
Ask Each Roofer How the Front Door Stays Sealed on Roof Day
Compare how each roofer keeps tear-off dust out of your entry, floor and storm door, and what each one will put in writing before the crew arrives.
The front door is the one part of a house that every visitor, delivery driver, and family member uses during a roof job, and it is also where tear-off dust, shingle grit, and crew foot traffic can come straight into the foyer. Most roof bids say nothing about it. A written answer from each roofer tells you how they plan to keep the entry clean, how people will move in and out, and who is responsible if a threshold or storm door gets scratched.
Why the entry matters on a St. Louis roof
Tear-off in St. Louis lifts old asphalt shingles, underlayment, and nails, and the dust and granule grit can drift a long way on a windy day. Older brick houses in the city and across the county often have a solid wood or steel entry door with a threshold that does not seal tightly, and a storm door that rattles every time the wind shifts. In the summer, when windows and doors are propped open for airflow, the entry becomes the easiest route for dust to reach the hall, the stairs, and the carpet.
The entry also sees the most traffic. Crew members carry bundles, dump buckets, and tools through the house or along the side of it. Dumpster loads, shingle pallets, and ladder runs often converge on the same walkway. A homeowner who works from home may need to get in and out without stepping through a work zone, and a household with a young child or an older adult needs a clear, safe path to the door.
What the crew should say
A roofer who has planned for the entry will usually name three things before the first nail: which door the crew uses, how that door is kept closed or covered during work hours, and where the homeowner will enter and leave on days the front is blocked. Ask them to say these in plain words, then ask for the same answer in writing. A reply like "we will be careful" is not a plan.
Listen for specifics about the floor and the threshold. Good answers mention a drop cloth or floor runner laid from the door to the nearest work path, a rule that the storm door stays latched except when someone is actively passing through, and a plan for the door sweep or threshold if the house has one. Also listen for how the crew will handle the door frame if the trim paint is old or the hinge pins are loose, because a crew that bangs the frame on the way through can crack the trim.
What to ask each roofer
- Which entry will the crew use, and will the front door stay closed during work hours?
- What covers the floor between the door and the stairs, and who lays and removes it?
- Will the storm door be latched, and who checks it at the end of each day?
- How will you keep tear-off dust off the threshold and out of the foyer carpet?
- If my front door is blocked, where do I enter and leave, and who clears that path?
- Who repairs a scratched door, a cracked storm glass, or a damaged threshold if one happens?
- Will you walk the entry with me before the first day and photograph its condition?
Ask for the answers in writing, with a date. A reply that changes when you ask a second time is itself a finding. If the answer to the last question is "we do not cover doors," read what the written scope says about trim, glass, and thresholds before you sign.
What it costs
Protection of the entry usually appears as a small line item or as part of general site protection. Floor runners, drop cloths, a temporary door cover, and an extra cleanup pass cost little on their own, but they add up over a multi-day job. Ask each roofer whether that protection is included in labor, listed as a separate material, or left out entirely. If it is left out, a later change order can land on the homeowner in the middle of the job.
Repair costs for a damaged door or threshold are a different number, and they are rarely in a roof bid. Ask who pays for a replacement storm glass or a new threshold if the crew breaks one, and get that answer in writing before the trucks arrive. Keep this question separate from any discussion of what a homeowner's insurance covers, because that is a conversation between the homeowner and their own insurer.
Roofer comparison
Put the answers side by side on one sheet. Mark each roofer on five points: which door they use, how the floor is protected, how the storm door is handled, what happens to the threshold and trim, and who pays if something is damaged. A roofer whose answers are specific on all five is giving you a plan you can check on day one. A roofer who answers three of the five and says the rest depends on the crew is giving you a risk you will carry alone.
Compare the walk-through too. A roofer who inspects the entry with you and writes down the condition of the door, the glass, and the threshold before the crew arrives gives you a baseline. Without one, the homeowner has to prove the door was intact after the work, and that is hard to do from memory.
If you want to talk through the entry plan for your house before you choose, Keys Roofing can be reached at (314) 220-2333. Ask Keys the same five questions you ask every other roofer.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.