Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Bring a Competing Written Bid to Each Roofer and Compare the Replies

A lower written bid from another roofer is a fact you can use, so ask each roofer what they will do with it and get the answer on paper.

A second written bid helps you only if you know what each roofer does with it. Some roofers will re-check their numbers against the lower figure and tell you which lines differ. Others will say the lower bid is not comparable and stop there. A few will hold their price without comment. Each of those replies tells you something different, and the differences are easier to see when you put the same question to every roofer on the same day.

Roofer comparison

Before you show anyone a competing number, make the two bids comparable. Put both on one sheet and list the square count, the shingle line, underlayment, ice and water membrane at the eaves and valleys, drip edge, starter, ridge, step and counter flashing, tear-off, disposal and permit. If one bid says by others or leaves a line blank, that gap is the first thing to ask about, because a lower total often means a missing line rather than a cheaper roof.

St. Louis roofs make this matter more than most. Freeze-thaw cycles push ice under the first course at the eave, and hail season leaves dents and granule loss that a crew may or may not replace. A bid that is lower because it skips the ice and water membrane at the eave is not the same roof, even if the shingle name matches. The same goes for a bid that prices the old flashing as reused when the flashing has already failed at a chimney or sidewall. Ask the roofer to mark those lines as included, excluded or pending, and compare the marked sheets rather than the totals.

Then look at how each roofer responds to the competing number. A useful reply is specific. It names the lines that differ, says what it would change, and gives the new total with a date. A weak reply says it can do better without showing what moves. A third reply says the other company is cutting corners, with no line item to check. You can record each answer in your own notes as it comes in, alongside the date and the time you asked, so that you can compare them later without relying on memory.

Give every roofer the same written information. That means the same photos, the same measurements, the same list of questions and the same deadline for a reply. If one roofer gets a different scope or a different date, you are no longer comparing answers to one question. Keys Roofing can be reached at (314) 220-2333, and the office can tell you what it needs to see before it would revise a figure, which is a fair thing to ask any roofer.

What it costs

The price of a competing bid is not just the number on the page. It includes the time you spend re-reading two scopes, the trip a roofer may charge for a second site visit, and any fee for a new measurement. Ask each roofer whether a revised bid costs you anything and whether a new measurement is included. Some roofers will re-price from the existing measurement at no charge. Others will need to measure again, and that can change the square count and therefore the price.

Watch the difference between a revised price and a new price with new terms. If a roofer lowers the number but drops the ice and water membrane, extends the start date, or switches from a fixed price to unit pricing for the decking, the lower figure has moved the risk onto you. Ask for the revised bid to show the same scope line by line, with any changes marked. Then the new total can be compared directly with the old one.

Ask about deposits and payment timing as well. A roofer who asks for a larger deposit to hold a lower price may be pricing in a material cost that changes before the crew arrives. Ask whether the price holds if shingles run short, and ask what the roofer does with a deposit if the date slips. Those answers affect the real cost of the bid even when the page total looks better.

Finally, ask whether the competing number is a reason to change scope at all. Sometimes the other bid includes a line you did not need, such as a second gutter run you already have. Sometimes it omits a line you do need. Only a line-by-line comparison will tell you which is which, so keep the work on the lines and leave the headline total alone until you have read both.

What to ask

Use the same short list with each roofer, and write the answers down beside the question.

  1. Which lines in my competing bid would you price differently, and by how much each?
  2. Is the shingle and underlayment named exactly the same way in both bids, and if not, what is the difference?
  3. Does your revised price include the ice and water membrane at the eaves, the valleys and the penetrations?
  4. Will you re-price from the measurement you already took, or will you measure again, and does that cost me anything?
  5. How long will the revised price hold, and does it depend on the shingle supply or the start date?
  6. What do you need from me to confirm the new number, and by what date?
  7. If the competing bid is lower because it leaves out a line, will you tell me which line it is in writing?

Ask each roofer to put the answers in writing, either in a revised bid or in an email with the same line numbers. A verbal promise to match a price is hard to compare later. A written reply with the changed lines marked is easy to check against the original scope when the crew arrives.

Keep one folder for all the replies, and do not let the answers spread across texts, voicemails and three separate inboxes. When you have every reply on the same sheet, you can see which roofers answered the question you asked, which ones changed only the price, and which ones could not say what they would change. That pattern is the comparison that matters before you choose a start date.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection