The document

Ask Each Roofer What Ready to Start Means in Writing

Before you pick a date, each roofer should say in writing what they need from you, what they have staged, and what they still have to clear.

A roofer will often say the job is ready to start, and the phrase means different things from one company to the next. For one roofer it can mean the permit is pulled, the shingles are on a truck, and the crew is on the calendar. For another it can mean only that the crew has a slot open. A St. Louis homeowner who books a start date on the strength of that phrase may find out on the morning of the job that the shingles are still at a supplier counter and the permit card is still in a folder back at the office. Before you compare prices, ask each roofer to define the phrase in writing.

Why the phrase matters in St. Louis

Roof work here is scheduled around weather that does not cooperate. Spring rain can leave a deck too wet to nail. A freeze-thaw cycle in January can make a shingle hard to seal. Summer heat can soften the asphalt enough that a crew needs to slow down. A start date given without conditions is a guess about all of those things at once. A written definition of ready turns the guess into a list you can check on the day before the crew arrives.

The permit side adds its own clock. Depending on the municipality in St. Louis County, a roof permit may be issued through a city desk with its own hours, its own inspection schedule, and its own rules about who pulls the card. Some desks want the permit posted at the house before work starts. Others want a plan review before anything is ordered. The roofer who says the job is ready should be able to name which desk they are working with and whether that desk has signed off.

What a written definition should cover

Ask each roofer to list the conditions that have to be true before the crew rolls. A short, specific list is easier to compare than a long one full of soft language. Useful items include the following.

  • The permit status, including whether the permit has been issued, its number, and which municipal desk issued it.
  • The shingle order, including the supplier, the date it was placed, and whether the material has been confirmed for delivery.
  • The staging area, meaning where the pallets will sit and whether the crew has an approved place to unload.
  • Your own prep items, such as clearing the drive, moving vehicles, and securing pets, and whether the roofer will confirm them the day before.
  • The crew assignment, including the lead installer's name and whether that person is already committed to another job that might run long.

Each item gives you something to ask about. If a roofer says the shingles are ordered but cannot tell you the supplier, that is a gap. If a roofer says the permit is pending, ask what the pending step is and when it is expected to clear. A pending permit is not the same as an issued one, and a roof date that depends on it should say so.

Roofer comparison: reading the answers side by side

Put each roofer's definition in the same place. A simple sheet with the five items above as rows and each roofer as a column will show you quickly where the answers differ. Blank cells matter. A roofer who leaves the staging line empty has not decided where the pallets will sit, and you should write that down as an open question rather than assume the crew will find a place.

Pay attention to the words each roofer uses for timing. Some will say the crew starts at seven in the morning, others will say the crew arrives in the morning, and others will give a range of days. Those are different commitments. A start time is a promise you can hold a company to. A range is a window. If you are comparing two bids, make sure both use the same kind of promise, or the comparison is between an exact time and a guess.

Ask about the other side of readiness too. What happens if the crew arrives and one item is not ready? Some roofers will move the crew to another job for the day and bill a standby charge. Others will wait on site and bill by the hour. A third group will reschedule without a charge but push the start date by a week or more. Each approach changes what your delay costs, so write each answer next to the item it covers.

What it costs when ready is not ready

A missed start is not free even when no one charges you for it. You may have arranged time off, moved a car, or rearranged a family schedule. If the shingles are not on site when the crew expects them, the delay can push the job into a weather window that is less forgiving. A roof left open for an extra week in a St. Louis spring or fall carries more risk than a roof finished on the planned date.

Ask each roofer whether a standby day is billed to you, and if so at what rate. Ask whether the standby rate appears in the contract or only on a separate sheet. A standby line that appears only in a conversation is hard to enforce later. Ask also whether a day lost to a material delay counts against the total working days in the schedule, because some contracts count calendar days and others count working days, and the difference can be several days on a large roof.

Keys Roofing can be reached at (314) 220-2333 if you want to ask these questions by phone before you choose. Whatever a roofer tells you on the phone, ask them to put the definition in writing, with the date, and keep it with the rest of your bid paperwork.

What to ask

Use these questions with every roofer on your list, in the same order, so the answers are comparable.

  1. When you say the job is ready to start, what has to be true on the day before the crew arrives?
  2. Has the permit been issued, and which municipal desk issued it? What is the permit number?
  3. Which supplier will deliver the shingles, and what is the confirmed delivery date? Which shingle line is on the order?
  4. Where will the pallets sit on my property, and who confirms that spot with me before the truck arrives?
  5. Who is the lead installer for my roof, and is that person committed to this job on the start date?
  6. If the crew arrives and one item is not ready, what do you do, and what does that cost me?
  7. Is a standby day billed, at what rate, and where does that rate appear in the signed contract?
  8. Will you confirm each item in writing the day before the start, and who will send that confirmation?

Write each answer in the roofer's own words. Then compare the wording across your list. The roofer whose definition of ready is specific, dated, and attached to a named person is giving you more to hold them to than the roofer who answers with a general assurance. That difference is what this comparison is for.

Keep the definition with the contract

After you have the answers, ask each roofer to attach the definition of ready to the signed contract or to a dated letter that refers to it. A definition kept only in an email thread can be hard to find when a start date slips. A definition attached to the paperwork gives you a page to point to if the crew arrives early without the permit card, or if the shingles are still on a truck that has not left the yard.

Missouri has no roofing license for a contractor to show you, so the paperwork your roofer gives you is the record that matters for the start date. Ask for it before the deposit clears, and read it once more on the day before the crew arrives.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection