Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Ask Each Roofer How Many People Leave Your Lot at Dusk

Count the people who leave your lot each evening, then compare each roofer's answer before a St. Louis roof day begins.

On a roof day, the crew does not always leave when the last shingle goes down. Some days the tear-off finishes late and the deck is still open when the light goes. Some days a crew member stays behind to load the trailer, and another drives off early for a supply run. The number of people who leave your lot at dusk, and who is still standing in your yard after the trucks pull out, decides who is responsible for an open roof overnight. Ask each roofer that number directly, and write down the answer next to the question.

Why the evening headcount matters

An open roof is a roof with its underlayment or its deck exposed to the sky. In St. Louis, a summer storm can build within an hour, and a late-autumn front can bring wind and rain before the next morning's crew arrives. A deck that was dry at five o'clock can take water by seven. Someone has to decide whether the tarps are checked, whether the ridge is secured, and whether a loose sheet of plywood is moved away from the edge. If the crew leaves with two people and returns with five, the homeowner may not know who was on the roof and who is responsible for it.

The headcount also matters for your house. Crews carry tools, ladders, air compressors and sometimes generators. A gate left open, a side door propped for hauling, or a dumpster lid left up can all become a problem before morning. When you know how many people leave, you can check the lot against that number. If three people come down the ladder and only two cars leave the curb, you have a question to ask before the crew drives away.

Frost and freeze add another reason. In a St. Louis winter, a partially fastened roof that gets a thaw and then a hard freeze can shift, and the crew needs to know who checks it the next morning. The headcount tells you whether someone is staying behind to watch the work or whether the job simply stops until the next day.

Roofer comparison: what each answer should include

A good answer to the dusk question is specific. It names a number, names who stays, and says what happens to the open roof. A vague answer such as "we take care of it" tells you nothing about the people or the tarps. Compare each roofer's reply against the same short list.

  1. The number of crew members on your lot at the start of the day and at the end of the day, written as two numbers.
  2. The name or role of the person who stays behind, if anyone does, and the hour that person leaves.
  3. Who checks the tarps and the deck before the last truck leaves, and whether that check is written in the daily log.
  4. What happens if the weather turns after the crew has left, and who you call first.
  5. Whether the crew uses a sign-out sheet, a text message to the office, or nothing at all.

If one roofer says the crew is always four people and another says it changes by the day, ask for the typical count and the highest count they expect on your job. A range is useful. A promise that never changes is usually a planning number, not a count of the people on the ladder.

What it costs

The number of people on your roof affects the labor in the bid, and it can affect the cost of a standby person. If a roofer keeps a crew member on your lot after the others leave, that hour is paid labor. Some roofers include it in the daily rate. Others list it separately as a watch or a tarp visit. Neither approach is wrong, but the difference matters when you compare totals. Ask each roofer whether the evening check is inside the price or billed as its own line.

Ask also what happens if the crew has to return after dark or the next morning to secure a roof. A second trip is a line on the bid, and the wording varies from one roofer to the next. Read the line that describes it and write down whether it is priced by the visit, by the hour or by the day. If a roofer does not know the answer, that is also information you should record.

The cost of a crew that leaves the roof open is not only money. If you learn a week before the roof date that the crew has no plan for evenings, you may need to change the start date, the dumpster schedule or the ladder plan. Those changes can move the total. Ask about the evening plan before you sign, not after the first storm.

What to ask

Put these questions to each roofer in the same order and in the same words. Write down the answer as given, then note any question that gets a vague reply.

  • How many people leave your lot at the end of a normal roof day, and how many arrive in the morning?
  • Who is the last person to leave, and what does that person check before they go?
  • Does anyone stay on the property overnight, and if so, who is that person and how do you reach them?
  • How is an open roof secured at dusk, and who decides whether the tarps are enough?
  • Is the evening check written in a daily log, and can you see that log?
  • Is the evening check in the price, or billed as a separate line?
  • What is the plan if a storm arrives after the crew has left?

Ask each roofer to answer these questions in writing, by email or on the same sheet you use for the rest of your comparison. A written reply gives you something to hold each roofer to. A spoken reply is harder to check after the crew arrives.

If you want to talk through how Keys Roofing handles the end of a roof day, call the office at (314) 220-2333. Ask for the written daily process and the evening plan, and keep the reply with your other roof papers so you can compare it against the next bid.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection