A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Compare Each Roofer's Answer When Light Rail Runs Near Your Lot

Ask each roofer how the crew will reach your roof when a light rail line, its crossings and its vibration sit near your lot.

If your house sits within sight of a light rail line, the roof job has a schedule you did not set. Trains run on their own timetable, crossing gates drop when a train approaches, and the strip between your curb and the tracks may belong to someone other than you. Before you compare two roof bids, find out how each roofer plans to get a shingle truck, a dumpster and a crew past that line without losing a day.

Roofer comparison

Start with the route. Ask each roofer which way the shingle truck will come in, whether it has to cross the tracks, and where it will stop. A truck that waits at a gate for several minutes on each run adds up over a multi-day tear-off, and a bid that assumes a clear turn at the curb may not hold once the trucks start cycling. Write each answer down side by side. Two answers that name the same street are easier to compare than two answers that say "we will figure it out."

Next, ask where the dumpster will sit. A dumpster placed on a public right-of-way needs its own permission, and a lot that backs onto a rail corridor may have a fence line or an easement that limits where anything can be set. Ask whether the roofer has worked on a lot like yours, and ask which side of the house the staging area sits on. A staging spot on the far side of the house may be easier to reach from a side street, but it may also put the material farther from the ladder.

Pull the printed timetable for the line nearest your house and mark the crossing times that fall during the hours the crew is on site. This is something you can do before any roofer visits. A crew that starts at 7 a.m. and a train that passes at 7:15 may mean a gate that closes just as the first truck arrives. Bring that list to each estimate visit and ask each roofer to walk the route with you so the answer is tied to your actual street.

Vibration comes up less often, but it matters for an older house. Heavy trucks and a passing train can both shake a ladder set against a wall. Ask each roofer whether the ladder will be tied off at the eave and whether the crew will move it when a train passes. Some roofers will say they stop work when a train goes by. Others will say nothing. The difference is worth writing into the scope, especially if you have plaster ceilings or a chimney that already shows movement.

What it costs

A longer route is not free. If the bid assumes a shingle delivery at a certain time, and a closed crossing or a rerouted truck pushes the delivery later, someone pays for the wait. Ask each roofer how a delayed delivery is billed. Ask whether a rerouted truck adds a trip charge, whether a crew that waits at a gate is billed for the wait, and whether an extra dumpster pickup appears as a line item or inside the total.

Compare these numbers on the same sheet. A bid that is lower because it leaves out staging and delivery may carry a line that shows up later as a change order. The same is true for a bid that names a flat rate for delivery but says nothing about a second truck or a second trip. Put the words "delivery," "dumpster," "wait time" and "trip" next to each price and mark which bid has each one. A bid with no mention of these words has not priced them, even if the total looks clean.

Light rail on its own does not change the price of shingles or the labor to install them. It changes how many hours the crew spends moving material. That is why the question belongs in the bid itself and not in a side conversation at the end of the estimate visit.

What to ask

Send each roofer the same three questions in writing and keep the replies:

  1. Which route will the shingle truck and dumpster use, and does that route cross the rail line?
  2. If a crossing gate closes during a delivery, how long will the crew wait, and who pays for that wait?
  3. Will the ladder be secured at the eave when a train or heavy truck passes, and will the crew stop work for the train?

Ask one more question that is easy to skip: if the rail operator or a city crew needs access to the corridor during your job, who tells the roofer, and how quickly does the crew get that message? Your roofer cannot control the schedule of a rail line, but a written plan for a gate closure or a track maintenance window keeps the crew from standing idle without a record of why.

If a roofer's answer is "we have never had a problem," ask what they did when a problem came up. A specific description of a past job near a crossing tells you more than a general assurance. Ask for a reference whose lot sits near a line like yours, and call that reference with the same three questions.

What to put in writing

A bid that answers these questions still needs a line in the written scope that matches the answer. Look for the route, the dumpster placement, the delivery window and the wait-time rule. If an answer exists only in conversation, ask for it in an email before you sign, so the next person who reads the file sees the same plan you agreed to.

Keys Roofing puts a written scope with photos and measurements in your hands, and the crew attends the job as the contractor. If a rail operator or city crew closes a lane or a gate during the work, that is a schedule change the crew should document, and you should keep the written record next to your own call log. For questions about the job, the office number is (314) 220-2333.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection