Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Compare Each Roofer's Answer When Another Crew Works Your Block

Ask each roofer who holds the curb, the drive and the dumpster spot when a second crew is on your block the same week.

A roof job on a St. Louis block rarely happens alone. Two or three houses on the same street can be re-roofed in the same month, and a roofer's crew, trailer and shingle truck often share the same curb and parking space as a neighbor's contractor. When you collect bids, most of the questions go to scope and price. This page covers a narrower question: what each roofer says will happen to your block when another crew is working on it at the same time.

Why a second crew changes your roof day

The shingle truck needs a place to stop, usually at the curb or in the drive apron. If a neighbor has a dumpster in the right-of-way, a tear-off crew, or a siding contractor's pallet on the street, the shingle truck may have to park farther away and the crew may have to carry bundles farther. On a day when the crew is already short-handed, that walk adds up. The dumpster is the same. Many municipal street desks issue a permit for a dumpster in the right-of-way, and a second permit on the same block can narrow the lane both crews are using.

St. Louis freeze and thaw cycles add a second layer. Late winter and early spring are when several roofs on one street often come off in the same stretch of dry days. The crews all want the same forecast window, and a delayed start on one house can push a roof onto a day another crew has already booked for its own lot.

There is also the question of who is on the block at the end of the day. A crew working two houses down may leave tools, ladders or stacked bundles in the same yard, and a neighbor may assume the nails in the gutter came from your roof. Your roofer's answer on this point tells you whether the crew keeps its own debris contained or treats the whole street as one job site.

Questions to ask each roofer

Put these questions in writing so each roofer answers the same way. Ask them in this order, and keep the replies in one folder with the bid.

  1. Where will the shingle truck stop, and does that spot depend on a second crew's dumpster or pallet on the same block?
  2. Who applies for the dumpster permit if one is needed, and does the permit name your address or only the street?
  3. If another crew is blocking the curb on delivery day, what is your plan, and who calls you that morning?
  4. Will your crew carry its tools and materials across a neighbor's yard, and whose written permission do you need for that?
  5. Does your bid assume you are the only contractor on the block that week, or does it account for a second crew?
  6. If a second crew leaves nails, granules or wrap in the gutter on your side, who sweeps it and on what day?
  7. Who is the named contact on your job, and how do you reach that person if a neighbor's crew is in the way?

The seventh question matters more than it looks. A roofer with one named contact, and a plan for reaching that person during a busy week, tends to get the trailer moved faster than a roofer who answers the phone with whoever is nearest the truck.

What a good answer contains

A useful reply names a place, a time and a person. "We will find a spot" is not an answer. "The shingle truck will stop at the curb in front of the house unless the curb is taken, and the dispatcher will call you at seven the morning of delivery" is an answer you can check. Ask for the reply in writing, and treat a verbal answer as a note to confirm rather than a commitment.

Watch for answers that move the problem onto you. A roofer who says "you'll need to ask the neighbor" has not said who pays for the extra hauling, or whether the second crew's debris is their responsibility. You can ask the neighbor, but the roofer should still say how the day will run and what happens if the neighbor says no.

What it costs

The costs here are small and specific. A dumpster permit, if your municipality requires one, is a fee you should see on the bid or confirm separately. A plan that moves the shingle truck farther from the house can add labor hours for hauling bundles, and that time should be named in the bid rather than folded into a lump sum. Ask each roofer whether bundle hauling beyond a set distance is included or billed separately. If the answer is that it is included, ask for the distance the price is built around.

Some roofers will add a line for traffic cones or signs on the street side. Others will not. Ask each one to name that line or confirm it is absent, so the comparison stays honest about what each bid covers.

How to compare the answers

Set up a sheet with one row per question and one column per roofer. Fill each cell with the answer as written, not with your reading of it. Then mark each cell as specific, general or missing. A specific answer names a place, a time, a person or a number. A general answer says the roofer will "handle it". A missing answer is one the roofer did not address after you asked.

Count the specific answers in each column. A roofer with five or six specific answers across seven questions has given you enough to plan a roof day around. A roofer with two has given you a conversation to finish before you sign. Neither count settles the choice by itself, but the difference between columns shows where to call back.

If two roofers both answer well, break the tie on the contact question. The roofer who names a person you can reach on roof day, with a phone number and a plan for the case where a neighbor's crew blocks the drive, has given you the more usable answer. Keep the written reply, because it is the thing you will point to on the morning of the delivery.

Before you sign

Check that the written reply matches the scope. If a roofer says the shingle truck will stop at the curb but the scope describes a drive apron delivery, the two documents disagree, and you should ask which one holds. Keep a dated copy. On a block where two or three roofs are going on at once, a short written plan is often the difference between a smooth delivery and a pallet sitting at the end of a driveway on a wet morning.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection