Ask Each Roofer Where the Crew Uses the Bathroom and Gets Water
Restroom, water and shade are missing from most roof bids. Here is what to compare, and what to ask each roofer before you sign.
A roof crew spends most of a working day outdoors, on a surface that St. Louis weather does not make easy. In July a south-facing slope can run hot enough that a crew needs a shaded break by mid-afternoon. In February a wet morning turns into a long afternoon of cold hands and frozen hose bibs. Yet most roof bids say nothing about where the crew will drink water, sit down, or use a toilet. That silence is worth closing before you sign, because each answer changes what your yard, your driveway and your house see over the next several days.
Why this line is usually missing
Roof bids are built around shingles, underlayment, flashing, nails and tear-off. Restroom and water access feel like crew logistics rather than roofing, so they rarely get a line of their own. That leaves you guessing. Some roofers bring a portable toilet and park it on the driveway or the curb strip. Some expect the crew to walk to a gas station a few blocks away. Some assume the homeowner will open the back door to a bathroom, which is a request you should be able to answer yes or no to on purpose. None of those options is wrong by itself. The problem is finding out which one applies on the morning the crew pulls in.
The gap grows on a larger job. A tear-off that runs two or three days puts the same crew on your lot for every break, every lunch and every afternoon rain delay. A rain delay in particular can leave a portable toilet standing with nobody scheduled to service it, and a crew that has been sent home may still have left its water cooler in the sun. Ask how the plan handles the days when nobody is working, not only the days when everyone is.
What each written bid should say
Compare the bids on four plain points. First, where the toilet, if one is provided, will sit, and whether it sits on your driveway, on the grass or on the street. Second, whether the crew may use an indoor bathroom, and which one. Third, who supplies drinking water, and whether it is a cooler on site or a trip to a store. Fourth, where the shade or break area is, if the job runs through a hot afternoon. A bid that answers all four in writing is far easier to hold a crew to than one that answers none of them.
Look for the answer in the proposal or the written scope, not in a phone call. If the sales conversation promised a clean portable toilet beside the side gate but the written scope is silent, the spoken promise will not show up on the day. The same rule applies to the bathroom inside your house. If you agreed to let the crew in, the scope should say so and name the room.
Questions to put to each roofer
Send the same short list to every roofer you are comparing, and note how long each one takes to answer in writing. The list is short on purpose, so that the answers can be read side by side.
- Where will a portable toilet, if you provide one, be placed, and on what surface?
- Does the crew use the homeowner's indoor bathroom, and if so, which one?
- Who supplies drinking water, and how much will be on site on a hot day?
- Is there a shaded spot for breaks, and where is it on your lot?
- What happens to the toilet and the water supply on a day when the roof is open and rain keeps the crew off?
- Will the crew move any of this if it blocks a driveway, a gate or a fire lane?
Heat, cold and the water jug
In St. Louis summers the roof surface can run well above the air temperature, and the sun works on the crew from early morning until the last shingle is down. Water matters most in the first hot week of June and the last hot week of August. A crew that has to walk off the property for drinking water will take shorter breaks, or none, and a rushed crew is more likely to leave nails and fasteners in the flower bed. Ask whether water is staged on the lot before the tear-off starts, not after the first heat complaint.
Cold days raise a different question. A portable toilet with a frozen holding tank, or a hose bib that splits because nobody drained it, becomes a daily problem on a late-winter job. If your roof work may run into cold weather, ask whether the outdoor water supply will be shut off and drained at night, and where the crew will go when the outdoor option is closed. Frost and ice make the driveway a hazard as well, so the toilet location should not require a walk across ice to reach it.
Your yard, sprinklers and driveway
A portable toilet is heavy when it is serviced, and the pump truck needs room to reach it. Ask where the service vehicle will park, and whether it will drive over the lawn or near the sprinkler lines. Before the unit goes down, have the sprinkler heads and any buried irrigation flagged, because a trailer wheel or a pump truck can crush a head you cannot see. That check belongs in the same conversation as the water question, since both sit on the same patch of ground.
Shade and water also change how the yard looks at the end of the day. Empty cups, cooler lids and a dropped glove in the shrubs are small, but they are the kind of detail a written scope should cover with a cleanup line. If a roofer's bid says the crew will remove all of its own trash and leave the lot as it found it, that is a sentence you can check at sunset.
What to do with the answers
Once each roofer has replied, put the answers side by side on one sheet. Mark any roofer who did not answer a line, and mark any roofer whose answer was only that the crew will handle it. Those answers are not necessarily wrong, but they leave the decision with the crew on the morning they arrive. A roofer who names the spot, the water source and the break area has committed to something you can check from the driveway.
If you cannot get a written answer before you sign, ask for it as a line item and request a signed revision. A line that says the crew will use the homeowner bathroom on the first floor, and that the portable toilet sits on the concrete pad by the side gate, costs nothing to write and saves an argument later. The Keys Roofing office can be reached at (314) 220-2333 if you want to put these questions to them directly before you choose a roofer.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.