
Ask Each Roofer How the Crew Counts Its Tools Off Your Lot Each Evening
Ask each roofer how the crew counts its tools and ladders off your lot at the end of each day, and who signs for any that stay behind.
A roof crew carries more loose equipment onto a St. Louis lot than most homeowners expect. A typical day can put nail guns, a compressor on a hose reel, air hoses, chalk boxes, pry bars, a circular saw, extension cords, a pallet jack, tarps, and a stack of ladders into your yard and along your drive. Some of it leaves in the truck at night. Some of it sits by the side of the house until morning, and a few pieces sometimes stay behind for a day or two when the crew starts late or takes a second truck to the supplier. This page is about one question that most bids never answer: how the crew counts what came onto your lot, and what it counts when it leaves.
Ask each roofer to describe the count in their own words. A count that exists only in a foreman's head is not a count you can check. You want to know who does it, when, what it covers, and where the list is kept. The answers will vary, and the variation tells you how the crew manages its own equipment, which matters on a job that will run for several days and possibly across a weekend.
Why the count matters on a St. Louis roof
St. Louis weather is hard on equipment left outside. A compressor or a nail gun left on a lot through a damp night can take in moisture, and a freeze after a wet week can crack a hose or a plastic housing. In late fall and early spring, a cold snap can turn a left-out bucket of sealant or a cordless battery into a loss before the crew returns. Summer afternoon storms can drive hail or wind across an open yard that holds a stack of loose tools. A count at the end of each day is the simplest way to know what is still in the truck, what is on your lot, and what needs to come inside before the next storm.
The count also matters because roof crews are often mixed: a lead installer, a few hands who may change from day to day, and sometimes a subcontractor who brings his own gear. When tools belong to different people, the end-of-day count is the only moment a homeowner can see who owns what before the next morning. Without it, a missing item becomes a dispute among people who each believe the tool was someone else's.
Questions to put to each roofer
Send the same questions to every roofer on your list, and write the answers down beside the question. Keep the wording identical so the answers can be compared:
- Who counts the tools each evening, and is that person the lead installer, a foreman, or a hand on the crew?
- What is on the count? Does it include power tools, hand tools, compressors, hoses, cords, ladders, pallet jacks, tarps, and chalk?
- Is the count written, and does it name each item by type or by a tag number?
- Where does the list live at the end of the day, and can you see it?
- When something is missing in the morning, who checks the truck, the lot, and the neighbor's yard, and in what order?
- Does the crew count again before the last truck leaves the job, or only at the end of each day?
Pay attention to answers that stop at we keep track. That phrase describes an intention, not a method. A roofer who can name the form, the person, and the time has a count. A roofer who describes a routine without any paper has one that depends on memory, and memory is weakest on the busiest, most exhausted day of a roof.
Where the count should be written
A written count does not need to be complicated. A clipboard on the truck, a short list in the crew's phone, or a photo of the tailgate with a dated time stamp can all do the job. What matters is that the record exists, that it is dated, and that you can ask to see it. Ask each roofer whether the count sheet is shared with the homeowner at any point. Some crews will text a photo at the end of each day. Others will hand a copy to the homeowner at the final walk. Both are workable. What is not workable is a count that never leaves the crew's truck.
If you already have a daily sign-in or lot log from the same roofer, ask whether the tool count sits on the same sheet. Keeping the two together makes it easier to reconstruct a day if something goes wrong. Keep a copy of the sheet in your own file, dated the same day it was written.
What a missing tool should set off
Loss of a tool is a contract question before it is a repair question. Ask each roofer, in writing, what happens if a tool is missing at the start of the next day. The answer should name the first step, such as a search of the truck and the lot, a call to the crew lead, and a check of the neighbor's yard if the item could have blown or rolled. It should also name who pays for a replacement and within what time frame. A bid that says nothing about this leaves the question open until the morning it matters most.
A roofer may also say a missing tool is the homeowner's problem because it was left on the property. Ask them to put that position in writing, along with the reason. You are not asking them to accept liability by answering. You are asking them to state the rule they follow, so you can compare it with the next roofer's rule. Your own homeowner policy may cover some property left on your lot, and you can check that with your agent. A roofer is not the right person to advise you on your own policy.
What the crew should not leave overnight
Some equipment should come off the lot every night regardless of the count. Compressors and gas-powered tools can carry fuel or oil, and they draw attention from anyone walking past. Battery packs should go inside or into the truck, because a freeze can shorten their life. Ladders left against the eave can be pushed over by wind, and a ladder that falls on a parked car is a claim you do not want. Ask each roofer to list what stays on the lot overnight and what goes into the truck. A crew that can tell you this at the first call has thought about the count before it reaches your house.
If the crew uses a storage trailer, ask where it parks, whether it is locked, and who holds the key. A trailer on a public street is a different risk from a trailer in your drive, and the answer belongs on the same sheet as the count.
How to compare the answers
Lay the answers side by side. Mark each roofer on three points: whether the count happens every day, whether it is written, and whether you can see it. Then mark how each roofer answers the missing-tool question. A roofer who answers every point with a clear method and a name is easier to plan around than one who answers in general terms. If two roofers are close on price, the one with the clearer count is usually the one whose crew you can see and check.
When you have the answers, call the office line at (314) 220-2333 and ask for the same answers in writing before you choose. Keys Roofing can confirm how its own count works, and a written reply gives you something to hold against the day it is needed. Ask for the reply to be dated, and keep it with the rest of the bid file.
Nothing here replaces the walk-through or the written scope. It is one more line for the bid, and it is the line most homeowners forget to ask about until the crew has already gone home for the night.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.