Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Blank Cells Are Answers: Marking Roofers Who Skip a Line

A blank line on a roof bid is a missing answer, so mark it as a question and get it in writing before you compare totals.

Most roof bids have a few lines that say nothing. A line for tear-off disposal might show a price but no hauler. A row for ice and water shield might be left empty. When you lay two bids side by side, those empty cells look like zeros, and a tired homeowner reads them as savings. They are not savings. They are questions the roofer did not answer.

Roofer comparison

Start by building the comparison grid yourself, before you open either bid. List every line a complete roof bid should carry for a St. Louis job: tear-off, underlayment, ice and water shield at the eaves and valleys, drip edge, starter, ridge vent or ridge cap, flashing at chimneys and walls, pipe boots, disposal, and permit. Write those down in a column. Then fill each roofer's bid into the grid, one row at a time.

Give the grid a fixed order and keep it the same for every roofer. The order matters less than the consistency. When you read the bids a week later, you will want the tear-off line in the same place on each sheet, so your eye does not have to hunt for it.

When a cell is blank, do not guess what the roofer meant. Mark it with a short code, such as "missing" or "unclear," and note which bid it came from. A missing line is not the same as an included line at zero dollars, and it is not the same as an excluded line either. The bid has to say which one it is.

The gap matters most in St. Louis for a few reasons. Freeze-thaw cycles push water under the first course of shingles at the eave, so a bid that skips ice and water shield on a north or shaded slope leaves a real exposure. Spring hail season adds a second reason, because the record of your roof's condition depends on what the crew writes down when the old shingles come off. And the municipal permit desks across St. Louis County ask for specific scope descriptions, so a vague bid can slow the permit before anyone picks up a nail gun.

What it costs

A blank line usually hides a cost somewhere. If the disposal line is empty, the hauling may be billed later as an add-on, or the dumpster may be priced separately with an overage fee. If the flashing line is empty, the roofer may price it once the old flashing comes off and shows rust or rot. Neither one is necessarily dishonest, but both change the final number.

So when you compare totals, treat each blank as a range instead of a zero. Ask the roofer for the figure they would charge if that line became necessary. If they refuse to give one, write down the refusal. That refusal is information too, and it belongs on the sheet next to the price.

It also helps to count the filled lines against the number of lines in the grid. A bid with twelve complete lines and one open question is easier to trust than a bid with a low total and five empty rows. A lower total with empty rows may simply be a smaller bid, not a cheaper roof. Put both numbers on the sheet so you can see the difference.

A low total is also easier to misread when the bids are not built the same way. One bid may list chimney flashing as a line of its own, while another folds it into labor. Compare the grid cell by cell before you compare the bottom line, and note where a single price covers two lines on one bid and two separate prices on the other.

What to ask

Send each roofer the same short list of questions about their blank lines. Keep the wording identical so the replies compare fairly. For example, you might write: "Your bid does not show a price for removing the old drip edge. Is that included, and if not, what would it add?" Ask one question per blank line. Do not bundle five questions into one email, because the reply will skip the hard ones.

Ask for answers in writing. A phone answer is useful for speed, but a written reply is what you can compare later and what the roofer can be held to. If the roofer answers by phone, ask them to send the same answer in an email or a revised bid before you decide.

Watch how each roofer responds to the question itself. Some will fill the line on the spot and send a revised bid within a day or two. Others will say the line is covered by another line, and point you to a sentence that does not actually mention it. Write down the pointer and check the sentence yourself. A roofer who answers a specific question with a specific number is giving you a comparison point. A roofer who answers with a general statement is giving you a different kind of answer, and that difference belongs on the sheet.

Set a reply window. If a roofer has not answered a question within a few business days, send a short reminder and note the date. A slow reply on a blank line is not automatically a reason to walk away, but it is a fact you should be able to compare. The same goes for a roofer who fills every blank with a different answer each time you ask. Ask the same question twice, a week apart, and see whether the answer holds.

Keys Roofing can be reached at (314) 220-2333 if you want to talk through the scope or book a look at your roof. Ask for the written scope and photos along with your questions, so you have something to compare when the bids come back.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection