Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

A Supplier Counter Closed at Five Can Idle a St. Louis Roof Crew

Ask where the shingles are picked up, what hours that counter keeps, and who calls you when a pickup slips, before you choose a roofer.

A roof crew rarely starts on the day the calendar says it will. The delay often happens a day earlier, at a supply counter across town, when a pallet of shingles is still waiting for someone to load it. If the counter closes at five and the crew arrives at six, the start slips a day, and in St. Louis a single day can be the difference between a finished roof and an open one sitting under an afternoon storm.

This page is for a homeowner who has two or three written bids in hand and wants to know one thing before choosing: how the shingles physically reach the house, and what hours that process depends on. Most bids say the materials are included. Few say where they are picked up, when, or by whom.

Why the counter hours matter

Shingles for a residential job come off a pallet, and the pallet is ordered from a supply branch. Some roofers have an account that delivers to the job site. Others pick up at the counter, which means someone from the crew drives a truck to the branch, waits for the order to be pulled, signs the ticket, and drives back. Each step depends on the branch being open.

Supply counters commonly keep daytime hours on weekdays and shorter hours on Saturdays. Few are open on Sundays. Holiday weeks change the schedule again. None of that is unusual, but a bid that says the crew starts Tuesday at seven is only as good as the pickup scheduled for Monday afternoon.

Pickup also has a cost that is easy to miss. If the crew spends two hours on a round trip and an hour at the counter, that is paid labor and fuel, and it has to appear somewhere in the number. A bid that prices delivery as a line item and a bid that quietly folds it into labor can look very different side by side.

Roofer comparison: what each answer tells you

Put the same four questions to every roofer you are considering, and write down the answers as given. Do not accept "we handle that" as an answer. Ask for the branch name, the hours, and the person who will be on the counter.

  • Is the order delivered to the lot, or does a crew member pick it up? If pickup, which branch?
  • What are that branch's weekday and Saturday counter hours?
  • Is the order placed in writing, with a confirmation number you can ask about?
  • If the pickup slips, who calls you, and how soon?

A roofer who answers all four without hesitation has usually dealt with this before. A roofer who says the materials will be there when needed, without naming a branch, has told you that the step has not been planned yet. That is worth knowing before you sign, not after the first morning.

Keys Roofing installs Atlas and Malarkey shingles only, so a homeowner comparing Keys with another bid can check whether the other roofer names one of those two brands and whether that is the product being ordered. Brand alone does not settle the pickup question, but it does tell you whether the two bids describe the same product.

What it costs

Ask each roofer whether delivery is included in the bid or charged separately. If it is charged, ask for the amount in writing and whether it is per trip or per order. A split order, where half the shingles arrive Monday and the rest Wednesday, can add a second delivery charge that nobody mentioned at signing.

If the crew does the pickup, ask whether the labor time is inside the price or billed by the hour. A pickup that takes three hours because the counter was closed when the truck arrived is a cost that belongs in the bid as a stated assumption, not as a surprise on the final invoice.

Also check whether the bid assumes a specific pickup day. Many bids are written with a start date that already presumes the materials are on the truck. If the start date moves because the shingles were not picked up, the bid should say whether the price changes with it, and by how much.

What to ask

  • Which supply branch fills the order, and what are its counter hours on each day you are likely to start?
  • Does the bid include delivery to the lot, or a pickup by the crew? If pickup, what is the labor assumption?
  • When is the order placed, and when is it ready? Can you see the order confirmation?
  • If the counter is closed on the scheduled pickup day, what happens to the start date, and does the bid change?
  • Who unloads the pallet at your house, and where does it sit overnight?

The last question connects to the rest of the job. A pallet that arrives the afternoon before a storm needs a dry, level, reachable place to sit, and a roofer who has thought through the pickup will usually have an answer for that too.

A St. Louis timing note

Late-season starts are where a closed counter hurts most. Freeze and thaw cycles can make a cold morning hard on shingles that have just come off a truck, so the materials may need time to settle before they are handled, and a crew waiting on a counter can lose the warmer part of the day. In summer, the same delay can push the work into afternoon thunderstorms that move through the region with little notice.

If you live in St. Louis County, your municipal permit desk may also keep its own hours, and a permit that must be posted before work starts adds a second schedule. Ask the roofer to put both calendars on the same line so you can see whether they conflict.

Where to start

Before you choose, send each roofer the same short list and keep the replies. The answers will show which bid has the pickup planned and which one is leaving it to chance. If you want to talk through a specific bid, Keys Roofing can be reached at (314) 220-2333.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection