Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Compare Each Roofer's Stated Roof Age to the Evidence They Show You

A roofer's estimate of your roof's age shapes the bid, so compare the reasons each one gives and the evidence behind them.

A roofer's guess at how old your roof is can change the whole bid. An older roof may need a different tear-off plan and a closer look at the decking, while a newer roof may need only a repair. So when two roofers give you two different ages, or one gives a number and the other gives none, the age itself becomes a point of comparison. This page covers how to test those claims and what evidence to ask for.

Why the age number matters to the bid

Roof age feeds several decisions. It indicates how far the shingles have dried out and how much granule loss to expect. It tells the crew how brittle the old tabs will be at tear-off, which affects how much debris comes down in usable pieces and how much breaks. It also hints at what sits under the shingles, such as an older deck or an earlier overlay. A roofer who puts an age on your quote is telling you what they expect to find once the first course lifts, and you can check that expectation against the roof itself.

Most roofers in St. Louis will look at the same things: how the shingles have held up through freeze-thaw cycles, whether the tabs have cupped or curled, whether hail has knocked granules loose, and whether the metal flashing has rusted. None of those signs gives a precise age. They give a range, and a roofer working carefully will say so.

Three ways a roofer can state the age

Roofers tend to describe age in one of three ways. Some give a single number, such as twelve years, as if it were measured. Some give a range, such as ten to fifteen years, and explain what narrows it. Some say they cannot tell without a record and then ask you for one. Each style is useful, but each leads to different follow-up questions.

  • A single number: ask what it is based on, and whether they checked a permit, an invoice, or a sample lifted from the roof.
  • A range: ask which signs place it at the low end and which place it at the high end.
  • No number: ask what they would need to see, and whether they will write down a best estimate with the reason beside it.

What evidence to ask each roofer for

Ask for the evidence in writing, with dates and photos. A written note with the roofer's name and the date of the visit is more useful than a verbal answer, because you can compare it line by line against the other bid. Photos should show the shingle tabs up close, the ridge, the valleys, and the flashing at the walls and chimney. A photo of the whole roof taken from the street will not settle the question.

Ask specifically about the signs that change with age in this region. Look for granule loss in the gutters or at the downspout outlets, since a roof that sheds granules is aging in a visible way. Ask whether the tabs show cracking at the cutouts, which often appears after a hard freeze and is one of the clearer signs of age. Ask whether the edges are curling. Ask whether the sealant strips still bond the tabs down, or whether a corner lifts when pulled gently. These are checks a roofer can make from the ladder, and the results should be written down.

How age and layer count differ

Age and layer count are separate questions, and some bids blur them. A roof can be old and still have one layer, or be relatively young and already carry two. Ask each roofer to state both. If one bid says the roof is fifteen years old and another says it is one layer over an older base, you may be comparing two different roofs, or one roofer may have guessed at the layers. The layer count affects how much debris comes down and how the deck is checked, so it belongs next to the age on your comparison sheet.

Where an age estimate can go wrong

Roofers can misjudge age in a few predictable ways. A roof that was partly replaced, such as a section over an addition, may be read as one age when it is really two. A roof repaired with a new patch may look newer in one spot and older everywhere else. Hail damage can make a roof look either worn or fresh depending on where the photo was taken. Sun exposure matters too. In many cases the south and west slopes age faster than the north slopes, so one estimate for the whole roof may hide a split. Ask each roofer whether they looked at each slope separately, and whether the age they gave applies to all of them.

Records can mislead as well. An old invoice may describe a different roof than the one on the house now. A permit date shows when work was approved, not what was installed. If you have a record, bring it, but do not let it replace a close look at the shingles. Ask each roofer what the record shows and what it leaves out.

What to write down and compare

Set up a short sheet with one row for each roofer. Put the stated age in one column and the evidence behind it in the next. Add columns for slopes checked, layer count, and photos received. Mark any answer that is only a guess. When the sheet is full, you can see which roofer tied the age to the roof and which one gave a number without support.

If one roofer gives a clear, written reason and another gives only a number, you have learned how each bid was prepared, but not yet which estimate is right. For that, ask each roofer to walk the roof with you, or to let you watch the check on one slope. Keys Roofing documents what it finds, puts a written scope with photos and measurements in your hands, and answers your questions about the roof while you make the decision. To set up a walk, call the office at (314) 220-2333.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection