
Compare Each Roofer's Site Survey Notes Before the Number Goes Final
Each roofer's site survey notes show what they saw on your roof, and a comparison is only as good as those notes.
A site survey is the visit where a roofer climbs or measures your roof, looks at the gutters, flashing, vents and decking edges, and writes down what they found. The number on the bid comes from those notes. If the notes are thin, the number is a guess with a letterhead. Before you choose between two or three roofers in St. Louis, ask each one for a copy of their survey notes, or at least the page that lists what was inspected and what was measured.
What a survey note should contain
A useful survey note names each roof slope by its facing direction and gives a pitch for each one. It counts the penetrations, such as pipe boots, vents, exhaust hoods and the chimney, and says where each sits. It should state whether the roof has one layer or two, what the decking looks like where the crew could see it, and whether the eave edges show soft wood or flashing that has lifted. It should record the condition of the gutters and downspouts, because the crew will have to work around them. A note that only says roof, 28 squares, looks fine has told you the roofer's total and nothing about how it was reached.
Why the notes matter on a St. Louis roof
Freeze and thaw cycles in the St. Louis area lift the edges of old flashing and open small gaps at step flashing around chimneys and walls. Ice damming at the eave can leave a dark band on the lower courses and wet fascia that a quick look from the ground will miss. Hail season brings dents to metal vents, drip edge and other soft metal that a survey should name by location. If a roofer's notes skip the eave, the step flashing and the vents, the bid may not account for the work those spots will need once the old shingles come off.
The age of the roof matters too. A three-tab roof that has been repaired many times may no longer be worth patching, and a survey note should say so plainly rather than leave that choice to be discovered on the ladder.
Compare the notes side by side
Put the survey notes from each roofer on one table. Use a row for each item the notes cover: slope count, pitch, layers, penetrations, flashing condition, gutter condition, decking notes and access. Then mark which roofers recorded each item. The gaps tell you which bid is likely to change after signing. If one roofer lists nine pipe boots and another lists none, one of them did not look at the roof closely enough or did not write down what they saw.
Do not treat a difference between notes as a verdict on which roofer is honest. Two surveyors can look at the same roof and write it down differently. The point is to find the items one set of notes is missing, then ask the roofer about those items in writing.
Short notes are not always weak notes
A small, simple roof may need only a short survey. A ranch with one main slope and a single vent stack can be described in a few lines and still be complete. The test is not length. The test is whether the note lets you see the same roof the roofer saw. If you can count the slopes, the vents and the flashing from the note, it is useful. If you cannot, ask for more.
What to ask each roofer
- Will you give me a copy of the survey notes in writing before I sign?
- Which roof slopes did you measure, and at what pitch?
- How many penetrations did you count, and where are they listed?
- Did you find one layer or more than one, and how did you confirm it?
- What did you see at the eaves, the step flashing and the chimney?
- Which gutters or downspouts will the crew have to move or remove?
- What in your notes would change the price if the tear-off showed something different?
When a roofer will not share notes
A roofer who will not provide survey notes has not necessarily done a poor survey. But without the notes you have no way to check the bid against what was seen, so you cannot compare it with the others on equal footing. Ask again in writing. If the answer is still a verbal summary, treat the bid as an opinion until the notes arrive.
Keep your own copy
Save each set of notes with the date you received it and the roofer's name on the first page. If a roofer later changes the scope, the original survey is your reference for what they said they saw. Keep the notes alongside the signed proposal, the photos from the visit and any written replies to your questions. Those papers are the record of what each roofer knew before the number was final, and they are the first thing to check if the crew finds something different on tear-off day.
Keys Roofing documents damage, puts a written scope with photos and measurements in the homeowner's hands, and attends as the contractor while the homeowner deals with their own insurer. If you have a question about a survey note, call the office at (314) 220-2333.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.