
Ask Each Roofer Who Owns the Gravel Under a Parked Trailer
Stone shifted by a roof trailer or spilled from a bucket needs a named owner before the crew arrives. Here is what to ask each roofer.
A roof trailer parked on a gravel drive or a crushed-stone apron does not leave the stone where it found it. Tires cut into loose rock, the weight pushes it down into the clay, and boot traffic scatters what is left toward the curb. Add the stone that comes off a flat section of roof in a bucket or gets knocked onto a landscape bed, and one roof day can leave a yard that needs raking, topsoil and reseeding. The question is simple: when stone ends up where it should not be, who cleans it up and who pays to replace it. Ask each roofer before the trailer is backed in.
Why gravel shows up on a roof day at all
Most St. Louis lots have some loose stone somewhere. Driveways in older parts of St. Louis County often have a gravel base under the asphalt, or a stone strip at the curb. Many houses have a bed of pea gravel or river rock along the foundation, and that bed sits right where the crew stages ladders and carries bundles up to the eave. Freeze and thaw works stone into the soil every winter, so by roof season the top layer has moved and sits unevenly. A trailer that rolls over that surface can push stone sideways and bury part of a lawn edge.
Flat sections add another source. On a low-slope area with a ballast layer, the crew may pull gravel off the surface before the membrane comes up, and that gravel has to be bucketed, carried and dumped somewhere. A bid that mentions the flat section without saying where its gravel goes has left the largest pile of stone unassigned.
Three places stone goes wrong
- The trailer and truck parking spot, where tires cut or bury loose stone and crush a border strip.
- The landscape bed under the eave or along the walk, where bucket spills and tear-off debris land.
- The curb and street apron, where stone is tracked on boots or tires and washes toward the storm inlet after the first rain.
Each of these can have a different owner in a well-run job. A bid that only says the crew will clean up leaves all three open, and open items are the ones that come back as a surprise on the final walk.
What to ask each roofer
- Where will the trailer park, and what surface is under the tires? Ask for the spot in writing, with the stone size named if the surface is stone.
- Who rakes spilled stone back into the beds and off the drive, and when in the day does that happen? A clean-up at the end of each day is a different promise from a clean-up on the final walk.
- If stone is moved, lost or buried, who replaces it, in what size and color, and whose line item pays for the material and the delivery?
- Will the crew photograph the drive, beds and apron before the first truck unloads, and will those photos carry a date?
- Where do the buckets of stone from the roof go, and is any of it reused on the property?
- Who walks the yard at the final check, and does the closeout paper list any stone replacement by name?
Write each answer down next to the question it answers. If one roofer says the crew will be careful and another names the parking spot, the second answer tells you more about the job.
What a usable answer sounds like
A usable answer names the surface, the person and the time. For example: the trailer parks on the paved apron at the curb, not on the gravel drive. The crew lead rakes the bed along the walk each evening. If a stone is displaced, the scope says it is replaced with matching stone and that the material line is part of the bid. Keys Roofing photographs the drive, beds and apron with dated images before the first load comes off, writes the staging spot into the scope, and walks the yard with the homeowner at the final check. Those are the kinds of commitments to ask about, whichever roofer you choose.
A vague answer is a blank cell in your comparison. Something like the crew will take care of the yard does not say who rakes, how soon, or who pays for replacement stone. Mark it that way, then ask the same question again in writing.
What it costs
Stone is usually priced by the ton, delivered and spread, and the price depends on the stone size and how far it has to travel. Ask each roofer to name the unit, the delivered rate and whether the spreading and compacting are in the same line. Ask whether reseeding, topsoil or sod repair is a separate line, and whether a replacement stone order has a minimum. A roofer who quotes a flat yard repair without a unit is leaving the number open.
Also ask whether the trailer spot is a no-charge item or a priced item. Some bids carry a lot cleanup allowance, and an allowance is a number that has not been spent yet. Ask what happens to any unspent amount at the final check.
What to check on your own before roof day
Walk the yard with a phone before the crew arrives. Photograph the drive, the parking apron, each landscape bed and the curb strip, and note any stone that is already loose. Keep the photos in a folder with dates. Move any patio furniture, planters or hoses out of the path between the drive and the house, since the crew will need a clear route for buckets and bundles. If the yard has an old sprinkler head or a utility box near the drive, mark it so the trailer does not roll over it.
Finally, put the question to every roofer the same way. Ask where the trailer parks, who rakes, who pays for replacement stone and what dated record shows the yard before and after. Whichever roofer answers with a specific surface, a named person and a written line item has done the comparing for you. For a written scope and a walk of your yard, call Keys Roofing at (314) 220-2333.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.