Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

A Scratched Door Handle After Roof Day Needs an Owner in Each Quote

A scratched handle from roof work is a small repair, and each roofer's quote should name who fixes it, who pays for it, and by when.

Roof crews carry ladders, trailers and tools through a house's side yard and sometimes through its front hall, and small things get bumped along the way. A door handle is a common one. A brass knob catches a bundle strap, a wall plate gets a scuff from a shoulder, or a lockset loosens when a crew pushes a door open with a full arm. None of these is a roof failure, and most are fixed in an afternoon. The trouble is that a bid usually does not say who fixes them, so the homeowner finds out after the crew has left.

This page is for the homeowner who is comparing roofers and wants one fact settled before signing. The fact is simple: when a handle or latch is scratched or loosened during roof work, which roofer's quote says who repairs it, who pays for the part, and how soon the repair happens. Two bids can look identical on the front page and still answer that question differently.

Roofer comparison

Start by reading each bid for the words that cover interior and exterior hardware. Many quotes list the roof, the drip edge, the gutters and the pipe boots, then stop. Hardware on doors and windows is not roof work, so it often falls outside the scope entirely. Other bids use a broad phrase such as "protect the home," which sounds complete but does not name the door handle, the deadbolt or the storm door closer. Ask each roofer to point to the line where a damaged door item would be covered. If the answer is "we take care of it," ask for that promise in writing.

Next, check who the roofer names as the responsible party. A clear answer names a person or a role: the crew lead, the project manager or the office line. A vague answer names only the company. Both are common. The homeowner needs a name for the repair call, because a company name does not pick up at seven on a Monday morning when the front door will not latch.

Then compare the timing. A scratched finish on a brass handle is cosmetic and can wait a week. A loose lockset on an entry door that no longer latches is a security problem and should be fixed before the crew returns the next day. Ask each roofer how long a hardware repair takes to schedule, and whether the repair waits until the roof is closed in or happens on a separate visit. A bid that says "within a reasonable time" gives you nothing to compare.

What it costs

Hardware repairs usually cost less than the homeowner fears, but the price depends on what was damaged. A replacement lever or knob is a part with a price, and a lockset may need a new cylinder or a rekeying. A door that was pushed out of alignment may need a hinge adjustment or a new strike plate, which is a carpentry visit rather than a part. Ask each roofer whether the repair is priced as a flat line, as an hourly labor charge, or as parts plus labor. Flat lines are easy to compare. Hourly lines depend on how the crew estimates the time, so ask for the rate and any minimum visit charge.

Also ask who buys the part. Some roofers will order a matching handle at their supplier's cost and bill it through. Others expect the homeowner to buy the hardware and have the crew install it. Neither method is wrong, but the two change the total you pay and who holds the receipt. If the handle is discontinued, the matching finish may not exist, and the quote should say what happens next: a close finish, a full replacement set, or a repair that leaves a visible patch.

Do not accept a repair line that is left blank or written with a question mark. A blank hardware line is not zero. It is an open item, and an open item becomes a surprise on the final invoice after the crew has moved its equipment out.

What to ask

Ask each roofer these questions and write the answers beside each quote, not in a text message that disappears:

  • Which exact door, window or hardware items are inside the scope, and which are excluded?
  • Who is the named person I call if a handle, latch or lock is damaged on roof day?
  • Who orders and pays for the replacement part, and does that price appear on the bid?
  • How many days pass between my report and the repair visit, and is that visit included in the quote?
  • If the matching finish is discontinued, what does the quote say the crew will do?
  • Does the crew photograph the hardware before the first door opens on roof day?

The photo question deserves its own line. A dated photo of the handle before work starts settles what was there before. Without one, a scratch can be argued either way. Ask each roofer whether the crew takes these photos as a routine step and whether you receive copies. The photo is also useful later if you need to show the condition to anyone else.

Finally, ask what the crew does with a door that cannot be secured at the end of a workday. A loosened lockset on an entry door needs a plan for the night: a temporary lock, a second person checking the house, or a return visit before dark. A roofer who answers this question without hesitating is showing you that hardware is part of the day's plan, not an afterthought.

Reading the answers side by side

Put the replies in one list. Mark each roofer yes, no or not stated for the hardware items. Then mark the named contact, the part owner, the repair timing and the photo step. A bid with all four marked yes is easier to trust than one with a low price and a long silence. A bid with a blank line is not necessarily worse, but the blank is where the next conversation has to happen, and you should have that conversation before you sign.

Keep the replies in the same folder as the quote. If a handle is scratched on day three, the answer you need is the one you already wrote down. Roofers change crew leads and office staff, and a written reply keeps its meaning after the person who wrote it has moved on.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection