wrong office.

Where to start

Call the office number on the bid. For Keys Roofing that number is (314) 220-2333. Ask for the current certificate, the agent's name and the policy dates, then ask the same three questions of every other roofer on your list. Put the replies side by side with the named insured, the policy period, the limit and the answer on personal vehicles. The bid that wins on price still has to pass the same paper check as the others.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection