Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Cardinals Home Game Days Can Close the Lane Your Roof Truck Needs

Home game nights downtown can jam the streets your roof truck needs, so compare how each roofer plans delivery and crew arrival around them.

Home baseball nights downtown fill the streets around the ballpark with foot traffic, rideshare cars, and shuttle buses that wait at the curb for an hour after the final out. If your roof is coming off on one of those evenings, or on a weekday that shares a game-day schedule, the shingle truck and the crew trailer may have to stop several blocks away. A bid that says the crew arrives at seven will not help you if the truck is stuck at a light behind a bus.

This page is for the homeowner who has a short list of roofers and wants to know which one has thought about the street outside the house. Most roof bids are written as if the street is empty. Game days, festival weekends, and heavy traffic on a major arterial can turn a clean delivery into a long wait. The question is not whether each roofer might be late, because every roofer can be late. The question is whether each one has a plan for the streets that are predictably busy.

Roofer comparison

Start with the delivery. A shingle delivery is usually one of the first things to arrive on roof day, and a truck that cannot reach the curb can push the whole crew back. When you talk to each roofer, ask where the truck plans to stop and whether the company has used that stop before. A roofer who has worked on a block with event parking will often name a specific side street, a loading zone, or a time window that avoids the worst traffic. A roofer who answers only with "we will figure it out" has not thought about it yet.

Ask each roofer whether they check the event calendar before they set the date. Ballpark schedules, festival closures, and road work posted by the city or the county can all change which streets are open in a given week. A roofer who looks at those notices when the schedule is first drafted can move the tear-off by a day before the homeowner has to rearrange anything. A roofer who only looks at the calendar after the crew is booked may leave you to absorb the shift.

Ask for the arrival window, not just the start time. The window tells you how much slack is built into the plan. A crew that says it will start at seven and finish at four has no room for a late truck. A crew that says it will be on the lot between seven and eight, with the truck due by nine, has written the buffer down. You can place these two answers side by side on one sheet and see which bid has room in it.

Next, compare what each roofer says about the crew itself. Crew members who drive in from across the metro may sit in the same traffic as everyone else. Ask whether the crew carpools, whether the foreman calls you when the first vehicle is delayed, and which person on the team has your phone number. On a game day, the most useful answer is the one that tells you the crew is stuck before you notice the trailer is missing from the curb.

Finally, compare the streets. The homeowner often knows the block better than the roofer does. If your street has a stop sign at the corner where the truck would turn, or a school crossing that is busy in the late afternoon on a home game night, say so in writing before the schedule is set. A good roofer will ask about that stretch of pavement without being prompted. A roofer who does not ask has either not looked at your street on a map or has not planned for what the map shows.

What it costs

Traffic delays rarely appear as a line on a roof bid, which is why they cause surprises later. The cost of a late truck or a crew held at the curb is real even when nobody writes it down. Labor is paid by the day, by the square, or by some agreed unit, and a half day of waiting still takes up a half day on the calendar. Ask each roofer how a delay caused by traffic, rather than by weather or by a change the homeowner requested, gets treated. Some roofers absorb a short wait. Others have a standby rate. Some have a trip charge for a second delivery. Write each answer next to the price so you can see the full picture.

Do not confuse a standby rate with a surprise bill. A standby rate should be a number and a trigger. For example, it might say that a crew held at the curb for more than a stated number of minutes will be billed at a stated hourly figure. A vague sentence like "additional charges may apply" is not a number, and you cannot compare it with another bid. If one roofer gives you a clear figure and another says it depends, you have learned how the second bid is likely to read on the final invoice.

There is also a cost to the calendar. If the tear-off starts late because the dumpster could not be placed until after the crowds left, the old roof may stay open longer than planned. An open roof over a St. Louis evening is a different risk than an open roof on a quiet morning, especially when the forecast shows a line of storms moving in from the west. Ask how the roofer decides whether to close the roof for the night when a delayed arrival pushes work into the evening. That decision belongs in the written scope, and if the crew has to come back the next day to finish the closing, the return visit may carry its own charge.

Ask also who pays for a second delivery if the first truck cannot unload. A shingle order that has to be split between two trips can add a fuel or delivery line that a bid did not show. Some roofers include that cost in the material price. Others list it separately. Neither approach is wrong by itself, but you should be able to see which one each roofer uses before you compare totals.

What to ask

Bring these questions to every roofer on your list, and write the answers in your own notes so you can compare them directly.

  • Which side street or loading zone will the shingle truck use on delivery day, and has the crew used it on a comparable job?
  • What is the arrival window for the crew, and what is the latest time the truck is due on the lot?
  • Who calls the homeowner if the truck or the crew is held up, and from which number will the call come?
  • How is a traffic delay billed, if at all, and is that rate written into the contract?
  • If the crew cannot start on the planned day because of a game, a festival, or a road closure, how is the day rebooked, and will the new date be confirmed in writing?
  • Will the crew close the roof for the evening if work runs late, and who makes that decision on site?
  • Does the bid assume the dumpster can sit in the street, and if the city or county requires a permit for it, who applies for that permit?

Each answer should be short enough to fit on a comparison sheet. If a roofer needs several minutes to explain a single answer, that is useful information too. A clear answer usually names a number, a person, or a street. An unclear answer usually leans on the word "usually."

When you call the office, you can ask these questions directly. Keys Roofing can be reached at (314) 220-2333. Ask every roofer the same questions, and do not accept a general promise in place of a specific plan for the streets your truck has to use. The roofer who can describe the route, the window, and the call-back number before the first shingle is ordered is the one who has thought about the day.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection