Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Compare Each Roofer's Answer on How Many Ladders Stand at the Eave

Ask each roofer how many ladders will rest against your eave at once, which walls they will use, and whether any ladder stays up overnight.

Two roofers can quote the same house, plan the same crew size, and still set a different number of ladders against your eave on the first morning. The count matters more than it sounds. Every ladder is a place where a worker climbs, a place where a foot can slip on wet clay, and a place where a rail can crack a gutter or dent a window trim piece. Asking how many ladders will be up at the same time is a plain question with a plain answer, and the answer shows how the crew plans the day.

Why the count changes the day

A tear-off on a typical St. Louis ranch or two-story house has to reach the eave on at least two sides. Most roofs also have a valley, a hip or a dormer where a second worker needs access at the same moment. A crew can run the whole job from one ladder on one wall, moving it every few squares, or it can set several ladders so that different workers reach different slopes at once. Each approach has a cost. One ladder means long stretches of climbing, carrying and moving, and it stretches the start of each new slope while the crew waits for the ladder to be repositioned. Several ladders mean more setup in the morning and more foot traffic around your foundation, your downspouts and your side yard.

Federal ladder rules ask that the side rails of a portable ladder extend about three feet past the landing point, so a ladder that reaches the eave has to extend above it. The commonly taught setup is a base about one foot out from the wall for every four feet of height. Those two rules together decide how much room a ladder needs on the lot. On a two-story house, the base of a ladder that reaches the eave can sit several feet from the wall, which is where the trouble starts on a narrow side yard, near a window well or beside a porch step.

What a St. Louis lot does to the ladder plan

Most lots here have a few things that decide where a ladder can stand. Clay soil that holds water after a spring rain can let the feet of an extension ladder sink, especially in the strip of ground under a downspout where the water has been running for years. Freeze and thaw cycles lift the edge of a walk every winter, so a ladder set on a walkway in November may rest on a slab that has tilted by March. Brick veneer, stone sills and window wells are common along the eave of older houses in the county, and a ladder foot dropped on a sill can chip the stone or crack a well cover.

Older neighborhoods bring a different problem. The side yard may be narrower than a standard extension ladder is long, so the crew has to choose between a shorter ladder that cannot climb as high and a longer one that needs more room to stand. Ask the roofer which of those trade-offs they expect on your lot, and whether they walked the side yard with a tape before they wrote the number down. A roofer who measured the side yard will usually be able to describe the ladder path without looking at the plan.

The questions to ask, and how to phrase them

Ask each roofer how many ladders will be against the house at the same time on the first day of tear-off, and which walls they will be on. Ask whether a ladder will be left against the house overnight. Some crews pull every ladder off the wall at the end of the day and lay them flat on the lot. Others leave one ladder up at the eave of the slope they plan to strip first, so they can start quickly the next morning. Both can be reasonable, but the answer tells you whether a ladder will be leaning on your gutter line while nobody is there.

Then ask for the answer in writing, either in the scope or in the job-day notes. A line that names the walls, the number of ladders on each wall, and when the ladders move will give you something you can check at the curb. A phrase such as as needed does not give you anything to check, and it leaves the decision to whoever is on the roof at eight in the morning.

What to listen for in each answer

  • A number with the walls named. Two ladders on the rear eave and one on the side eave is a plan. A few ladders around the house is a guess.
  • A statement about who moves each ladder. Some crews assign one worker to tend ladders all day. Others let each climber move his own. A named role gives you someone to call when a ladder is in the wrong place.
  • A plan for the ladder feet. Ask whether the crew uses pads or boards on soft ground, and whether anyone checks the footing after each move.
  • A plan for the gutters, the fascia and the trim. Ask whether the ladder rails will rest on the gutter, the fascia or the shingles, and what the crew will do if the only clear spot is against the trim.
  • A plan for the overnight. Ask whether any ladder will stay against the house after the last worker leaves, and who checks for it before the crew goes home.

How the answers usually differ

A roofer who plans to run the job from one ladder often says so quickly and points to the order of the slopes. That answer usually comes with a longer day and more moves, so ask how many times the ladder will be relocated on a steep pitch or a long rear eave. A roofer who plans several ladders usually names the walls and the number of climbers per wall. Ask how the crew keeps track of those ladders while people are on the roof, because a ladder left unattended on a busy street is a different problem from one left in a fenced back yard.

When an answer is vague, say so and ask again in the same words. Write down what the roofer said, the date, and the name of the person who said it. The reply will tell you more about how the crew plans than the number printed on the page, and a second answer that matches the first is worth more than one answer that sounds confident.

Where the ladder count fits in the rest of the bid

The ladder count is one line in a larger plan. It connects to the start time, the tear-off sequence, the material drop, the dumpster location and the route the crew uses to enter the property. A roofer who can name the ladder count can usually also name the walls they will touch first, which helps you plan your own movement through the house on that day. If you have pets, a child at home, or someone who uses a walker, mention it before the roofer settles the count, because the answer may change the number of ladders on the side of the house you use most.

Keys Roofing puts its written scope, with photos and measurements, in the homeowner's hands, so the ladder plan can sit beside the rest of the job on paper. Questions about the ladder count can go to the office at (314) 220-2333 before you choose a roofer or sign anything.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection