Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Ask Each Roofer How Many Working Hours Your Week Holds

Each roofer's schedule turns into a number of real working hours on your lot, and the gap between the two is worth comparing before you sign.

A roof bid usually lists a start week, a number of days, and a total. What it rarely lists is how many hours of real work happen on your lot each day. In St. Louis that gap matters more than most homeowners expect, because the weather, the freeze and thaw cycle, and the short daylight in November and December all cut into the hours a crew can actually spend on the roof. Two bids with the same number of days can deliver very different amounts of roof in the same week. This page shows how to ask each roofer for the hours behind the schedule, so you can compare them on the same footing.

Roofer comparison

Start with the number of days each roofer writes into the schedule. Then ask how many of those days are full working days on your roof. A crew that arrives at seven, stages materials, and waits for a deck that has dried after an overnight dew may only nail for part of the morning. A crew that starts on a damp deck may lose a half day to a rule it has to follow. Neither answer is wrong by itself, but you need both answers before you can line up the bids.

Ask each roofer to state, in writing, the start time, the stop time, and the number of hours of roof work they expect on a normal dry day. Ask the same question for a summer day with afternoon storms, and for a short winter day when the sun is down before five. If the roofer cannot give a range for each case, the schedule is a guess, and a guess is hard to hold them to. A range is useful even when it is wide, because it tells you what the roofer has already thought about.

Pay attention to the hours that go to things outside the roof. Loading the truck at the yard, driving to your house, unloading bundles, and setting up the dumpster can take a large share of a morning. Some roofers count those hours inside the working day. Others treat them as travel or setup. The difference changes how much roof gets opened before lunch, and it changes how many days the job really takes. Neither method is unusual, so the question is simply whether the bid says which one it uses.

Hail season adds its own pattern. In the warm months, a crew that works through a clear morning may still have to stop when a line of storms builds to the west in the afternoon. A roofer who plans to keep the roof open through that window has to be ready to tarp it quickly. Ask each roofer who makes the call to stop, how long the crew needs to button up, and whether the tarp is part of the bid or an extra line.

When a roofer gives you a single number of days without the hours behind it, write that down as an open question. Do not fill the gap with the other bid's answer. The point is to see each roofer's own reasoning, so the comparison shows where the time goes.

What it costs

Hours on the roof are part of the cost, even when the total on the page does not show them. If one roofer plans six working hours a day and another plans nine, the longer schedule may finish in fewer days, but the crew is on your lot for more hours each day. That means more noise, more foot traffic on your walks and side yard, and more open roof exposed to an afternoon storm. The price may be the same, but the way the time is spent is not.

Ask whether the bid assumes a fixed daily crew size or a flexible one. A crew of four working six hours is a different plan from a crew of three working nine hours, even if both produce the same square count. Ask each roofer how the crew size changes on a rain-stopped day and whether that changes the price. The question is not a trick. It tells you where the cost sits if the hours shrink, and it shows whether the roofer has priced a slow day at all.

If the bid is priced by the square, the hours matter less to your total but still matter to your calendar. If the bid is priced by the day, the hours matter directly, because an unproductive day can add to the bill. Read the pricing terms with that in mind. A per-square price and a per-day price can produce very different totals for the same roof when the weather is poor in the first week.

Freeze and thaw changes the math in the colder months. A deck that is frosted in the morning can push the first nail back by an hour or more, and a short December day can end before the crew has finished a slope. Ask each roofer whether a late-season bid assumes a fixed number of working hours, or whether it assumes the crew will make up the time later. Those two answers lead to very different completion dates.

Ask how a change in hours reaches your paperwork. A verbal explanation at the end of the day is not a record you can compare against the bid. A written daily note that lists hours worked, hours lost, and the reason for each is something you can hold next to the contract. If a roofer will not put the hours in writing, that is an answer you should also log.

What to ask

Use the same list for every roofer, in the same order, and write each answer beside its question.

  • How many working hours on our roof do you plan on a normal dry day, and what time does the first nail go in?
  • How many hours does that drop to on a day with afternoon storms in July, and who decides when the crew comes down?
  • How many hours are lost to loading, driving and unloading, and are those counted inside the workday?
  • What is the latest hour your crew works in late November and December, and what sets that stop?
  • Does your schedule count a rain-stopped day as a standby day, and where does that day appear on the calendar?
  • If the crew runs short of hours, which bid line changes first, and in what written form does the change reach me?

Keep the answers together. A roofer who gives a clear range on each question is easier to hold to the schedule. A roofer who says it depends and does not name what it depends on is also giving you a comparison data point. Write that down as well, because it tells you how the roofer will answer when the weather turns.

Putting the hours side by side

Once each roofer has answered, build a short table in your own notes with four columns: days on the schedule, working hours on a dry day, working hours on a storm-affected day, and hours listed outside the roof. Then look at the totals. Two bids may look close on days and far apart on hours, and that is the comparison that matters for your house. A bid with fewer days and longer hours can be a good fit if you are home all day and can tolerate the noise. A bid with more days and shorter hours can suit a household that needs quiet in the afternoon.

Re-check the table after the second visit. Roofers sometimes revise their hours once they have seen the pitch, the access path, and the staging space. If a number changed, ask what caused the change and write down the new figure with its date. A revised number without a reason is a question for the roofer, not a fact for the table.

Keys Roofing is the contractor behind this site, and its office line is (314) 220-2333. If you want to talk through the schedule questions before you send your list out, call that number. The same questions work for any roofer you are comparing, whether or not you call first, and the answers should match the written bid you end up holding.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection