Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Ask Each Roofer How Many Daylight Hours Their Bid Assumes

Short November days in St. Louis change how much roof a crew can finish, so each bid should state its hours and what happens at dusk.

On Sunday, November 1, 2026, the clocks in Missouri fall back an hour. For a homeowner with a roof on the calendar, that is more than a change to the kitchen clock. A crew that starts at 7:00 in the morning in late October will find the working light ending earlier each week, and by the last week of November sunset in St. Louis comes before 5 o'clock. A roof bid that counts a full working day as if the sun stays up for it has not checked the calendar. This page is about asking each roofer how many daylight hours their price assumes, and what they plan to do when the light runs out.

Why the day is shorter than the bid thinks

A roof job is not one continuous task. The crew strips the old shingles, checks the deck, lays underlayment, flashes the penetrations, and then nails the new shingles and cleans up. Each of those steps needs light to do well. Nail placement, flashing seams and the chalk line at the eave are hard to judge under a work light on a steep slope, and a crew that runs past dusk tends to rush the last section of the roof, which is usually the section the homeowner will see from the street.

St. Louis adds its own weather to the count. Late-fall mornings often start cold enough that shingles stiffen and sealant strips take longer to bond, and afternoons can turn windy. A crew that loses the first hour to frost and the last hour to dusk may have six or seven usable hours on a short day, not the eight or nine a summer schedule assumes. Ask what the bid counts as a workday and how many of those hours the crew expects to spend on the roof.

What a daylight assumption looks like on paper

Most proposals do not say how many hours of light they expect. They list a start date, a number of days and sometimes a crew size, and leave the rest to the schedule. That is not enough to compare two bids. One roofer may plan a three-day install in summer light and quote it as a three-day job in November. Another may add a day, or split the work so the tear-off and the install land on different days. Both can be honest. Only one of them has said what it assumed.

Look for the start time and the stop time, if they are written at all. Look for whether the day is described as a fixed number of hours or as "until the light is gone," which is not a schedule. Look for whether the bid includes a line for temporary lights or a shortened final day. A proposal that does not mention daylight at all is not the same as one that has already accounted for it.

Questions to ask each roofer

  1. What start and stop times does your bid assume for each day of the job in late October and November?
  2. How many working hours do you expect to get on the roof on a day that starts with frost and ends at sunset?
  3. If the sun sets before the crew finishes a slope, do you stop, tarp the open section, or keep working under lights? Who decides?
  4. Does your price include temporary lighting, and if it does, is it for the crew only or also for the driveway and the yard?
  5. In the cold months, will the tear-off and the install be scheduled as separate days, and what does that do to the total number of days?
  6. If the job runs into a short week because of daylight, is there an added charge, and is it written into the contract?

Write the answers down next to each other. Two roofers may give you the same start time and very different stop times. The gap between them is the number of hours the cheaper bid is betting on.

How the shortened day changes the open roof

The hours matter most because of what an open roof has to survive. When a crew strips a section and cannot finish it before dark, the deck is exposed overnight. If rain or wind arrives, the homeowner's ceiling is the first place anyone will look. A roofer who plans for short days should say how the open section will be covered at night, who checks the cover, and when the crew returns. That answer belongs in the same conversation as the daylight question, not in a separate one about tarps.

Ask also how the crew plans to end a day. Some roofers stop tear-off at a set point each afternoon so that every stripped area is covered before anyone leaves. Others let the crew decide when the work is done. The first approach costs more time. The second may cost more in water if a front comes through at night. Neither is wrong on its face, but the homeowner should know which one the bid uses.

What to write into the schedule

Once you have answers, ask that the schedule itself state them. A short line for each working day is enough: the start time, the expected stop time, the step the crew expects to finish, and the cover plan for any open area. If the roofer will work under temporary lights, the schedule should say so, because a lit roof at night is a different job for the neighbors and for the crew.

When you put these questions to Keys Roofing, ask for the answers in writing and attach them to the schedule. For a homeowner deciding between bids, the test is simple. Each bid should say how many hours of light it counts on, what happens when the light runs out, and how the open roof is protected overnight. A bid that answers those three questions in writing is easier to compare than one that offers a lower total and leaves the calendar to chance.

When the calendar is the real constraint

Daylight is not the only thing that shortens a late-fall roof job. Freezing nights can delay the start until the deck has warmed and dried, and a wet morning can stop the crew until the shingles and the deck are dry enough to work. Those delays are not a roofer's failure, but they belong in the bid conversation. Ask each roofer how many winter-season days they expect to lose, and whether the price assumes those days or assumes they will be made up later in the year when the weather is worse.

Get the hours in writing before the first shingle comes off the truck.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection