Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Ask Each Roofer What Happens When the Drive Is Ice-Glazed on Arrival Day

An ice-glazed drive can stop the crew before the first ladder goes up, so ask each roofer who sands the approach and what a delay costs.

A St. Louis morning after freezing rain can leave the driveway, the apron and the first ten feet of the walk glazed with a layer you cannot see from the sidewalk. A roof crew that pulls in with a flatbed, a trailer and a pallet of shingles has to decide, before anyone climbs, whether that surface is safe to stand on, to back a trailer across, or to unload a bundle onto. Each roofer answers that question differently, and the answer tells you more about the day than the start time on the bid does.

This page is for the homeowner who has two or three written proposals in hand and needs one specific fact before choosing: what each company does when the lot is not ready on the day the crew arrives. Ask every roofer the same question, in the same words, and write the answers in a column next to each other.

Why ice on the drive changes the start

St. Louis winters cycle through freeze and thaw often enough that a driveway can look wet at seven in the morning and be glazed by seven-thirty. Meltwater runs into the low spots near the garage door and freezes overnight. The concrete apron at the street and the first slab at the back of the drive tend to hold that film longest, because they get the least sun and the most runoff. A driveway that looks fine from the kitchen window can still turn into a sheet of ice by the time a loaded trailer rolls in.

On a glazed surface, a loaded shingle hand truck slides. A trailer with a heavy tongue can jackknife at the apron. A ladder set on a frozen edge of gravel or soft lawn can kick out at the feet. Those are the reasons a careful crew waits, sands, or moves its staging to a safer surface. The question for you is whether your bid says any of that.

Roofer comparison: three answers to look for

Most answers fall into three groups. Two of them are workable. One is a warning sign.

  • The crew checks the approach before unloading, marks the safe path with a visible line of sand or salt, and calls you before any delay.
  • The crew moves the start to a later window, names the time they will call back, and says whether the change also moves the shingle delivery.
  • The crew says the drive is the homeowner's job to clear, with no sand, no salt, and no plan for the trailer.

The first two are different kinds of good. A roofer who sands the approach and starts on time is planning the day around the ground. A roofer who postpones and says so in advance is planning around the ice and telling you what changes. The third answer leaves you to find the problem on the morning of the job, with a truck already idling in your yard.

When an answer is vague, write down the vague words exactly. "We will see how the drive looks" is not a plan. "We will make it work" does not say who sands, who pays for the sand, or whether the lost hours get billed. Keep the wording so you can read it back to the same roofer later.

What it costs when the crew waits

A delayed start is not free just because nobody climbed the roof. Crews carry a daily cost for the trailer, the labor on the clock, and the equipment rental. Some bids include a standby or weather-day line. Others leave the wait out and bill it later as a change order. Ask each roofer which approach applies before you book, and whether a wait counts against the completion date in the written schedule.

Sand and salt are small costs, but they are real. Some roofers include a bag or two in the mobilization line. Others treat it as a homeowner expense or a line that appears only on the final bill. Neither is wrong by itself. What matters is that you can see the number before the morning arrives.

The delivery truck is a separate question. If the shingle truck cannot reach the drive, the pallet may wait at the curb, on the shoulder, or somewhere else on the lot. Ask each roofer where the pallet will sit and whether a second delivery fee applies if the truck has to come back on another day.

What to ask

Put these questions to each roofer in writing, and ask for the answer in writing too. Phone answers help with comparison, but the page you keep should show what each company committed to.

  1. What is your rule for an ice-glazed drive or apron on arrival morning?
  2. Who sands or salts the approach, and is that material in my bid or billed later?
  3. If the crew waits, when will you call me, and what is the new start window?
  4. Does a delay move the shingle delivery, and is a second delivery charged?
  5. Is a standby day counted in the schedule, or added to the total as a change order?
  6. Where does the pallet wait if the truck cannot reach the drive?

Compare the answers the way you would compare two unit prices. Look for the company that names a step, a person and a cost. A company that names none of those is telling you the day will be decided on your driveway, not in the office.

A short walk before you choose

If a St. Louis winter is coming, walk the drive and the apron with a flashlight on a cold night. Look for the places that stay shaded, the low spot by the garage, and the strip where the street slope meets the concrete. Mark them with a stake or a strip of tape. Bring that map to each roofer and ask them to point to the same spots. A roofer who is planning the day will walk the lot with you and say where the trailer should stop. A roofer who skips the walk has not priced the approach.

Best Roofers STL, the site this page belongs to, takes calls for Keys Roofing at (314) 220-2333. Ask the question above, then set the answer beside the others you collected.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection