Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Ask Each Roofer Whether a Retired Foreman Is on Your Job

A retired foreman's name on a bid is a staffing claim, so ask who runs the crew on your roof and get the answer in writing.

When a roofing bid names a person beside the words "foreman" or "lead installer," that name is a statement about who will be on your roof. Some companies bring back a retired foreman for a few days, or keep one on the books as an adviser, and that experience can help on a hard tear-off. It can also leave you with a name on the paper and a different crew on the ladder. Before you compare two roofers on price, find out whether a retired foreman is part of your job, what that person does, and how many hours of the job they will spend on your property.

Roofer comparison

Roofers tend to use the word "foreman" loosely. Some mean the person who runs the crew on the day, some mean an office manager who once ran crews, and some mean a retired roofer who is paid to review estimates. Each of those is a different job, and each leaves a different gap in your comparison. Ask every roofer to name the role in one sentence, and then ask whether that person will step onto your roof at all.

St. Louis makes this question sharper than it looks. A spring tear-off can wait for a dry deck, and a crew that is short a lead person may be tempted to push the schedule or keep working on wet wood. A summer job runs into heat, and someone has to decide when the crew stops. A winter job raises the ice and snow questions that a senior person usually handles. The answer you want is not the name of a retired expert. It is the name of the person who makes the call on your roof on the day it matters.

Missouri does not license roofers at the state level, so no state registry will tell you who holds what role on a crew. The bid and the written answers you collect are the only record you will have, which is why the comparison has to live on paper. Set each roofer's answers side by side. A roofer who gives you a clear role, a named person on site, and a stated number of hours is easier to hold to the job than one who says the experienced people "stay involved."

Watch for three patterns. The first is a name that appears only on the cover letter. The second is a retired foreman described as "available" with no hours attached. The third is an answer that changes between the estimate visit and the contract. If you have to ask twice, write down both answers and the dates you heard them. Keep that habit whenever two roofers give you two answers to one fact.

What it costs

A retired foreman's time has a cost, and it shows up somewhere in the bid. Some companies list it as a separate line, such as a consulting or supervision charge. Others spread it across labor or overhead, and you will not see it at all. Neither approach is wrong by itself, but a comparison that ignores the difference will not be fair. Two bids with the same total can carry very different amounts of supervision, and the cheaper one may be the one with no senior person on your roof.

Ask each roofer which of three things applies. If the retired foreman is billed separately, ask for the hourly rate and the estimated hours in writing. If the time is built into labor, ask how many labor hours the bid assumes and who is counted in them. If the person is not billed at all, ask why, and ask whether that changes when the job slips into a second week.

Cost also moves when the crew changes mid-job. If a lead installer is replaced after you sign, a change order may follow, and that change order may include a charge for the new person's time on the walk. Ask whether substitutions are priced, how they are approved, and whether you receive a copy before the work starts. A substitution that quietly adds a charge is harder to catch than a price change you can see on the page.

Keep your own record. A simple sheet with each roofer's answer on role, hours and billing lets you compare like with like. It also gives you something to point to if the job runs long. Check the shingle line on each bid as well. Keys installs Atlas and Malarkey shingles, and a bid that names a different product should be discussed before any order goes out.

What to ask

Put these questions to every roofer in the same order, and write down each answer word for word.

  1. Is a retired foreman named on this bid, and if so, what is that person's role on the job?
  2. Will that person step onto my roof, and on which days?
  3. Who is the lead installer on site each day, and who do I call if that person is absent?
  4. How many hours of supervision does the bid assume, and is that time billed separately?
  5. If the lead installer changes after I sign, how will you notify me, and is the new person's time priced?
  6. Who decides when to stop work in rain, heat or ice, and does that person hold the foreman role?
  7. Who signs the completion form, and can I have that person's name and phone number before the crew arrives?

Compare the answers, not the confidence with which they are given. A roofer who names one person, one role and one set of hours has given you something you can check on the first day. A roofer who answers with a list of experienced people and no schedule has given you a comparison you cannot measure. If the answers stay vague, call back and ask the question again in writing. Keys can be reached at (314) 220-2333 if you want to put these questions to the office directly.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection