Ask Each Roofer What Glove Rule Holds When the Nails Get Cold
A St. Louis cold snap changes how a crew handles nail guns and footing, so compare each roofer's written glove rule before you pick a date.
A January morning on a St. Louis roof is a different job than the same roof in July. Frost sits on the north slope until mid-morning, the shingles are stiff enough to crack at the tab cut, and fingers that have been out in cold air for an hour do not work a nail gun the way they do at noon. Most roofing quotes say nothing about gloves, hand warming, or when a crew steps off the roof to get warm. That silence is worth testing before you pick a start week, because the answer changes how fast the job moves and how safe it is for the people walking on your roof.
This page is for the homeowner who has two or three bids on the table and wants one more fact before choosing. The question is simple: what does each roofer do with their crew when the temperature drops, and is that written anywhere you can read it?
Why cold hands are a job-site question
A nail gun needs a steady hand on the trigger and a clean grip on the tool. A glove that is too thick makes it harder to feel the trigger, and a glove that is too thin lets the cold into the fingers within a few minutes. Crews who work through a cold morning often end up with slower nailing, more missed nails, and more shingles that need to be pulled and redone. A missed nail on a cold day is also more likely to sit high or crooked, which is one of the things a later inspection or a storm can expose.
Footing is the other concern. Frost and thin ice on a shaded slope make the walk from the ladder to the work area slippery, and wet felt or damp decking is harder to stand on than dry plywood. A crew that keeps going because nobody wants to lose the day is the crew most likely to slip. Ask each roofer what they do about this, not just what they hope.
Cold also affects the materials. Sealant strips need warm days to bond, and a shingle bundle that sat in an unheated truck overnight may need time before the crew can open it cleanly. Those are separate questions from hand comfort, but they land on the same calendar, so a roofer who has thought about one usually has thought about the other.
What a written glove and warm-up rule should cover
A useful rule is short and specific. It names the glove type the crew is allowed to wear, says who decides when a crew comes down, and describes where the crew warms up. It should also say what happens to the schedule when a stop is called. Look for these points in each roofer's paperwork:
- The glove type allowed on the nail gun hand, and whether a thinner liner glove is permitted under it.
- The temperature or wind condition at which the crew stops nailing, and who calls that stop on your lot.
- Where the crew warms up, such as a truck cab, a designated spot on the lot, or a restroom, and whether they will use your garage or basement only with your written yes.
- Whether warm water and a warm drink are provided, and who supplies them.
- How a cold-day stop is logged, so you can see the hours lost and the reason for each one.
- Whether a weather stop changes the completion date or the price, and where that is written.
Notice whether the rule is attached to the scope or sits in a sales conversation. A rule that exists only in the salesperson's head will not be followed by the crew on a bad morning.
Roofer comparison
When you read the answers side by side, look for specifics first. A roofer who says the crew uses the right gloves and takes breaks when needed has given you a general reassurance. A roofer who names the glove, gives a stop condition in degrees or wind speed, and says who makes the call has given you a rule you can check on the day.
Pay attention to who makes the call. If the stop depends on the crew leader's judgment alone, ask whether that person is on site every day or whether a foreman sets the rule from the office. A crew with no one on the lot to call a stop is a crew that keeps nailing through the bad hour. Compare whether the answer names a person, a role, or nobody at all.
Also compare how each roofer answers when you push. Ask the same question twice, a week apart, and see whether the answer stays the same. If the glove rule changes between your first call and your second, write down both versions. A rule that shifts under light questioning will shift again on a cold morning.
What it costs
Gloves, warm drinks, and a warm-up spot rarely appear as their own line in a roof bid. Most of the time they are folded into labor, which means the bid is not showing you what the cold-day approach costs. Ask whether the rule is included in the labor price or charged separately, and whether any extra hours are billed.
The larger cost is time. A cold-day stop adds delay, and delay can push the job into a worse weather window. Ask each roofer how many cold-day stops their schedule assumes, and what happens to the completion date when the crew loses a morning. The answer should be in writing, because a verbal promise that the crew will make up the time later is hard to check.
Watch for any language that moves the cost of a stop onto you. A roofer who says the homeowner must supply heat, shelter, or water for the crew should say so in the bid, with a number or a clear rule. Missing items of this kind are often the ones that surface as surprise charges at the end of the job.
What to ask
- What glove does your crew wear on the nail gun hand, and is a liner glove allowed underneath?
- At what temperature or wind speed does the crew stop nailing, and who on my lot makes that call?
- Where does the crew warm up, and what do you supply, such as warm water or a drink?
- How is a cold-day stop logged, and will I see that log?
- Does a weather stop change the completion date or the price, and where is that written?
- How many cold-day stops does your schedule assume for a job in my start month?
Send these questions to each roofer in the same words, and file the replies together. The answers will tell you more about the crew's habits than any reassurance on the phone. If a roofer cannot answer one of these in writing, note the gap next to their bid, because that gap will still be there on the morning the nails start to slow down.
For questions about the scope or a site visit, call the Keys Roofing office at (314) 220-2333.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.