Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

A Smart Lock Code Given to a Roof Crew Needs an Expiry Date

Ask each St. Louis roofer how a keypad or smart lock code reaches the crew, when it stops working, and who is told.

A keypad or smart lock on the front or side door can turn a roof crew's morning into a wait on your porch. The crew needs the door to stage shingles, reach the attic hatch, and move tools in and out, and most of that happens while you are at work. If the code goes out by text to a phone nobody reads, gets written on a sticky note inside the garage, or stays active after the last nail, you end up with a door that nobody can account for. This page is for the homeowner who has a smart lock, a keypad, or a lockbox on the house and wants each roofer's answer on the code before picking a start date.

Why the code belongs in the roof bid

Most roof bids describe the tear-off, the underlayment, the flashing and the cleanup. Very few say anything about how the crew gets into the house. That gap matters more than it looks. A roof job can run four to six working days on a typical St. Louis ranch or two-story, and the crew may come and go through a side door on each of those days. A lock code is a small item, but it is the only thing that lets the crew reach a closed interior door, a basement stair, or the attic access without you standing there.

The bid should name who issues the code, how it is delivered, when it expires, and who changes it if the job slips. A code that works for three days in June and then gets reset is a much smaller risk than a code that stays live all year on a lock you have forgotten about.

Roofer comparison

Put each roofer's answer on the same line of a single sheet so the differences are easy to see. The questions below are the ones that separate a roofer who has thought about the lock from one who has not. Write down the exact words each roofer uses. A vague answer such as "we'll take care of it" is a blank cell, not a yes.

  • Who creates the code. Ask whether the roofer's office makes it, you make it, or the crew lead asks you for it on the morning of the job.
  • How it reaches the crew. Ask whether it goes by text to a named crew member, is read over the phone to the foreman, or is left in a sealed note on your porch. Ask for the name of the person who receives it.
  • When it expires. Ask for an end time in writing. The expiry should be the last working day of the job, not the date the contract was signed.
  • What happens if the job slips. Ask whether the code is reset, extended, or deleted when a rain day or a material delay moves the start. A roofer who says the code simply stays on is describing a loose end.
  • Who logs entries. Many smart locks keep an entry history. Ask whether the roofer will share the lock log with you on the final walk, or whether they will at least tell you the number of entries per day.
  • What the crew does with a keypad that is not a smart lock. A mechanical keypad with a shared code has a different risk than a phone-based lock. Ask whether the roofer will ask you to change the code after the job.

If two roofers give you the same answer on every line, the comparison has to move to other parts of the bid. If one roofer gives a clear name, a clear end time and a reset rule, and the other gives none of those, the difference is worth writing into your notes before you talk price.

What it costs

A smart lock code itself costs nothing to issue. The cost comes from the time a crew member spends waiting on a door, from a second trip when a code fails, and from a lock that has to be reprogrammed after the job. Ask whether any of those are included in the bid or billed separately. A roofer who bills a return trip because the code did not work is passing a homeowner problem into a line item, so that line deserves a written rule before the job starts.

Some homeowners want the lock changed at the end of the job. That is a locksmith or electrician task, not a roofing task in most bids, and it usually sits outside the roof price. Ask each roofer whether they include a code reset in the closeout, and if so, what it covers. If the answer is no, price the lock change separately and decide whether you want it done before or after the final check.

What to ask

  • Who will hold the code on the crew side, and what is that person's role on your job?
  • Will the code be sent to a phone, read aloud, or delivered on paper, and when does each method apply?
  • What is the exact expiry time, written in the contract or the job sheet?
  • If the start date moves, who resets the code and how do you learn it has changed?
  • Will you receive the entry log or a daily count of door openings?
  • Is a code change at the end of the job in the price, and if not, what does it cost?
  • If the crew cannot get in, who do you call, and what is the response time?

Ask each roofer to answer these questions in writing. A written answer gives you something to compare, and it gives you something to point to on the day the crew is standing on your porch. If an answer is unclear after one email, call the office at (314) 220-2333 and ask for it to be written down before you decide. Keep the answers with the rest of the job file, next to the start date and the scope, so the lock question is not left to memory when the trucks arrive.

Set the expiry before the first ladder goes up

The lock is the part of a roof job most homeowners forget until a crew member is standing outside. The roofers who handle it well say so before the contract is signed, put the name of the person holding the code on paper, and name the hour the code stops working. The homeowner's job is to ask for those three things and keep the answers where they can be found on roof day.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection