
Bundle Wrap and Strapping Need a Destination in Each Roof Bid
Shingle bundles arrive wrapped and strapped, and somebody has to carry that plastic off your lot. Ask each roofer who, and when.
Every bundle of asphalt shingles comes off the truck in plastic film, and the bundles on a pallet are held together with strapping. Once the crew cuts the bands and peels the wrap, that material is waste, and it has to go somewhere. On a St. Louis lot, loose film gets caught in shrubs, drifts toward the storm inlet at the curb, and lifts off a yard in the first gust of an afternoon storm. Steel strapping is sharper than it looks, and it can cut a hand or puncture a tire on a trailer that sits on the drive overnight.
This page covers one small question that many roof bids skip: where the wrap and strapping go on the day the pallet is opened. It is a question about your lot, not the shingles, and it is easy to answer in writing before the trucks arrive. Keys Roofing's office line is (314) 220-2333 if you want to put it to the company directly.
Roofer comparison
Ask each roofer the same three things. First, who removes the wrap and strapping from your lot, and at what point in the day. Second, where the material is kept while the crew is still working, whether in the dumpster, in the truck, or on a tarp by the drive. Third, whether any of it leaves with the truck or waits for the next pickup. Write each answer beside the roofer's name so the replies line up.
A useful answer names a place and a person. "We clean up" does not say whether the crew sweeps the drive or leaves the plastic in the yard. "The dumpster" needs a follow-up, because a dumpster full of tear-off debris can leave no room for wrap, and open film blows out of an overfilled bin in wind. Ask whether the crew loads the film and strapping into the same bin as the old shingles or into a separate container, and ask who checks that the lot is clear at the end of each day.
Pay particular attention to the strapping. Steel bands get kicked into grass, and they catch on boot soles and mower tires. A roofer who has thought about this will say who walks the drive and the side yard with a magnet or rake before the crew leaves, and that they do it every day, not only on the final walk. If a roofer cannot say who does that, the question has not been thought through.
Compare these answers against the closeout packet as well. A clean lot is one of the things a finished job should show in writing, and a roofer who describes the cleanup clearly on day one is more likely to put it on paper at the end.
What it costs
Haul-away is usually a line somewhere in the bid, but it is not always the same line. Some quotes fold the disposal of wrap and strapping into the dumpster or tear-off disposal line. Others leave it out and expect the homeowner to pay for a separate pickup or to take the material to a drop-off site. Neither approach is wrong by itself, but a bid that is silent on the question leaves the cost open, and an open cost usually shows up on the final invoice.
Ask each roofer to name the line where the wrap and strapping are paid for. If the answer is "included in disposal," ask what disposal covers and whether the bid states a number of loads or a weight. If it is a separate pickup, ask for the price in writing and for the day it is scheduled. Do not accept a verbal range. A line item with a number is something you can compare, and an estimate given in conversation is not.
Recycling is a second cost question. Many curbside programs in the region do not accept plastic film, so bags of wrap cannot simply go into the recycling cart. Some haulers take film at a separate drop-off point, and some do not take it at all. Ask the roofer which route they use, and check the local hauler's rules yourself if the answer is vague. A roofer who sends the film to a particular facility should be able to name it.
What to ask
Put these questions to each roofer before you choose, and ask for the answers in writing on the bid or the job sheet. Each one can be answered in a sentence.
- Who removes the bundle wrap from my lot, and at what point in the day?
- Where is the wrap and strapping kept while the crew is still working?
- Do steel bands go into a separate container, and who sweeps the drive and side yard for them?
- Is wrap and strapping disposal inside the dumpster line, or a separate charge?
- If the dumpster is full before the job ends, where does the film go?
- If wind is forecast, who bags or weights the loose film before the crew leaves?
- Does any of the material leave with the truck the same day?
- Who checks the lot at the end of each day, and who signs off that it is clear?
Treat a blank answer as an answer. If one roofer replies to every question except the one about steel bands, that gap shows where the cleanup is less settled. Ask that roofer to fill in the missing line before you compare totals, and compare the replies in the order you asked them.
If your order is Atlas or Malarkey shingles, ask the roofer to name the product line on the delivery slip so you can match the wrap you see on the pallet to the order you approved. That is a small check, it costs nothing, and it closes one more loop that is easy to leave open on a busy delivery morning.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.