
A Stair Runner Under the Attic Hatch Is a Roof Day Path, So Name Who Protects It
Each roofer should say who protects the runner, who moves it, and who pays if tear-off dust gets into it, before you compare totals.
Most roof quotes never mention the rug under the attic hatch. The hatch is the square opening in a hallway ceiling or the pull-down stair above a closet, and the runner is the strip of carpet or woven fabric that lies on the floor beneath it. On roof day that runner sits directly in the path of tear-off dust, nail fragments, and crew members going up and coming down. Nobody plans for it unless someone writes it down. This page gives you the questions to put to each roofer before you pick a start date.
Roofer comparison
Start with the route. Ask each roofer to describe, step by step, the path from the front door or garage to the attic hatch on roof day. A crew that tears off old shingles does not only walk the roof. Someone goes into the attic to check the decking from underneath, to set the hatch cover, and sometimes to pull out soft boards. Every trip through the house is a trip across the runner. Ask whether the crew uses the front entry, the garage, or a side door, and whether the runner sits on that route or beside it.
Then ask who protects it. Some crews roll the runner back and tape it to the wall. Others lay a drop cloth over it and tape the edges. A few lift it off the floor entirely and set it in a bedroom. Each method costs time, and each carries a risk. A roll-back leaves the edges open to dust. A drop cloth can slide when someone steps on it. A full lift means the crew carries a dusty runner somewhere else, and that needs a named person doing it. Ask each roofer which method they use on a two-story house with one hatch, and which they use when the hatch sits in a narrow hall with little room to work.
Ask about timing too. The protection should be in place before the first shingle comes off and should stay until the last load of debris leaves the house. Some crews protect the runner in the morning and remove the protection at the end of the day, which leaves the runner exposed overnight while the attic is still open. Others keep the hatch covered until the decking is replaced. Ask which pattern each roofer follows and what happens on a day when the crew stops early because of rain.
Then ask about the hatch itself. If the opening has a pull-down stair, ask who folds it up after an attic walk, who closes the cover, and what happens if a spring fails when someone steps on the bottom rung. Ask whether the hatch closes at the end of each day or stays open until the new deck is down. An open hatch over a finished hallway lets dust fall onto the floor, the runner, and any furniture nearby.
What it costs
The runner rarely costs much to protect, but the protection should show up as a visible line rather than a promise. Ask each roofer whether drop cloths, painter's tape, and floor covers are part of the base bid or charged as a separate item. Some quotes fold them into labor or general supplies. Others list them as a small fee. Neither approach is wrong, but you cannot compare two bids that handle this differently unless you know which one you are reading.
The larger question is what happens if the runner gets damaged anyway. Carpet dragged across grit can pick up embedded sand and small nail pieces, and a runner with a torn edge can be harder to fix than one that is only dusty. Ask each roofer whether they replace a damaged runner, clean it at their own cost, or send you to a carpet cleaner whose bill you pay. Get the answer in writing, with a dollar figure or a stated rule for what they will cover. An answer like "we will take care of it" does not tell you who pays when the job ends.
If the runner is an heirloom, a wool rug, or a built-in carpet piece in a rental unit, the cost question changes. Ask whether the roofer will move it off site, what they charge to store it, and who signs for it when it comes back. A rolled runner sitting in a crew truck is a delivery question as much as a cleaning question, so its terms belong in the same paper as your other roof day terms.
Watch for a quote that says nothing at all. A bid that describes the tear-off, the underlayment, and the cleanup but never mentions the hallway or the attic opening has left the runner to chance. That silence is not a price, but it will show up as one when the dust settles.
What to ask
Put the same questions to each roofer, in the same words, then compare the answers line by line. A blank reply counts as an answer too.
- Which route does the crew use from the entry door to the attic hatch, and does that route cross the runner?
- Do you roll the runner back, cover it with a drop cloth, or lift it off the floor, and which one do you use for a house like mine?
- Who on the crew is named as responsible for setting and checking the protection each morning?
- Is the runner protection in the base bid, or is it a separate line on the quote?
- If the runner is torn or stained by tear-off dust, do you replace it, clean it at your cost, or send me to a cleaner whose bill I pay?
- Do you close the hatch and fold any pull-down stair at the end of each day, and who checks that it is closed?
- Will you put these answers in the written scope before I sign?
Compare the replies side by side. If one roofer names the hallway, the drop cloth, and the person who sets it, while another answers with a shrug, the difference tells you more about the crew than a few hundred dollars in the total. Keys Roofing can answer these questions by phone at (314) 220-2333, and the answers should appear in the written scope rather than only in the call.
Keep every reply in one place. After a call, send a short email that repeats each answer in one sentence and ask the roofer to correct any sentence that is wrong. That gives you a dated record if the runner needs attention after the job. Before roof day, walk the path yourself, move the lamp, the plant stand, and any small items off the floor, and take a clear photo of the runner, its edges, and any existing stains. Ask the roofer whether that photo can go into their own job photo log, so the before condition is on file with them as well as on your phone.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.