
Ask Each Roofer Who Takes the Empty Nail Boxes Home
Nail boxes, bundle wrap and used sealant tubes leave your lot with someone. Ask each roofer who, and write the answer down.
Every roof job leaves a pile of small things behind. Empty nail boxes, torn bundle wrap, coil wrappers, spent staple strips and half-used tubes of sealant end up in the driveway or the side yard. Most of them are cheap enough that nobody thinks about them until the week after the crew leaves. The question that matters is who takes them away, and on a multi-day job in St. Louis that question often gets answered by whichever crew member happens to be standing nearest the dumpster.
Pick one small question to put to each roofer this week. Ask who takes the empty nail boxes, the bundle wrap, the used sealant tubes and the spent cartridges home when the job is done, and whether that answer appears anywhere in the written bid. Then write each answer beside the bid line it belongs to. If one roofer answers in a sentence and another says it depends, you have learned something about how that crew runs its lot.
Roofer comparison
The answers tend to fall into three shapes. In the first, the crew owns the trash. Everything that came off the truck goes back on the truck, and the dumpster holds only tear-off debris. In the second, the homeowner is expected to keep some items, usually leftover shingles and sometimes unused plywood, and the roofer says so up front. In the third, nobody has said anything at all, and the first crew member to finish a box tosses it over the rail. The third shape is the one to watch for, because it is the one that shows up as a yard full of paper and plastic after the final walk.
Compare the answers the same way you would compare the prices. Line them up side by side. A roofer who names the trash route, the day it leaves, and the person who loads it has given you something you can check on the day it happens. A roofer who says the crew will clean up has given you a promise without a sequence. Neither answer is a verdict on the shingles or the install, but the difference tells you how far ahead the crew plans.
Bundle wrap and strapping deserve a separate look. On a windy spring day, loose wrap can travel into a neighbor's yard, catch in a hedge or wrap around a fence post before anyone notices it is gone. Ask whether the wrap is bagged as it comes off the pallet or left loose until the end of the day. A crew that bags as it goes is usually a crew that has thought about the street as well as the roof.
Nail and staple strips are a different problem. A magnet sweep catches most of the loose fasteners in the grass and the gravel, but not all of them, and a single nail in a driveway can puncture a bicycle tire or a child's shoe. Ask each roofer who runs the sweep, how many passes they make, and whether they walk the lawn on foot after the magnet has been run over it. The answer to that last question is often the most revealing one, because it shows whether anyone expects a homeowner to find a nail after the crew has gone home.
Items worth naming in the bid include empty nail boxes and coil wrappers, bundle wrap and strapping, used caulk and sealant tubes, spent staple and nail strips, cut-off drip edge scraps, and any empty bags from the cleanup. Each one can have a different disposal rule. Rules for roofing tar and sealant in particular vary between haulers and between jurisdictions in the region, so a roofer who can tell you where each item goes has probably hauled from more than one job. A roofer who cannot tell you will likely guess on your street.
What it costs
Trash removal usually sits inside the dumpster line, which means it may already be in the price or it may be a separate hauling fee. Ask which one you are looking at. If the bid says dumpster and nothing else, the empty boxes and wrap may go into the same container and stay inside the number you were quoted. If the bid lists a separate hauling line, ask whether that line covers the small items or only the container swap. A roofer who can point to the line has made the comparison easier than one who folds everything under a single haul figure with no explanation.
Cost also shows up in what gets left behind. Leftover shingles have value to some homeowners and none to others, and a roofer who keeps them without asking has taken something the homeowner may have wanted for a shed, a repair or a donation. Sealant tubes thrown into a regular curbside bin can end up somewhere they were never meant to go. None of those is a large dollar figure, but both belong in the written bid, not in a verbal assurance on the driveway.
The number to compare is the total cost of the cleanup, not just the dumpster rental. Add the hauling line, any charge for a second bin, and any charge for returning a sweep crew after the first pass. Also add the time you will spend if the crew does not come back and you have to clear the lawn yourself. That total is what it costs for the roof to leave your property the way it arrived, and it is the figure that should sit next to the shingle price when you compare bids.
Some roofers build the cleanup into the labor rate and never show it as a line. That is not wrong in itself, but it makes the comparison harder. If one bid shows a haul fee and another shows nothing, ask the second roofer to state in writing what the cleanup includes and what it does not. A written answer lets you put the two bids on the same footing.
What to ask
Put these questions to each roofer, in the same words, and write down the answers as they are given:
- Which items does the crew take home, and which go in the dumpster?
- Which day does the trash leave the lot, and who loads it onto the truck?
- Is the bundle wrap and strapping in the dumpster, bagged separately, or taken away by the crew?
- Who runs the magnet sweep over the lawn, the driveway and the gravel, and how many passes do they make?
- Is the cleanup named in the written bid, or only in conversation?
- If the crew leaves a box or a wrapper behind, who comes back for it, and within how many days?
Two things make these answers useful. First, ask the questions before you sign, while the roofer still wants the work and has a reason to be specific. Second, compare the words, not the tone. We clean up and we take it all with us are different promises, even though both sound reassuring on a front porch. The second one names the items and the route. The first one leaves room for a pile by the curb.
If you want a second source, call the office at (314) 220-2333 and ask the same six questions by phone. Then check whether the phone answer matches what the written bid says. A match is a good sign. A mismatch is worth a written follow-up before you choose. A roofer who answers the same question differently on the phone and in the bid has given you the most useful piece of information in the whole comparison, and it cost you one phone call to get it.
Once the answers are in, put them in the same folder as the bids so they stay with the rest of the comparison. When the crew finishes, walk the lawn with the answers in hand and check each item against what was promised. That walk takes about ten minutes and it tells you more about the crew than any review.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.