Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Ask Each Roofer to Use One Set of Slope Names From Quote to Crew Order

Ask each roofer to name every slope the same way on the quote, the photos and the crew's work order, so you can check the work against the bid.

A roof is measured by its slopes, and most homeowners never see the names attached to them. One roofer writes "back slope," another writes "rear," a third writes "slope 2," and the photos use yet another label. When the crew starts work, nobody can say for certain which section of the roof they are standing on. This page covers how to ask each St. Louis roofer to use one set of slope names from the first quote through the crew's daily work order, so you can check what gets built against what you were promised.

The question is practical. A house in St. Louis County usually has two to four main planes, plus dormers, a porch or a garage tie-in. Each plane gets different sun and different weather. The north side of a house can stay damp and shaded through a freeze-thaw cycle, while the south and west sides dry faster and warm up sooner in March. Those differences change the order of work, the nail count where the decking is soft, and where ice can back up at the eave. If the quote calls a section one thing and the crew calls it another, the job gets harder to check.

Roofer comparison

Put the same request to each roofer in writing: name every slope by compass point, and use those exact names in the quote, in the photos they send you and in the work order the crew uses each morning. Compass points beat landmarks like "over the garage" because they do not move when the crew changes or when the house is sold. Where a roof has a hip, a gable or a shed section, the roofer should say which compass point each plane faces and list the planes as separate lines.

Read the replies the same way. A roofer who answers with a sketch that labels each plane by compass point, and whose count matches the slopes on the quote, is giving you something you can check. A roofer who says only that the crew will "figure it out on site" has not answered the question. A roofer who uses one set of names on the quote and a second set on the photos is giving you two documents that disagree, even if neither one is wrong.

  • Quote: each slope listed with its compass point and its square count.
  • Photos: each photo tagged with the same compass point, taken from the eave looking up the plane.
  • Work order: the crew's daily plan naming which slopes come off, which get underlayment and which get shingles that day.
  • Sign-off: the foreman signs the day's list, and you keep a copy.

The same naming should hold for valleys, hips and ridges. A valley runs between two named slopes, so the quote should say which two. A ridge that sits between the north and south planes should be called by that pair, not "the top." This sounds tedious, but it is the difference between a bid you can audit and a bid that depends on memory.

What it costs

Using one set of names does not change the price. What it changes is how easily you can see whether the price matches the work. Each slope has a square count, and each square count feeds a line on the quote. If two bids split the same roof differently, one with three planes and one with four, the totals will not compare cleanly until you see how the planes were drawn.

Ask each roofer for the square count per slope before you compare totals. A slope that was measured as one plane but built as two will show up as a change order later, and the change order is where a clean-looking bid becomes a higher final number. Ask how they will record any slope that gets added or dropped during the job, and ask that the record use the same compass points. A change order that names "the lower section" cannot be matched to a slope on the original quote.

Keys Roofing installs Atlas and Malarkey shingles, and the bundle count follows the square count of each slope. If the quote lists material by slope, you can check the bundle count against each plane before the pallet lands. If the quote lists material only as a total, you have to trust the arithmetic. Ask each roofer which method the quote uses. The Keys office line is (314) 220-2333 if you want to ask directly.

What to ask

Ask each roofer these questions in the same order, and write down the answers as they give them:

  1. Which compass points will you use to name each slope on the quote and on the work order?
  2. How many separate planes did you count, and which compass point does each one face?
  3. Will the photos you send be tagged with the same compass points?
  4. Who on the crew keeps the daily list, and will you give me a copy each morning?
  5. If a slope is added or dropped mid-job, how will the written change name it?
  6. Where does the quote record which slope gets ice and water membrane, and which gets only underlayment?

Compare the replies on specifics. A roofer who gives the same count of planes, names them the same way and agrees to a daily copy is easier to hold to the quote than one who answers in general terms. If one roofer counts five planes and another counts three, do not guess which is right. Ask both to walk the property with you from the ground, pointing at each plane and naming its compass point, and write down what they show you.

Keep your own copy of the slope list once the quote is signed. When the crew arrives, check the work order against it. When the tear-off starts, check which slopes come off first against the order you were given. If the names drift from the quote to the crew, call the office and ask which list governs, and get that answer in writing.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection