Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Compare Each Roofer's Plan for Your Wheelchair Ramp Path on Roof Day

A ramp or lift path has to stay clear on roof day, so compare how each roofer marks, protects and reopens it before you sign.

If someone in your house uses a wheelchair, a walker or a motorized scooter, the path from the street to the front door, or from the driveway to the side entry, is probably the route you use every day without thinking about it. A ramp, a threshold lift or a stair lift changes that path into something a crew can easily block. On roof day, a dumpster in the drive, a stack of shingle bundles on the walk or a ladder set across a ramp can turn a short trip into a hazard. That is why the path deserves its own line in each roofing bid.

This page is for the homeowner who has already narrowed the field and is comparing how each roofer plans to keep the path open. The question is not whether a roofer is good at roofing. It is whether the written plan says where the crew will stand, stage and walk, and what happens when the plan breaks down during a wet day or an early start.

Roofer comparison

Start by reading each bid for the words it uses about access. Some bids say the crew will work around obstacles. That phrase tells you nothing about a ramp, a lift rail or the landing at the top. Look for a sentence that names the ramp or lift by location, states the path it will keep clear, and says who moves material out of the way when the crew needs to pass.

Next, check where each roofer plans to put the dumpster, the material trailer and the stack of old shingles. A ramp that runs along a side yard can be the same ramp the crew needs for its ladder or hoist. Two bids may describe the same house and still put the staging area in different places. Ask each roofer to mark the staging spot on a copy of your site plan or a photo of the lot, then compare the marks side by side. A difference of a few feet can decide whether a wheelchair can turn at the landing.

Also compare how each bid handles the moment a crew member is in the path while a resident is trying to get in or out. Some roofers will say the crew will stop and wait. Others will say the crew will keep the path clear with a cone, a rope or a designated spot. Neither answer is complete until it says who is responsible for the clear path at each hour of the day, including the time before the crew arrives and after it leaves.

Timing matters too. A roofer who starts at dawn may need the path clear before a resident is up and moving, while a roofer who works into the afternoon may leave materials out overnight. Ask each roofer whether anything will be left on the walk, ramp or landing when the crew leaves for the day, and who is responsible if a delivery arrives while the path is still blocked. A delivery truck that backs onto a driveway can be the most disruptive part of the day for someone who needs a clear route in and out.

What it costs

Clearing a path does not usually show up as its own line in a roof bid. It is hidden in labor hours, dumpster placement and the time it takes to set and remove barriers. That makes it easy to skip when you compare totals. A bid that is slightly cheaper because it does not include a protected path may still cost you more if the path has to be fixed, re-cut or cleared at your expense later.

Ask each roofer whether protection for your ramp, lift or landing is included in the price or priced as an extra. If a roofer prices protective boards, plywood over a landing or a temporary rail, ask for the material and the labor as separate figures. If a roofer says the ramp is included, ask what that means in writing: how many sheets of protection, which surfaces, and whether they are replaced if they are damaged.

Also ask whether any work is needed to repair the path after the job. A ramp surface can be scratched by a dragged ladder or stained by tar and shingle grit. A stair lift track can be bumped by a bundle. Ask each roofer to state in writing who fixes damage to the ramp, lift or landing caused by the crew, and whether that repair is included in the bid or billed separately.

Compare the cost of timing as well. A bid that adds a second delivery to stage materials somewhere else may move the problem rather than solve it, and that second delivery can carry its own charge. Ask whether each roofer's total includes one delivery or several, and whether any return trip for a forgotten item is billed.

What to ask

Bring these questions to each roofer before you sign, and write down the answers as they are given:

  1. Where will the crew stage the dumpster, the trailer and the old shingles, measured from the nearest edge of the ramp or lift?
  2. Which exact path will stay clear from the street, driveway or curb to the entry used every day?
  3. Who is responsible for keeping that path clear at the start of each workday, and who checks it at the end?
  4. What protection goes over the ramp surface, lift track or landing, and is it included in the bid?
  5. If the ramp or lift is damaged by the crew, who repairs it, on what schedule, and at whose cost?
  6. Will someone from the crew be on site to help with the path on the first day, and who is the contact if a problem appears?
  7. If a rain day or a late start changes the staging plan, will you be told before the crew moves anything?

Keys Roofing can be reached at (314) 220-2333 if you want to talk through the path on your own lot before you compare bids. Bring a site photo or a rough sketch that shows the ramp, the lift and the entry you use most. A written answer to each question is more useful than a verbal promise, so ask for the answers to appear in the written scope.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection