Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Ask Each Roofer Which Eave Vent Screens Go Back On, and Who Sets Them

Eave vent screens and bird blocks come off on roof day. Here is what to compare in each roofer's bid before you pick one.

Most roof bids say little about the vents at the eave. Soffit vents, the screens over them, and the bird blocks tucked up under the first course of shingles all come off on roof day, and they go back on last, if they go back on at all. In St. Louis that small piece of work matters more than it looks. Wasps and starlings nest in open soffit, squirrels chew through vinyl and wood, and a missing screen lets wind-driven snow into the attic during a February thaw. Before you pick a roofer, you want each bid to name what comes off at the eave, what goes back on, and who is responsible for the parts in between.

Why the eave vents matter after a tear-off

An attic needs air moving from the eave to the ridge. Soffit vents bring in cooler air, and a ridge vent or gable louvers let the warm, moist air out. When a crew lifts the first course and the drip edge, the soffit panels or vent strips underneath can be disturbed. A screen that gets pried loose and dropped into the gutter will not turn up later unless someone counted it. Bird blocks, the foam or wire-mesh strips that keep insects and birds out of the gap between the rafters, are even easier to lose because they sit out of sight once the new shingles are on.

In a freeze-thaw climate like ours, the eave is where ice damming starts. Snow melts on the warm part of the roof, runs down to the cold overhang, and refreezes. Ventilation that is blocked or incomplete leaves the attic warmer than it should be, which feeds that cycle. A bid that treats the eave as trim, instead of part of the ventilation system, can leave you with a roof that looks new and still lets winter into the attic.

Roofer comparison

Read each bid for three things at the eave. First, is there a line that says the soffit vents, screens and bird blocks are removed and reinstalled, or is the work simply described as "install roof"? Second, does the bid name who reinstalls the vent pieces, the roofing crew or a separate trim or soffit contractor? Third, does it say what happens if a screen is bent or cracked when it comes down? Replacement screens cost little, but a bid that does not name them tends to leave them out of the closeout.

Ask each roofer to walk the eave with you before the crew starts. A simple question works: point at the soffit and ask, "Which of these come off, and which of these go back?" The answers should match the bid. If one roofer says the screens stay in place and the other says they come off, the two bids are not for the same roof, and the difference is not in the shingles. Write down each answer with the date, and keep it with your copy of the proposal.

Pay attention to how each roofer counts the vents. Some bids count the ridge vent by the foot and the soffit vents by the piece, and some count only the ridge. A bid that does not state how many soffit openings it sees on your house has not measured them. The count should appear on the proposal as a plain line, so you can compare it with the count on the other bid.

What it costs

Eave vent work is usually small on the invoice, which is why it gets dropped. Replacement screens, vent strips and bird blocks are inexpensive parts. The labor to remove and reinstall the soffit pieces is where the number moves. A roofer who has to pull back a section of soffit to reach the rafter tails will charge more time than one whose eave is open and simple.

Ask whether the vent parts are priced as a single allowance, by the linear foot, or by the piece. An allowance line can be fine if it names a dollar figure and says what it covers. An allowance that says "as needed" is not a price. If a screen is damaged on roof day and the bid does not say who replaces it, you may get a separate invoice for a part you thought was included.

Compare the eave line across bids the same way you compare shingles or underlayment. Put the vent items on one sheet with a column for each roofer, and mark which ones are in the price and which are listed as extras. You are not looking for the lowest number here. You are looking for the bid that names every piece, so that a difference in totals means the same thing on both sides.

What to ask

  1. Which soffit vents, screens and bird blocks come off on roof day, and which stay in place?
  2. Who reinstalls them, and is that crew named in the bid?
  3. How many soffit openings did you count on my house, and how many are in the price?
  4. If a screen breaks during removal, is a replacement included, and at what price?
  5. Does the bid include a check that the attic is still ventilating after the new roof is on?
  6. Who walks the eave with me at closeout before the final payment?

Put each answer in writing. A text message is better than nothing, but a line on the proposal is better still. If a roofer will not write down what happens to the vent screens, that refusal tells you how the closeout is likely to go.

Where the St. Louis details come in

St. Louis County and the city both issue roofing permits, and the inspection record can show whether the work was done as described in the permit submission. You can ask the permit desk for the inspection history on your address, and you can ask your roofer whether the final inspection will look at the eave. Not every desk checks soffit vents on every job, so do not assume an inspector will catch a missing screen. The bid should say the eave is part of the job, whether or not anyone comes back to look at it.

Missouri has no state roofing license that would tell you whether a roofer handles eave ventilation well, so the comparison falls to the paper in front of you. Ask for a written scope, photos of the eave before and after, and the measurements behind the counts. Keys documents damage, puts a written scope with photos and measurements in the homeowner's hands, and attends as the contractor while the homeowner deals with their own insurer. Ask every roofer you consider to produce that same record.

If you have questions about what your bid says at the eave, call the office at (314) 220-2333 and ask for the written scope before you decide. Get the vent line in writing, count the openings yourself with a ladder or a second person, and keep the closeout photos.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection