Ask Each Roofer How a Rain-Stopped Afternoon Gets Billed
Compare how each roofer prices a partial day lost to rain, and get the answer in writing before the crew climbs the ladder.
A roof day rarely fails all at once. The crew starts at seven, tears off the morning, and then a cell builds over the river bottoms and the sky turns dark by two in the afternoon. Anyone who has lived through a St. Louis spring knows the pattern. The forecast said a 30 percent chance, the radar looked clear for an hour, and at 2:40 the crew is standing on the ridge with wet felt under their boots and nowhere safe to go. The question that matters for your checkbook is simple: who pays for the hours lost to the rain, and how is that answer written down before anyone climbs a ladder?
Each roofer answers that question differently, and the answers do not always show up in the price. Some build a weather allowance into the unit price per square. Some bill a day rate and count any stopped afternoon as a full day. Some charge a standby hour for each hour the crew waits on site. Some charge nothing and simply push the finish date. None of these is automatically fair. What matters is whether you can see which one applies to your job, and whether the answer still holds when the cloud actually arrives.
Roofer comparison
Start by sorting what each roofer says into one of three buckets. The first bucket is a weather allowance already inside the bid. The roofer says the price includes a stated number of rain days, and the schedule shows where those days sit. The second bucket is a standby or partial-day charge, where the roofer names the rate and the trigger, such as the crew being on the roof and unable to work. The third bucket is no charge with a moved date, where the roofer absorbs the lost time but the completion date slips. Write each roofer's answer beside the same question so the three can be read side by side.
Pay attention to the trigger language. A roofer who says the crew stops at the first lightning flash is describing a safety rule, while a roofer who says the crew stops when rain begins is describing something else. Wet asphalt shingles and wet plywood are both slippery and both can tear. Ask whether the stop is for lightning, for rain, for wind over a set speed, or for a combination, and whether the crew leaves the roof at once or waits for a call from the foreman. A stop rule that depends on one person's judgment on the ridge at two in the afternoon is weaker than one with a stated reading, such as a wind figure written into the contract.
Also check how the roofer counts a day that is only partly worked. Some roofers count a morning of tear-off as a half day and bill accordingly. Others count any day that starts as a full day, regardless of how much roof was opened. Ask for the rule in one sentence. If the answer is that it depends on the foreman, that is a comparison point too, because a different foreman on a different afternoon can produce a different bill.
Ask every roofer, Keys included, for a daily log that shows the stop time, the sky condition, and the square footage finished before the crew left. A roofer who cannot produce a log for a stopped day is asking you to accept the bill on trust. Keys installs Atlas and Malarkey shingles, and that product line matters here too, because a shingle installed on a wet deck or in cold weather has its own handling limits that a roofer should be able to name alongside the stop rule.
What it costs
Price the stopped afternoon in three ways before you compare totals. First, find the day rate or crew rate on the bid, if there is one. Second, find any standby line, which may be written as an hourly figure for the crew, a fixed amount per stopped half day, or a percentage of labor. Third, find the cost of the schedule slip, which is not on any invoice but is real: a finish date that moves into a week of more storms, or a deck left open another night. A bid that looks cheapest on the first line can cost more on the second and third.
Be careful with the phrase included in the price. A weather allowance inside a per-square price is a real number, but it is a number the roofer chose. If the allowance covers two rain days and the spring turns wet, the roofer may feel the price was always fair, while the homeowner may feel the price rose at the worst possible time. Ask how the allowance was set and whether it is stated in days, in hours, or not at all. A roofer who can answer with a count of the rain days built into the schedule is giving you something to compare. One who cannot is giving you a feeling.
Standby charges deserve the same scrutiny. A standby line usually starts when the crew is on site and unable to work, and it should stop when the crew leaves. Ask whether the clock starts at arrival or at the first unproductive minute, and whether the time to pack up and drive off is billed. An hourly standby rate with no ceiling can grow faster than the rain does. A daily cap, written into the bid, keeps one storm from turning into a second invoice.
Finally, ask what happens to materials that were already delivered for the stopped day. Shingles can stay on the pallet, but if a delivery was booked and the crew cannot unload safely, some roofers bill a second delivery charge or a re-staging fee. That charge belongs on the same comparison sheet as the standby line, because it lands on your statement just as surely.
What to ask
Ask each roofer the same five questions, in the same order, and write down the answers as given:
- What triggers a weather stop on my roof: lightning, rain, wind over a set speed, or the foreman's call?
- When the crew is stopped by weather, is the day billed as a full day, a half day, a standby hour, or not billed at all?
- Is there a daily or per-stop cap on standby charges, and where is that cap written?
- If a stop pushes the finish date, which day moves, and does the schedule show the new date in writing?
- Will you give me the stop time, the sky condition, and the work completed on any day the crew leaves early?
Then ask for the rule in writing as a single sentence in the contract. A verbal answer on the driveway is not a term. If a roofer's answer changes when you ask the same question a week later, note the change in your own file. Roofers who answer the same way twice are easier to compare than those whose answers shift with the day.
Last, ask what the roofer does after a storm stops the crew. Before the next morning, you should hear how the deck was left, whether any tarp went on, and when the crew returns. Those are not billing questions, but they show whether the roofer treats a stopped afternoon as a schedule event or only as an invoice event. The answer you hear on the first phone call is often the same answer you will get when the sky turns dark on the ridge.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.