Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Ask Each Roofer Who Wears Eye Protection on Your Lot

Eye protection on a St. Louis roof lot is a crew rule, not a courtesy, and each roofer's answer shows whether it is written down and enforced.

Roof day on a St. Louis lot is loud, and the things that fly are not all shingle. Nails leave the gun at speed, tear-off grit lifts off the deck when the wind picks up, and the ground around the eave collects bits of old flashing, granules, and chalk line dust. A homeowner, a child on a bike, or a neighbor walking a dog can be in the wrong spot at the wrong moment. Eye protection is the cheapest line of defense on that lot, and it is one of the easiest things to skip without anyone noticing.

This page is for a homeowner who has two or three roofer names, a stack of bids, and one open question: which roofer treats eye protection as a written crew rule, and which one treats it as something the crew does when someone remembers. The answers are easy to compare because they are short, and the difference shows in the words a roofer chooses.

What actually flies on roof day

Three activities put the most objects in the air. The first is nailing. A pneumatic nailer drives coil or strip nails through shingle tabs and into the deck, and a misfire, a bent nail, or a nail that glances off a knot can send a fragment sideways. The second is tear-off. Old asphalt shingles break apart when they are pried up, and granules and brittle tab pieces drop, skid, and sometimes rise on a gust. The third is cutting. Crews cut starter strip, ridge caps, and drip edge with snips, shears, and sometimes a circular saw, and metal cutoffs are sharp enough to injure an eye in a single motion.

St. Louis adds its own load. Spring and fall winds cross open ground in the county, and a dry summer leaves loose clay and gravel on driveways and patios near the work zone. A gust that lifts a sheet of underlayment or a bundle wrapper can carry it onto a yard where nobody is looking up.

Where a roofer's answer should start

A solid answer names a rule, a gear list, and a place. The rule says who has to wear what and when. The gear list names the glasses or goggles, and ideally refers to the common impact standard for safety eyewear, ANSI/ISEA Z87.1. The place says where the rule applies: on the roof, on the ground, at the dumpster, and inside the drop zone. Federal construction rules in 29 CFR 1926.102 require eye and face protection where workers face flying particles or other eye hazards, so a roofer who cannot say what the crew wears is describing a gap, not a practice.

A vague answer sounds like "our guys are careful" or "we always wear what's needed." Neither sentence tells you who decides what is needed, whether a visitor gets handed a pair, or what the crew does when a homeowner walks into the drop zone. Those are the points that matter when something goes wrong.

Questions to put to each roofer

Send the same five questions to every roofer, in the same order, and write each answer beside its question. The goal is to make the answers comparable, not to catch anyone out.

  1. Which eye protection does each crew member wear on the roof, and which does the ground crew wear in the yard?
  2. Is eye protection a written company rule, and can you see that rule before the crew starts?
  3. Who may tell a worker to stop when the drop zone is not clear, and what words stop the work?
  4. If a homeowner, a visitor, or a child walks into the work area, what does the crew do, and who handles it?
  5. If a crew member is struck or gets debris in an eye, who calls for help, and which clinic or emergency room does the crew use?

The first question tests specifics. The second tests whether the rule exists on paper. The third tests whether anyone is empowered to stop a dangerous moment. The fourth covers your own family and the neighbors. The fifth covers the plan that matters only after a bad moment, and a roofer who has thought about it can name the response without hesitating.

What the answers tell you

Compare the answers on three measures: specific, written, and visitor-aware. A roofer who names the glasses, points to a written rule, and says the homeowner is handed a pair before walking near the drop zone has answered all three. A roofer who names the glasses but says the crew decides on the day has answered one. A roofer who says the crew is careful has answered none.

Pay attention to the gap between the roof and the ground. Many crews are careful on the roof, where a fall is the first worry, and less careful at the dumpster, where a fragment can carry across the lot at head height. A roofer whose answer covers both places has thought about the whole lot, not only the part where the photos are taken.

The answer should also match the rest of the bid. If the bid names a supervisor who walks the site daily, the eye protection rule should be something that supervisor checks. If the bid names a single crew leader who is not on site, the answer should explain how the rule reaches the crew each morning. Consistency between the bid and the answer is a good sign, and a gap between them is worth a follow-up question.

When the answer is vague

Vague answers are common, and most of them are not a sign of bad intent. Many small crews have never written a safety sheet and answer from habit. That is a starting point, but it is not a basis for a signed contract. Ask the roofer to put the eye protection rule in writing and send it before the start date. A roofer who can do that in a day is describing a practice that exists. A roofer who cannot is describing a habit that may not survive a busy week.

If you ask for a written rule and the roofer says it is not written down, you have learned how the crew runs. You can still hire that roofer, but ask for a daily check, a named person who walks the drop zone each morning, and a verbal notice to visitors at the start of each day. Put those into the bid as lines, so the commitment is on paper and not in anyone's memory.

Keeping your own lot safe

Your part is simple. Keep children and pets indoors or well away from the drop zone while the crew works. Tell the roofer where the front door, the side gate, and the back yard are, and which of those you want kept clear. If you plan to watch from the yard, stand behind a fence line or the house wall, not in the path the crew uses to carry bundles to the eave. Wear your own eye protection if you must step into the work area, such as moving a car or retrieving a package.

Keys Roofing can answer these five questions for your home at (314) 220-2333, and the answers can sit beside the other bids in your folder. Ask each roofer the same questions in the same order, and write the answers down before you pick a date. The roofer whose answers are specific, written, and visitor-aware is the one whose crew is most likely to keep the lot quiet and everyone's eyes intact.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection