Ask Each Roofer Who Spots the Trailer When It Backs Into Your Drive
A trailer backing into a St. Louis drive needs a named spotter, so ask each roofer who walks it in and what happens when the lane is blocked.
The roof trailer is the largest thing that will come onto your lot on roof day. It carries the shingle bundles, the tear-off dumpster or the haul-away load, and the ladders and tool boxes the crew needs for the day. Most St. Louis drives were not laid out with a trailer in mind. A side drive in an older part of St. Louis County may have a garage at the end, a fence on one side, and a mailbox at the curb. Backing a trailer into that space takes a person who can see the wheels, the fence line and the street at the same time. The driver usually cannot see all three from the cab, so the question of who guides the trailer in is worth asking before the crew books a date.
This page is about that one question. It is a small question, but roofers answer it in different ways, and the answers tell you how the crew plans its day. A roofer who has a named spotter, a radio and a plan for a blocked lane has thought about your drive. A roofer who says the driver will manage has thought about the truck. Both can be honest, but only one of them gives you a person to hold responsible when the trailer is six feet from your fence.
Why the backing move matters more than the trailer
A roof trailer on a St. Louis lot causes trouble in a few predictable places. The first is the turn at the street. Many residential blocks have parked cars on both sides, and a trailer needs a wide arc to swing into a drive. The second is the drive itself. A concrete drive can be narrow near the garage, and an asphalt drive can soften in July heat and mark or sink under a loaded trailer wheel. The third is the backing move, which is where a person on foot is most likely to get hurt. A child on a bike, a dog off its leash, or a neighbor walking past can be behind the trailer without the driver knowing.
Freeze and thaw changes the picture in late winter. A drive that held a truck in January can sag in February when the ground softens and then refreezes overnight. The spot where the trailer waits and the path it backs along are both affected. If the crew plans to stage on a shoulder or a section of lawn, the spotter also has to watch for soft ground at the edge of the drive. That is not a reason to avoid the job. It is a reason to ask the roofer to name the route before the trailer arrives, and to ask who will check the route on the morning of the work.
Hail season adds its own load. A roof crew may need to move the trailer several times across a day, and each move is another backing move. A bid that describes one trailer placement at the start of the day may not describe the three or four moves the job actually needs. Ask how many times the trailer is expected to move during the work, and who guides each move.
Roofer comparison
Put the same question to each roofer in writing, using the same words. The question is simple: who walks the trailer into your drive, and who stands where while it backs in? Ask for a name or a job title, not a general answer like the crew will be careful. Then ask four follow-up questions. Does that person use a radio or hand signals? Do they stand behind the trailer or beside it? What happens if a neighbor's car blocks the drive? Who calls the stop if a child or a pet comes near the path?
Write each answer next to the roofer's name. If a roofer leaves a line blank, record that as a blank, not as a yes. A blank answer on the spotter question is an answer. It tells you that the roofer has not planned for this step, or that the planning lives with a foreman who has not been asked yet. You can ask for the answer again in writing, and a roofer who replies with a plan in a day has given you a different kind of comparison than one who takes a week.
Compare the answers across the bids side by side. A roofer who names one person, gives a radio check on the morning of the job, and says what happens when the drive is blocked has answered the question in full. A roofer who says the driver is experienced has answered only part of it. A roofer who says the crew will figure it out on the day has told you the spotter will be decided by whoever is nearest the trailer, and that person may change from day to day.
If two bids are otherwise close, this answer can break the tie. Many homeowners compare the price, the shingle line and the warranty wording, and then pick the cheaper bid. The trailer question costs nothing to ask and takes two minutes to answer, but it shows how each roofer handles the most physical part of the job at your address.
What it costs
A spotter is labor, and labor is priced somewhere in the bid or in a line of its own. There is no single number that applies to every roof. Some crews count the spotter as part of the normal crew day, so the cost sits inside the labor line. Others add a line for a second person or for a traffic plan when the street is busy. The honest answer is that a roofer who has a spotter in every job has priced that person somewhere, and you can ask where.
Ask each roofer whether the spotter is in the labor or is a separate line, and ask what the line would be if the drive is blocked and the trailer has to wait or move. Ask whether a second trailer move is priced, and what happens to the schedule if the first move takes longer than planned. These are questions about the bid, and they belong on the same comparison sheet as the shingle line and the start date.
Do not assume the trailer question is free because it sounds small. A blocked drive can push a day back, and a day back can push the rest of the schedule back. If the crew has to wait for a car to move, the bid may show that time as standby. Ask how standby is billed and whether it is capped. A roofer who has thought through the trailer will be able to tell you the cost in plain numbers, and a roofer who has not will tend to say it depends.
What to ask
- Who walks the trailer into the drive, by name or job title, on the day of the work?
- Does that person use a radio, hand signals, or both, and who holds the radio?
- Where does the spotter stand while the trailer backs, and who keeps children and pets out of that path?
- What happens if a neighbor's car, a delivery van or a parked trailer blocks the drive on roof day?
- How many trailer moves does the bid assume, and who guides each one?
- Is the spotter in the labor line, or is there a separate charge for a second person?
- How is standby time billed if the drive is blocked and the crew waits?
- Will the crew check the drive surface on the morning of the work, and what happens if it is soft?
Write the answers beside each roofer's name on one page. Keep the page with the bid. If a roofer changes the answer later, ask for the change in writing with a date.
If you want to talk through the trailer question before you choose, the Keys Roofing office can be reached at (314) 220-2333. Ask the office to put the answer in writing, so that you have it on the same sheet as the rest of your comparison. Ask the same question of every roofer you compare, in the same words, so the answers can be set side by side.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.