
Ask Each Roofer How Long the Estimator Stays on Your Lot
The minutes an estimator spends on your lot before writing the number decide what the bid can actually say, so compare them.
When a roofer's estimator comes to your house, you see a person walking the yard, a ladder against the eave, and maybe a few photos on a phone. What you usually do not see is how long that person stayed, and that number matters more than most homeowners expect. A quick walk produces a quick number. A slower visit that covers the attic, the valleys, the chimney base and the drip edge produces a bid that can say what it is measuring. This page is for the stage where you have two or three written bids in hand and want to know whether the time spent on your property was enough to support any of them.
Roofer comparison
Ask each roofer how long the estimator plans to be on your lot and what that time is for. Some bids come from one visit that covers the roof and the exterior. Others split the work into a measuring pass and a second pass for the attic and structure. Either can be sound. What decides it is whether the time matches the scope each bid promises. If one bid lists an attic check, a chimney inspection and a count of deck sheets, and the estimator was on the property for twenty minutes, the bid is claiming work the visit could not have produced.
St. Louis roofs add specific things a visit has to reach. Hail season leaves bruises that are easiest to see on the windward slope in the weeks after a storm. Freeze and thaw cycles open small gaps at old flashing and around pipe boots. Ice damming shows up at the north eave, where snow sits longest. A three-tab roof that has reached an age where its seal strips no longer bond well is usually a roof where the estimator has to look under the tabs, not just across them. A visit that never reaches those areas can still produce a neat bid. It just cannot tell you much about those areas.
Write down four things for each visit: the start time, the end time, who was on the property, and which areas were walked. Keep the notes in one folder. The aim is not to catch anyone out. It is to see whether each line item has a source in the visit. A bid written from photos taken from the front walk is a different document from one written after someone checked the back slope, the shaded eave and every penetration on the roof.
Pay attention to what the estimator leaves behind before the truck drives off. A good visit ends with a written list of what was measured, what was seen from the ground, and what was assumed. If the attic could not be entered, ask whether that is noted anywhere, and ask who made the decision. Keys Roofing puts a written scope with photos and measurements into the homeowner's hands, so that document is the one to set beside the time the estimator actually spent on your property.
What it costs
The estimator's time is usually not a separate line on a residential bid, and when it is, the bid should name it. The real cost is the gap between a visit that was too short and the adjustments that follow. A bid written after a short walk can come back higher once the tear-off starts, because the crew finds decking that was never seen, a chimney flashing that needs replacing, or a valley that was assumed to be simple. Those findings get added as lines after you have already arranged your schedule around the job.
Ask each roofer whether the price depends on what the visit found. If a bid says the number is final only after a second visit, ask what the second visit will check and whether its cost sits inside the total. Ask what happens if the second visit finds more roof than the first one did. A clear answer keeps the comparison honest. A vague answer means the cost of a short visit is still in the bid, waiting for the crew to find it.
There is also the cost of your own time. Each visit can take a block of the morning, and a second trip doubles it. Across three roofers with two visits each, that is six separate blocks away from work, school pickup or the rest of the household. Ask each roofer to confirm the expected length of the visit when you book it, so you can plan around it instead of learning at the door that another trip is needed.
Keep the visit notes beside the bids, not in a separate phone thread. If a roofer quoted a price on the phone and the written bid came later with different square footage, the notes show when the number changed and what the visit had covered at that point.
What to ask
These questions fit into one call or one email to each roofer. Send them in the same order to every roofer, and write each reply down as it arrives.
- How long will the estimator be on my property, and which areas will be walked?
- Will the attic be entered, and if not, why not?
- Will the chimney, valleys and roof penetrations be checked on site or from photos?
- What will you leave with me at the end of the visit, in writing?
- If the visit cannot reach part of the roof, how is that recorded and priced?
- Is a second visit included in the bid, and what does it check?
Then ask one question with no obvious answer: what could your estimator not confirm from the ground or the ladder? A roofer who can name the item has usually looked hard. A roofer who says nothing could not be confirmed deserves a second look, because every roof has at least one area that cannot be judged until the shingles come off, and an honest bid says which area that is.
Compare the answers side by side. A bid from a roofer who spent a long visit on your property and named the limits of that visit is easier to trust than a bid from one who walked the roof briefly and promises a precise number. Precision on paper is not the same thing as a visit that supports it.
Missouri does not license roofers at the state level, so the time an estimator spends on your property is one of the few visible signs of how carefully a bid was built. Use it as one input beside the written scope, the permit plan and the references you collect. For a permit question on a St. Louis County address, the county permit desk can confirm which inspections apply, and you can check those dates against each roofer's schedule. To ask Keys Roofing about visit length for your address, call (314) 220-2333.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.