Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Ask Each Roofer Which Paper Wins When the Bid and Contract Disagree

Before you sign, ask each roofer which document controls when the bid, the contract and the materials order say different things.

Two roof bids can look identical on the first page and still disagree in the fine print. One says the drip edge is included, the contract is silent on it, and the shingle order lists a starter strip that the bid never mentions. When a dispute comes up later, the question is not who said what in conversation. It is which written document controls. Before you compare numbers, ask each roofer to say in writing which paper wins when the papers conflict.

Why the order of documents matters

A typical St. Louis roof job passes through several papers before a crew lifts a shingle. There is usually a proposal or estimate, a signed contract, sometimes a change order, a materials order sent to a supplier, and a permit application filed with the city or county. Each one describes the same roof, and each one can be wrong in a different way. A proposal may price 28 squares while the contract says the quantity will be measured on site. A supplier order may list a shingle line the proposal never named. A permit application may show a different number of layers than the crew finds under the old roof once the tear-off starts.

Permit paperwork carries its own record. An application filed with a municipal permit desk in St. Louis County usually states the work type, the contractor name and the roof area. Once that filing is on record, a later change to the roof scope may require a revised permit. Ask who files that revision, how long it takes, and whether the roofer will hold the crew until the revised permit is approved when the scope changes.

No single paper is always correct, so the contract should say how conflicts are resolved. A common approach is an order-of-precedence clause that lists the documents from strongest to weakest, for example the signed contract first, then the written scope, then the proposal, then general terms. The clause does not make the bid accurate. It only tells you which version the roofer must follow when the bid and the contract disagree.

What each roofer should answer

Ask each roofer the same three questions, in the same order, and write down the exact answers.

  • Which document controls if the proposal and the signed contract disagree on a line item, a quantity or a product name?
  • Is the written scope attached to the contract, or is it only referenced by a date?
  • Will you send the final set of documents to me in one packet, with a version date on each page?

The answers tell you more than the words alone. A roofer who says the contract controls, and attaches a scope that matches it, has made a commitment you can check. A roofer who answers that the proposal is "just a guide" has told you the number on the front page may not hold. That is a comparison point, not an accusation, and it deserves a follow-up question in writing.

Roofer comparison

Put the answers into a simple grid. Use one row per roofer and one column per question: the precedence rule, whether the scope is attached, whether the final packet is dated, and how long the roofer took to answer. A written reply that arrives within a day, with the clause quoted, is stronger evidence than a phone call that promises to get the paperwork over soon. The grid will not pick a winner for you, but it will show where one roofer's paper stack is complete and another's depends on memory.

Look closely at the differences that affect the roof itself. If one bid includes ice and water shield along the eaves and valleys, and another bid places it in an allowance, the contract needs to say which version governs the final price. In St. Louis, where ice damming at the eave is a common winter problem, a missing membrane line is not a small clerical gap.

Keys Roofing documents damage and puts a written scope with photos and measurements in the homeowner's hands. Ask every other roofer for the same thing, then hold each packet against the others line by line.

What it costs

Document conflicts cost money in predictable places. The most common is quantity. A bid priced by the square can grow when the measured area, the waste factor and the permit drawing disagree. Ask each roofer whether the price is fixed, unit-based or time and materials, and whether the contract states the quantity or only the method for measuring it. A fixed price that depends on a measurement nobody has written down is still open to change.

Another cost sits in product names. If the bid names one shingle line and the order sheet names another, the difference can show up as a restocking charge, a delay, or a substitute that needs your approval before it goes on the roof. Ask for the product name, the color and any lot requirement in the same document that carries the price. Then ask how a substitution is priced if the named product is unavailable on the scheduled date.

Finally, ask whether any amount on the bid can change without a signed change order. Text messages, emails and verbal agreements can feel binding in the moment. A contract that says only signed written change orders bind both sides is easier to follow later than a memory of a phone call, and it gives both of you the same record to point to.

What to ask

Use these questions before you sign anything. Ask them in writing, because a written reply is a document you can compare against the others.

  1. When the proposal, the contract and the materials order disagree, which one controls, and where is that rule written?
  2. Can you attach the final scope to the contract and date every page?
  3. Which permit application will show the roof area and the number of layers, and will it match your proposal?
  4. If the scope changes after the permit is filed, who revises the permit, and who pays for any delay?
  5. What is the procedure for resolving a disputed line before the crew starts work?

If a roofer will not answer in writing, note the gap and weigh it accordingly. Choosing a roofer is a decision about who will stand behind a number after the trucks leave. Their paperwork is one of the earliest signs of how they will answer later, so read it as carefully as the price.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection