
A Trip Booked Into Roof Week Turns on the Move Terms in Each Quote
A trip booked into roof week turns on each roofer's move terms, so compare the notice, the reorder rules and the start window before you pay.
A flight, a wedding or a week at the lake often gets booked long before anyone calls a roofer. Then the first crew date lands on the same days, and the homeowner has to decide what to do. This page is for that decision. The useful difference between roofers usually sits in the move terms, not the headline price, so the comparison below works through those terms line by line.
Roofer comparison
Start with the start itself. Ask each roofer for the first day the crew would be on your roof, the earliest and latest days they will accept, and whether the window is a fixed date or a range of days. A range gives you room to ask for a day earlier or later. A fixed date means your trip has to bend around the crew, and that is worth knowing before you pay a deposit.
Next, ask what moving the date costs in notice. Each roofer should be able to say how many days of notice they need to shift the start, how many days of notice you must give to shift it yourself, and what happens to the shingle order if either side moves. Shingles are usually ordered against a date. If the date slides, the bundles may need to be reordered, held or returned, and the quote should say which.
Before you compare, mark your trip on a calendar with the travel days, the packing days and the return day. A crew start that lands on your departure morning is a different problem from one that lands two days before you leave. A roofer may say the early days of a job are flexible while the last days are fixed, because the final walk and the closeout check need the crew on site. Ask which days in the sequence can move and which cannot.
Write the answers in one place so you can compare them side by side. A simple list works:
- The notice you must give to move your trip week, in days.
- The notice the roofer must give if they move the start.
- Whether a moved date keeps the same crew and lead installer.
- Whether the shingle order is held, reordered or returned after a move.
- Whether a lost day is billed, and at what rate.
- Whether the agreed date is confirmed in writing before the deposit is paid.
Keys Roofing can put these answers into the written scope and the start date on the contract. For the current terms on a specific date, the office at (314) 220-2333 is the place to ask, and the answer you get should match what is printed in your paperwork.
What it costs
A moved start is a cost question even when no one raises a price. A crew that waits for a clear day, a crew that comes back a week later, and a delivery that sits on a driveway all carry costs somewhere. The quote may show them as a standby charge, a remobilization line, or nothing at all. Ask which one it is. A quote that says nothing about a moved date is not the same as a quote that says the move is free.
St. Louis weather makes a moved date more likely than most people expect. A late October start can slide into a freeze, and a spring start can slide into a wet stretch that keeps the deck too damp to nail. Hail season and summer heat add their own stops. Ask each roofer what they do when weather takes a day, and whether a weather day counts against the schedule or moves the whole sequence.
Ask whether the quote carries a cancellation or rescheduling fee on the roofer's side, and whether you can cancel without one if the trip is fixed. If the roofer charges for materials already ordered, that charge should be named with an amount or a formula, not a phrase like as applicable.
Travel costs stay with the homeowner. A roofer's quote covers the roof work and the terms for moving that work. It does not cover your flight, your hotel, a cancelled rental or a wedding deposit. Ask each roofer whether any payment to you is written into the quote for a moved date. If none is written, assume none is owed, and plan the trip around that.
Watch the deposit closely too. A deposit paid before the date is confirmed can be money that is difficult to recover if the date moves. Ask what part of the deposit is refundable if the start shifts, and whether the answer changes when the move comes from the roofer's side instead of yours.
What to ask
- What is the earliest start you can give me, and the latest one you would accept?
- How many days of notice do you need to move the start, and how many do I need to give?
- If the crew cannot come on the date we set, what is the next date you can offer, and when do you confirm it?
- Who in your office sets that new date, and can I have it in writing before I pay a deposit?
- Does a moved start change the crew, the scope, the shingle order, the price or the warranty start date?
- If I am away when the crew arrives, who is on site, who signs the daily record, and how do I hear about the day's progress?
- What does the quote say about a lost day, and is that day billed?
- If weather pushes the job into the week of my trip, who decides the new date, and how fast do I hear about it?
Write each answer on the same sheet, with the roofer's name and the date you heard it. An answer that changes between two calls is the one to ask about again. Once you have the answers, you can see which roofer's terms fit your calendar and which ones only work if the roof date stays put.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.