
Ask Each Roofer Who Picks Up a Blown Shingle in the Street
A shingle that blows off a St. Louis roof lot lands on a neighbor's lawn or in the street, so ask each roofer who retrieves it and how fast.
Wind is a regular part of a St. Louis roof week. The storms that roll through in spring and early summer can lift a loose wrapper, a half-cut shingle or a scrap off the staging and carry it across the lot. Once that piece reaches the street or a neighbor's yard, it stops being only a roof question and becomes a question about who walks out to get it. Before you pick a roofer, ask each one who retrieves a blown shingle, how quickly that happens, and what happens if the piece is never found.
Why a blown shingle belongs in the comparison
A single shingle weighs very little, but a few of them in wet grass or lodged in a gutter on the street can catch a mower blade, a child's bicycle tire or the underside of a car. The risk also builds over a day. Wind that picks up in the early afternoon can move a stack of cut pieces that nobody weighted down before lunch. A roofer with a clear answer here usually has a clear habit for how materials are staged, and that habit is what you are really comparing.
Missouri does not license roofers, so no state rule tells a crew how to handle debris that crosses a property line onto the neighbor's side. The answer you get from each roofer becomes the rule that applies on your block, which is why it belongs in writing rather than in a phone call.
Roofer comparison
Put the same three questions to every roofer, in the same words, and keep the answers side by side. A good answer names a person, a time and a record. A weak answer uses words like usually, we try, or we will keep an eye out. Those words do not tell you who is responsible on a windy afternoon when you are at work and nobody from the crew is near your curb.
- Who walks the lot and the street at the end of each shift to look for loose pieces, and does that person sign or initial a log?
- If a piece lands on a neighbor's property or a parked car, who knocks on the door, and who pays for any damage the piece causes?
- Does the crew stop work when a gust lifts material off the staging, and who has the authority to make that call?
- Where do cut shingles and wrappers wait overnight, and is that spot weighted, covered or fenced?
Keys Roofing, the contractor behind this site, can answer these in writing before any work starts. Ask any roofer, Keys included, to put the answers into the written scope so they are part of the document you keep. A promise made at the curb during a windy morning is hard to hold someone to later.
What it costs
Picking up a blown piece is rarely its own line on a roof bid. A crew that is already on your lot usually absorbs the few minutes it takes to walk the street into the labor. The cost shows up in other places. If your bid has a separate cleanup or debris line, ask whether the street sweep and the block walk are included in it. Ask whether a second trip to collect a piece found a day or a week later is billed, and at what rate. Ask whether a wind stop that delays the crew moves your finish date and whether that changes the price.
Get the answers as numbers, not descriptions. A roofer who says there is no charge for a walk should be able to say that in the same sentence as the words covering the labor. A roofer who says there may be a small fee should tell you what the fee is before the crew arrives, not after the piece has been found.
What to ask
- How soon after a wind gust is the street walked, and is that the same day or the next morning?
- Who on the crew has the authority to stop work during wind, and is that written into the contract?
- Who is the one person I can call on a job day if something blows loose, and what is that person's direct number?
- Is the street walk logged, and can I see the log before the final check?
- If a piece is found after the crew has left, how do I reach you, and how fast will someone come back?
Write each answer next to the question it answers. If two roofers give you the same answer, that is useful information. If one of them cannot answer in writing, that is also useful information. The point of this comparison is not to find the roofer who never lets a piece blow loose, since nobody can promise that on a St. Louis spring afternoon. The point is to find the roofer who has already decided what happens when one does.
If you want to ask Keys Roofing how it handles a blown shingle before you choose, call the office at (314) 220-2333 and ask for the answer in writing. Keep that written answer in the same folder as the scope and the bid, so that the question is settled before the first bundle comes off the truck.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.