
Ask Each Roofer What Happens If a Crew Member Shows Up Impaired
Ask each roofer what their crew does on your lot when someone arrives impaired, and get the answer in writing before you pick one.
Most of a roof bid is about shingles, nails and flashing. The question that matters on the first morning is who climbs the ladder and what that person can do on a steep pitch. A question that gets less attention is what the company does if a crew member arrives impaired, or uses something on the job that makes the roof less safe. For a St. Louis homeowner with a side gate, a driveway and a window open for the cool air, that is a fair thing to ask before the first nail goes in.
Why this question belongs in the comparison
A roof crew works on a sloped surface, often several stories up, with pneumatic nailers, heavy bundles and debris falling below. When something goes wrong, it goes wrong quickly. Each company has its own rule for a worker who is impaired, and that rule is rarely printed on the bid. You may find it in a handbook or a safety plan the company keeps in its office. Asking for it is a reasonable request, and the way a company answers tells you how it runs a site.
This page does not cite a state or federal rule that requires a specific drug and alcohol policy for a residential roofing crew. That means the policy is whatever each company writes for itself, and the homeowner should see it in writing rather than rely on a spoken promise.
Roofer comparison
Put the same questions to every roofer on your list, in the same words, and write down each reply. Ask:
- Does your company have a written drug and alcohol policy for field crews, and can I have a copy?
- What does the foreman do if a crew member arrives on my property impaired?
- Who sends that worker home, and who gets them off the lot?
- Does the policy cover prescription medication that affects balance or judgment, and who decides?
- Do you test, and if so, when: before hire, after an incident, or at random?
- How many times in the past year has a worker been sent off a job for this reason?
Listen for specifics. A company that answers with a named procedure, a named person and a time frame has thought about the problem. A company that says the crew is a family and that this never happens has not answered the question. Write that reply down too. It is still data.
Pay attention to who answers. The owner, the office manager and the foreman may each give a different reply. If the foreman is the person who would make the call on your roof, ask to hear from that person directly, not only from the sales desk.
What a written answer should cover
- The name of the person on site with authority to stop work.
- What happens to the worker after they leave the lot, including how they get home.
- Whether you are told the same day, and how.
- Whether the crew is replaced and whether the start date moves.
- Whether the policy applies to subcontractors who touch the house.
The last line matters more than it looks. A roof job often brings a separate tear-off crew, a dumpster hauler or a gutter installer onto the lot, and each one brings its own people. Ask whether the rule travels with them.
Heat belongs in the same conversation. A St. Louis August can put a crew on a steep roof in conditions that slow a worker's reactions. Some companies treat heat stress and impairment under one stop rule, and others keep them apart. Ask which one applies, and what the crew does when it reaches the limit.
What it costs
A written policy, a testing program and a designated supervisor all cost the contractor money. That cost usually sits inside overhead rather than on a separate line of the bid. This page does not give a dollar figure for any of it, because none is published here. What a homeowner can check is whether the cost is inside the total being compared. If one bid is lower because it has no written policy and no one assigned to make the call, the difference is real and should be counted as a gap in the comparison, not as savings.
Some companies pass a testing charge or a supervisor's day rate through to the customer. Those charges belong in the bid with a line name and an amount, so they can be compared directly with the other bids. If a roofer says the policy is included and cannot show where, treat that as an open item to settle in writing before you sign.
A lost day has a cost too. If a crew member is sent home in the middle of a tear-off, the roof may be left open overnight. Ask who supplies the tarp, who checks it, and whether the schedule moves at no charge to you. The answer should be in writing before the contract is signed. This page does not say who should carry that cost in any particular job. It only says the question belongs in the comparison, because the answer changes what the job actually costs you.
What to ask
Keep the list short enough to get through in one phone call. Four questions do most of the work:
- Can you send me your written policy for the crew working on my lot?
- Who on site can stop the work, and how do I reach that person on roof day?
- If someone is sent home, what happens to my open roof that day?
- Is the cost of this policy inside the total on my bid, and if so, where?
If a roofer says the handbook is confidential, ask for a summary in writing that covers the steps, the people and the timing. A company can keep its full manual private and still tell you how it runs a site.
Date each reply and keep it with the rest of the bid file. A verbal answer over the phone is a starting point. The written version is what you can hold a company to later.
Reading a reply
An answer that is specific, written down and tied to a named person is more useful than one that is warm and vague. A reply that says safety comes first tells you nothing about the lot behind your house. Ask the follow-up: who, when, and what happens next. The gap between the first answer and the second one is often where the comparison is decided.
If you are comparing Keys Roofing, the office number is (314) 220-2333, and the same four questions apply to it. Write the answers down the same way you would for any other bid on your list.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.