Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

Ask Each Roofer for a Floor-Price Bid, Then Check What It Drops

A floor-price bid shows the least a roofer will do, so compare what each one leaves out before you compare totals.

A floor-price bid is the lowest number a roofer will put in writing for a job, and it only means something when you know what it leaves out. Some roofers call it a base bid, a starting scope, or a minimum package. The name changes from company to company, so the wording on the page matters less than the list of work underneath it. If you ask each roofer for their floor price on the same house, you get a number you can compare, but only after you read what each one has taken out to reach it.

Roofer comparison

Start with the same request for every roofer: the lowest scope they will put their name on, with every line that was removed listed by name. A roofer who answers with a total and no list is not giving you a floor price. They are giving you a different kind of number, and it will be hard to compare against the others.

Once the lists are on the table, check three things on each one. First, the tear-off: does the floor scope remove one layer or every layer, and does it name the disposal? Second, the deck: does it include replacing soft sheathing at a set unit price, or does it say deck repair is extra if found? Third, the edge and penetrations: does it include drip edge, pipe boots, step flashing at the sidewall, and the ridge? Those are the lines that disappear first when a number needs to come down.

Keep the list of removed items in a single column next to each roofer's name. When the same item shows up as removed on two roofers' sheets, ask both to say what it would cost to add back. When it shows up on only one, that roofer has a different idea of the job, and you should ask why.

St. Louis roofs make this harder than it sounds. The freeze and thaw cycle that runs from December into March puts real stress on the edges, and the ice damming that shows up at the eave is often a ventilation question as much as a shingle question. A floor bid that drops the ice and water shield at the eave may look fine on the day of the walk and fail the first hard freeze after the crew leaves. Ask each roofer whether the floor scope includes the eave membrane and, if it does not, how far up the deck it would have to run to keep ice out.

What it costs

The floor price is a useful number because it sets the bottom of your range. It is not the number you will pay if the scope stays as written, because most roofs turn up something the floor price did not account for. The question to ask is how much the removed lines would add back, priced as separate line items with unit rates, not as a lump sum.

Ask for unit prices on the lines most likely to change once the old roof is open: decking per sheet, rafter repair by the foot, and drip edge by the linear foot. A roofer who gives you a unit price for each of these has told you what a surprise will cost before the surprise happens. A roofer who says those items will be handled at the time of the tear-off has told you that the floor price is a starting point and the final number is still open.

Look at the arithmetic in the floor bid as well. If the square count is rounded, ask which way. If the waste factor is not stated, ask for it. A floor bid with an unstated waste factor can look cheaper on paper than a full bid for the same roof, when the only difference is how many bundles were left out of the order. Write down the square count from each roofer's sheet side by side, and check the total against the square count before you compare anything else.

Check the permit line too. In St. Louis County, the permit desk applies its own fee schedule, and a floor bid may leave the permit out or name a fee that will change when the pull is made. Ask each roofer whether the permit fee is in the floor price and whose name is on the application. If the answer is that the homeowner pulls it, that is a cost the floor price does not show.

Do not treat a missing line as free. A bid that drops the starter course, the ridge vent, or the cleanup has not made the roof cheaper. It has moved the cost to a later date, often to a crew that will have to come back.

What to ask

Send each roofer the same three questions in writing, and keep the replies in one folder so you can compare the wording later. The first question is which lines were removed to reach the floor price, listed one per line. The second is what each removed line would cost to add back at the time of the tear-off, as a unit price. The third is what the floor price assumes about the roof: how many layers, what deck condition, and what weather window for the start.

Then ask the question that tends to show the difference between two bids. Ask each roofer which removed line they would advise you to add back on your roof, and why. A roofer who can name one or two specific lines, with a reason tied to the age of your roof, the slope, or the exposure, has given you more information than a roofer who says all of them are optional. Optional is not a judgment about your house.

If two floor bids come in close, put them side by side with the removed lines in the same order. The roofer who leaves fewer lines out for the same roof is usually the one whose floor price is closer to the real job. Do not choose on the floor total alone. Choose on the list.

For questions about the work itself, the office line is (314) 220-2333. Ask for the floor scope in writing, with the removed lines named, before you agree to any start date.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection