
Ask Each Roofer Whether You May Walk the New Roof, and Who Says When
Roofers answer the walk-on question differently, so compare the rule, the timing and who decides before the crew leaves your lot.
Once the last nail is in and the crew has rolled up its cords, most homeowners want to see the new roof for themselves. Some roofers say you may go up whenever you like. Others name a set number of days before anyone climbs. A few say nothing until you ask. The answer decides whether you can check the ridge in morning light, whether a child can climb a ladder near the eave, and whether the dog can run the yard after the shingles are down. Ask each roofer the same question before you sign, and write the reply beside the bid.
Why the walk-on question belongs on the comparison sheet
A new asphalt shingle roof depends on sealant strips that bond with heat. In St. Louis, a cool October afternoon can leave those strips unsealed for longer than the roofer expected. A homeowner who climbs up on the second morning can lift a tab or crease an edge that has not set yet. The roofer who wrote the install sheet knows the sealing window. The bid itself often leaves it out. That gap is why the question matters: the reply shows how the roofer thinks about the first days after the nails go in, and it shows whether that thinking was written down anywhere you can read.
The question also reaches past the roof surface. Walking a roof means crossing the ridge, the valleys and the flashing at the chimney, and each of those spots can be damaged by a careless step. A roofer who has thought about the walk will know which areas stay covered, which need a board laid across them, and which can be seen safely from the ground. A roofer who has not thought about it will tend to give a short answer and move on.
The four parts of a useful answer
Each reply contains four parts, and a clear comparison sheet has a column for each one.
- Whether you may walk it at all. Some roofers say yes with no conditions. Others say no for any roof surface, which means you would look only from the lawn and the drive.
- How long the roof stays closed. Ask for a number of hours or days, counted from a named event such as the last nail or the final sealing check. An answer like soon or after a while is not a number, and it cannot be checked later.
- Who decides that the roof is open. Get a job title, and ask whether that person is on the crew, in the office or somewhere else.
- What happens if you go up early. The answer should say who is responsible for a damaged shingle, whether the crew would repair it, and what the bid says about a replacement rate.
Roofer comparison in practice
Put the four parts into a table with one row per roofer. Keep the wording each roofer used. A roofer who says after the sealing check and another who says when the foreman signs off may be describing the same step, or two different steps. Write down which one each roofer means, and then ask the follow-up: what does the check consist of, and who performs it? The follow-up often reveals the difference that the first answer hid.
Watch for an answer that changes when you ask it twice. Put the question on the phone, then send it again in writing a day later. A roofer who says the roof opens after two days in the first reply and after five in the second has not settled the rule inside the company. That inconsistency is worth more to your comparison than a small difference in price, because it predicts how the schedule will move once the crew is on your lot.
A roofer who says you may walk the roof but must stay off the valleys, the ridge caps and any section still covered by a tarp is giving you useful detail. Ask for that list in writing, with the sections named by slope and by the feature they sit beside. A verbal warning to stay off the valleys is easy to forget by the second weekend, and a written list gives you something to hand to a visiting relative or a dog sitter.
Compare the answers against your own plans. If you plan to show the new roof to an inspector, a lender or an appraiser, the timing of your access matters. If a teenager in the house wants to climb onto the garage roof for a photo, the rule needs to name that roof too. A roofer's answer that fits your household is worth more than a general answer that fits a typical house.
Looking at the roof is not the same as walking it
Many homeowners assume the choice is between walking the roof and doing nothing. The better comparison has three levels. The first is the ground view from the lawn or the driveway, which needs no permission. The second is the ladder view, where you stand at the eave on a stable ladder and look along the lower courses. The third is the walk itself, which means stepping on the shingles. Ask each roofer which of the three is open to you and when each one opens.
The ladder view is where many homeowners learn the most. From the eave you can check the drip edge, the starter course, the gutter line and the vent hoods. You can see whether the shingle exposure looks even across the slope. A roofer who allows the ladder view on day one and holds the full walk until the final check is giving you a practical schedule. A roofer who blocks the ladder view entirely should explain the reason, and the reason should be a specific one.
What it costs
A walk-on rule does not add a separate line to most roof bids, and no roofer should charge you to learn when the roof is open. The cost of the rule shows up in other places. If you ask for a second walk after the crew has left, find out whether that visit is in the price or billed as an extra trip. Ask for the trip charge in writing before you agree to it, because a visit that sounds small in conversation can carry a fee that the bid never mentioned.
If a shingle is damaged by a homeowner who went up before the roof was open, ask who pays to replace it. Some roofers answer that the crew would make the repair at the homeowner's cost, and the figure may come from a rate sheet that you can request. Other roofers say the warranty would not cover the damage, which is a different answer with a different cost. Ask for the figure, the shingle line it applies to and the labor rate behind it, and write them on the comparison sheet with the date you asked.
Ask also whether your walk is part of the closeout. Some roofers schedule a final walk with the homeowner before the completion form is signed. If your walk is the step that releases the final check, the date for that visit controls when the job closes, and the date belongs in the schedule you sign. A walk that is never scheduled tends to become a walk that is never done, and the homeowner is left with a roof no one has examined together.
Weather can move every date in the answer. A hard freeze after the install can delay the sealing check, and a warm spell can shorten it. Ask each roofer what they do when the forecast changes the window, and whether a delay in the walk-on date changes the price. The answer should be written into the schedule, not left to a phone call on a cold morning.
What to ask
Put these questions to each roofer, in this order, and write each answer on the same sheet:
- How many hours or days after the last nail may I walk the roof, and what event starts the count?
- Which sections stay off-limits, and for how long?
- Who tells me the roof is open, and how will I hear it: text, email or a call?
- If I go up before that date and something is damaged, who pays, and what does the bid say about it?
- Will you walk the finished roof with me before the completion form is signed?
- Can I see the install sheet that sets the sealing or walk-on rule for these shingles?
The office number for Keys Roofing is (314) 220-2333. Ask the same six questions on that line, and keep the written replies in the same folder as the bid. If a roofer will not give a number of days, write down that the answer was no number, along with the date and the name of the person you spoke to. That note is a comparison result in its own right.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.