Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

A Swarm on the Staging Is a Roof Day Question, So Ask Each Roofer Who Calls It

A swarm or an active nest near the roofline can stop a St. Louis roof day, so compare who calls the stop and how each roofer handles it.

A swarm of bees can settle on a ladder rail, a stack of shingle bundles, or a plank of staging in an afternoon, and in most cases it moves on within a day or two. The harder case is a colony that has already set up housekeeping in a soffit, a gable vent, a chimney chase, or a wall void. An established nest near the roofline can move a tear-off date sideways, and many homeowners only learn about it on the morning the crew pulls up. This page is for the stage where you are comparing roofers and want to know who makes the call to stop work, who pays to have the insects removed, and what each roofer does while the insects are still there.

Nothing here is a reason to avoid a roof job. It is a reason to ask the question before the first bundle lands, because the answer changes the schedule, the crew's safety rules, and sometimes the bid. A roofer who has thought about it will answer in a sentence or two. A roofer who has not will usually say something like "we'll deal with it when we see it," and that vagueness is itself useful information when you compare bids side by side.

Roofer comparison

Start by sorting the roofers into two groups: those who name a person who makes the stop call, and those who name a process. A stop call should belong to one named person, usually the foreman or the crew lead on site, and that person should have the authority to halt the work without calling the office first. If a roofer says the office decides, ask for the phone number of the person who answers the office line during the workday. A stop call that waits for someone to read a text message at a desk across town can leave a crew working next to a nest for hours.

Next, ask what the crew does with its ladders and staging. A swarm tends to cluster on anything that is warm, dark, or slightly sweet smelling, and aluminum ladders left against the eave in the morning sun can become a landing spot. Some roofers will tell you the ladder is moved to a shaded or cooler spot before the crew starts, and others will say nothing. Write down which answer each one gives. If a roofer says the crew will simply work around the bees, ask what that means for the people on the ladder, and whether anyone on the crew carries a sting kit or has been trained to use one.

Finally, compare how each roofer handles a nest that is already established. The useful answer is a named path: the crew stops work at the affected elevation, the homeowner is told in writing, and a licensed pest control operator or a local beekeeper is called to remove the colony before the crew returns. Roofers differ on whether they will call the removal company themselves or leave that to you. Neither approach is wrong, but the one you choose should be written into the bid so that the schedule does not depend on memory.

What it costs

The removal itself is a separate service with its own price, and it is rarely included in a roofing bid. A honeybee swarm capture, a wasp nest removal under a soffit, and an opening in a wall for a colony can have very different costs, and the quote you get for one will not tell you what the others would cost. Ask each roofer whether the bid carries any allowance for insect removal, and if it does, what that allowance covers and how much of it is an estimate rather than a fixed number.

The cost that homeowners tend to overlook is the schedule cost. If the crew stops for a day and cannot return until the removal is done, the bid may or may not show a standby charge, and the start date may or may not move. Ask each roofer how a stop caused by insects is billed. Some will treat it the same as a weather day, some will add a labor line for the idle crew, and some will say the contract date stands regardless. Those three answers lead to three different final bills, and the difference is often larger than the cost of the removal.

There is also the cost of the repair after the nest is gone. A colony that has been inside a soffit for a season may have chewed or stained the wood, and the crew may find damaged fascia or sheathing once the nest is opened. Ask each roofer whether a repair to that kind of damage is priced in the bid, priced as an add-on, or excluded. A bid that says nothing about it is not a bid that includes it, so write the question down and get the answer in the same sheet as the rest of the scope.

What to ask

Use the same three questions with every roofer, in the same order, and write each answer beside the question it answers. Who on the crew can stop work for an insect problem without calling the office? Where do the ladders and staging go overnight and before the crew starts, and what is the rule for a swarm that lands on them? How does a stop caused by insects change the schedule and the bill, and is that change in writing?

Then ask for two more things that are easy to forget. First, ask each roofer to walk the eave with you before the start date and note any visible activity, including holes, mud tubes, and clusters of insects on sunny walls. A roofer who will walk the eave with you is showing you the same attention they will give the shingles. Second, ask each roofer what they will photograph if they open a soffit or find a nest, and whether you will receive those photos the same day. A dated photo is the simplest record that the work stopped for a reason, and that record matters when the schedule and the bill are compared later.

If a roofer tells you the insects will not be a problem, ask what they would do if they were wrong. The answer should describe a stop, a call to a removal service or a beekeeper, a written note to you, and a new date. If the answer is that they would figure it out, you have learned something about how that roofer handles surprises, and you can weigh it against the other bids before you decide. The roofer who names the stop call, the removal path, and the bill for the delay in one short answer is usually the one whose schedule will hold when the crew reaches the ladder.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection