
Compare Each Roofer's Answer on the Chimney Flue Liner Before the Tear-Off
A chimney flue liner is not roofing work, but the tear-off can expose it, so ask each roofer who inspects it and writes down what they find.
If your house has a masonry chimney, the roof work will bring the crew close to the flue. Most roof bids price the flashing around the chimney and the cap on top. Far fewer say anything about the flue liner inside, which is the clay tile or metal pipe that carries smoke and combustion gas up through the stack. The liner is not roofing work in the usual sense, so it often falls between the chimney sweep, the mason and the roofer. The tear-off can expose it anyway, which is why the question belongs on your comparison sheet.
Why the liner comes up during a roof job
A roofer working around a chimney usually has to lift or reset the counterflashing, pull or rebuild the cap, and repair the mortar crown where the masonry meets the shingles. Any of those steps puts the top of the flue in view. A crew reseating a cap may see a cracked tile, a missing section of liner, or a crown that has separated from the flue. Some of those problems are cosmetic. Others mean the chimney should not be used until a specialist looks at it. Whatever the crew sees, you need it written down before the crew moves on to the next slope.
St. Louis winters add a reason to ask now. Freeze and thaw cycles push water into the mortar crown and into any open joint, and repeated cycles widen small cracks. A liner that is already cracked lets moisture reach the masonry and can let combustion byproducts travel where they should not. Inspecting a flue is a separate trade with its own report, so a roof bid can be accurate about the roof and still say nothing about the liner. That gap is what you are trying to find.
Roofer comparison: what to look for in each bid
Lay the bids side by side and check three things. The first is whether the bid mentions the flue top at all. Some bids say "chimney flashing" and stop there. Others name the cap, the crown and the flue separately. A bid that names the cap is describing work the crew will physically touch, which is a good sign that someone thought about the top of the flue.
The second is who inspects the liner, and whether that inspection is in the price. A roofer may say the liner is outside their scope, which is a reasonable answer as long as it is said plainly. Another roofer may say they will look at it, but without naming what they will check. Ask each one to say, in one sentence, whether they will look at the liner and what they will do with what they see.
The third is what the roofer does if a problem appears after the cap comes off. The answers should be specific. A useful answer is that the crew stops work on the chimney, photographs what they found with a date stamp, measures it, and calls you before anything else happens. A weak answer is that they will "take care of it" or that the crew will keep going. The difference matters because a cracked liner found on the roof is far easier to deal with on day one than after the shingles are down and the flashing is set.
What it costs, and what to ask
Chimney work in a roof bid tends to come in one of two forms. One is a lump sum for the cap and flashing, which covers the work the roofer already planned. The other is an allowance or a separate line for crown repair, which covers work that depends on what the crew finds. Neither is wrong, but they are not the same number. If the bid has an allowance, ask what the allowance covers, how the crew reports the work against it, and whether you approve each step before it is billed.
Ask whether the price assumes the liner is sound. If it does, ask what the bid says about the cost of a liner repair or replacement if the crew finds a problem. The answer may be that the roofer does not do liner work and will refer you to a specialist, and that is an acceptable answer. What is not acceptable is a bid that says nothing and then leaves you to discover the cost after the chimney is open. Put the question in writing and ask for the reply in writing too.
If you have a separate sweep or mason already booked, ask each roofer whether they will coordinate with that person on the same day. A roofer who is willing to share the chimney with a specialist on a single site visit can save you a second trip and a second set of ladders on the roof. A roofer who wants the specialist to come after the roof is done should say so, because that sequence can leave the flue exposed for days.
What to ask each roofer
- Will you lift or reset the chimney cap, and is that work inside my price or priced separately?
- When your crew opens the flue top, who looks at the liner, and do you photograph what you see with a date stamp?
- If you find a cracked, missing or loose liner section, do you stop the chimney work and call me before you continue?
- Who on your side judges whether a liner is safe to use, and will my sweep or mason be the contact for that decision?
- Will the liner finding go into the written scope with photos and measurements, and will I get a copy before the crew leaves the chimney?
- Does your bid assume the liner is sound, and what does the bid say about the cost of a repair?
Write each answer down, with the date and the name of the person who gave it. A roofer who answers all six questions in plain terms has told you how the chimney work will be handled. A roofer who answers some of them with a shrug has also told you something, and that is worth knowing before you choose.
Where the line sits between roofing and the flue
The roofer's job is the roof around the flue: the flashing, the cap, the crown and the shingles that meet the masonry. The liner belongs to a chimney specialist, and the specialist's report is the document that decides whether the flue can be used. A good bid makes that boundary clear. A roof contractor documents what the crew can see from the roof and from the top of the stack, puts that record in writing with photos and measurements, and attends the job as the contractor while the homeowner arranges any specialist work. Keys Roofing works this way on chimney flashing and cap jobs. If you want to know exactly where your own bid draws that line, call the office at (314) 220-2333 before you sign and ask for the chimney section of the scope to be read back to you.
Chimney liners are one of the items that can change a roof comparison without changing the roof price on the page. Two bids can show the same shingles, the same square count and the same flashing price, and still leave the flue top in very different hands. Asking about the liner now means that when the cap comes off, the question has already been answered, and nobody is deciding what to do about a crack while the crew waits on the ladder.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.