A Silt Fence Before Tear-Off Needs an Owner in Each Roof Bid
Tear-off grit can run downhill on St. Louis clay after a storm, so ask each roofer who sets the silt fence, who checks it, and who fixes it.
Tear-off on a St. Louis roof sends gravel, old shingle pieces, and fine grit off the eave and down the slope. The lower lot is where it lands. Clay soil across much of the metro sheds water instead of soaking it up, so a summer storm that hits during a tear-off can carry that grit into a driveway apron, across a neighbor's lawn, or into the street grate in front of the house. A silt fence is a row of fabric staked along the low edge of the work area to slow the flow and hold sediment on your side of the line. Whether one is needed, where it stands, and who checks it after rain are questions each roofer should answer before the first shingle comes off.
Roofer comparison
Put the same three questions to every roofer on your list: Will you set a silt fence or other sediment barrier on my lot before tear-off starts, and where will it stand? Who inspects it after each rain, and how soon? Who fixes it if a storm pushes material past it? A roofer who answers all three with a specific sentence has a plan. A roofer who answers "we clean up" has not given you one.
Compare the location, not just the presence. A fence that runs along the side of the house but stops short of the low corner does nothing for water that flows around its end. Ask each roofer to describe the line in terms of your own yard: which side of the drive, which edge of the lawn, which storm inlet. If the bid includes a sketch of your lot, check whether the sketch shows the fence. If it does not, ask for a sketch before you compare numbers.
Compare the timing too. Some crews set the barrier on the first morning, before any material moves. Others set it after the dumpster and the shingle pallet are in place. The second order leaves a window in which the first load of debris can reach the lawn. Ask each roofer which order they follow and whether it appears in the written schedule.
Compare the upkeep. A silt fence full of sediment stops working. Ask how often the crew walks the line during a multi-day tear-off, and who is responsible for a check after heavy rain on a day when no crew is on site. Write the answer beside the roofer's name. Vague answers here tend to come back as a complaint about the lawn two weeks later.
Compare the boundaries with your neighbors. If the fence has to cross a property line or sit on a shared easement, the roofer should say so, and you should know whether the neighbor was told. Get any neighbor agreement in writing before the crew stages anything on their side of the line.
What it costs
Silt fence fabric, stakes, and the labor to set them are a small line on many roof bids. The part that varies is the crew time to set the barrier correctly on a sloped lot, to move it when the dumpster or material stack needs the space, and to repair it after weather. Those hours are what a bid should name. A single line that says "site protection" without a quantity leaves the homeowner guessing what was included.
Ask whether the sediment barrier is in the base price or priced as an add-on. Ask whether it is a fixed charge or billed by the foot. Ask whether repairs after a storm are included or billed as a return visit. None of these questions is a trick. The answers decide whether a bid holds up under rain or turns each wet afternoon into a discussion about a change order.
Ask about the cleanup as its own item. Tear-off grit that reaches a street grate may need hand removal, and a crew that washes it down with a hose may be sending it further. Ask each roofer how the grit is collected, where it goes, and whether that work is in the bid. A line that says cleanup without a method is the same vague answer in a different place.
If your lot sits in a drainage path, or your street has storm inlets that flow toward a creek, the cost of getting this wrong is higher than the cost of the fabric. Ask each roofer which of those applies to your address before you decide the fence is optional.
What to ask
Ask each roofer these questions in this order, and write the answers beside their names:
- Where exactly will the silt fence stand on my lot, and which edge of the work area does it protect?
- Will it be set before the dumpster, the shingle pallet, or the first tear-off load arrives?
- Who walks the fence during the job, and who checks it after rain when no crew is on site?
- What happens if a storm pushes sediment past the fence onto the drive, the lawn, or a neighbor's yard?
- Is the barrier included in the base price, and what is the charge for repairs or moves?
- How is tear-off grit cleaned off the drive and out of the street grate, and by whom?
- Does my address trigger any stormwater requirement at the permit desk, and who confirms that answer?
Two of these questions are about paperwork. The city and the county each have their own rules for disturbed ground and runoff, and the answer depends on the address and on how much of the lot the work disturbs. Ask the permit desk directly, or ask the roofer who pulls the permit to confirm the answer in writing. A roofer who has not thought about the question yet is worth knowing about before the crew is on your lot.
Keep the answers in the same folder as the bid. If a roofer says the fence will be set on day one, that promise belongs in the written schedule, not only in a phone call. Keys Roofing can be reached at (314) 220-2333 to ask these same questions, and the answers should come back in writing the same way for every roofer you compare.
Ask about the fence again after the first heavy rain. By then the answer is no longer a promise on paper. It is something you can see from the driveway, and it tells you whether the roofer's plan was written for your lot or for a lot like it.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.