Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Ask Each Roofer Whether Your Piano Is in the Roof Scope

A piano sits in the drop zone or near the tear-off, and each roofer's bid should say who moves it, who protects it and who pays if it is damaged.

A piano does not get out of the way on its own. It stays in its room while bundles come off the truck, a nailer fires through the deck for hours, and a tear-off sends vibration through the framing and dust through every gap. Many homeowners forget the piano until the room is full of grit. The roof bid is where that gets settled, and the bids in your stack will not all settle it the same way.

This page compares the roofers on one question: what happens to your piano between the first nail and the final walk. It does not rank anyone, and it does not tell you which roof to buy. It gives you the questions to put to each roofer so the answers sit side by side on paper.

Roofer comparison

Start by placing the piano on paper. Note the room, the wall it sits against, and whether that wall faces a roof slope the crew will strip. An upright on a second-floor interior wall may sit directly under the work. A grand in a front room under a single-story porch roof may be well clear of the tear-off, yet still sit on the path the crew uses for staging. Sketch the room with the piano marked and attach the sketch to every bid request so each roofer answers about the same spot.

Next, compare what each bid actually promises. Three versions show up often:

  • The bid says interior protection with no mention of the piano. That is a general phrase, and it leaves the piano to the crew's judgment.
  • The bid names the piano and promises to cover it in place. Ask what covering means, which material is used, and who lifts it off after the job.
  • The bid lists the piano as excluded and recommends a piano mover. That is an honest answer, but the move then becomes a separate hire you arrange.

Ask each roofer the same five questions and write the answers beside each other:

  • Is moving the piano out of the room in the price, or only covering it?
  • Which material covers it, and who puts the cover on and takes it off?
  • Will the crew open a window in that room during the tear-off, and at what hour?
  • Will any crew member touch the piano, its lid or its bench?
  • If the piano drifts out of tune after the job, who arranges the technician visit?

A roofer who answers all five in plain sentences has thought about the room. A roofer who answers with the word protect and nothing else has not. That difference is what the comparison is for, and it is easier to see when the answers are written down than when they are said across a kitchen table.

What it costs

A piano move is its own trade, and it is priced like one. Piano movers price by the instrument, the distance it travels, the number of stairs, and whether it has to leave through a door or a window. An upright often weighs several hundred pounds. A grand can weigh well over half a ton. A roofing bid is not built to carry that work, so a roofer who says the piano is included should put the line in the written scope, with its own price or with wording that shows the move is covered.

Check whether each bid has a separate line for the piano, a line for the cover, or no line at all. A cover costs less than a move, but it is not the same protection. A covered piano sitting in dust for several days can still pick up dust in its action and keys unless the room is sealed. The bids that take this seriously describe the seal, not just the sheet.

Tuning is the other cost. Tuning drifts with changes in humidity and temperature, and a room that is open to the weather for part of a day may swing more than a closed room does. Repair and tuning are usually outside what a roofing contract covers. Ask each roofer to say in writing whether a tuning visit after the job is included, and whether the roofer will pay for one if the piano moves out of tune because of something the crew did. A plain no in writing is still an answer you can compare.

Take photographs of the piano and the room before the crew arrives. Date-stamp them, include the lid, the keys and the top of the cabinet, and keep the files with your copy of the scope. If something goes wrong, the photos are the start of the record, and they cost nothing.

What to ask

Put these in writing before you choose, and use the answers to compare the bids on equal terms:

  1. Mark the piano on a floor plan and ask each roofer to confirm the mark before the crew is scheduled.
  2. Ask whether the crew moves the piano, covers it in place or leaves it uncovered, and where that answer appears in the bid.
  3. Ask what cover is used, how the room is sealed from tear-off dust, and who removes the cover after the final walk.
  4. Ask whether the room is on the crew's staging or travel route, and whether the crew will keep the door to that room closed.
  5. Ask who answers if a crew member bumps the instrument, leaves the lid open or sets something on it.
  6. Ask whether a tuning visit is included, and who arranges it if the piano needs one after the job.

Keys Roofing, the contractor behind this site, should answer these questions in writing like any other bidder. If you want the answer on the piano before you decide, call the office at (314) 220-2333 and ask for the line in the scope. Ask for it in the written bid as well, because a phone answer that never reaches the paper does not bind the crew on the day.

When two bids are otherwise close, the piano can be the tiebreaker. The roofer who draws the room, names the move or the cover, and writes the tuning answer has shown you how the day will run. The roofer who says the room will be protected has given you a phrase, and a phrase is harder to hold them to once the crew is on the roof.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection