Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

A Roof Quote That Sits Unsigned Needs a Follow-Up Rule From Each Roofer

When a St. Louis roof quote sits unsigned for weeks, ask each roofer what follow-up they send, when, and what changes if the price moves.

A roof quote that sits on the kitchen table for three weeks is not a neutral thing. Shingle prices move, crew calendars fill, and a number that looked right in March can be a different number by the time a St. Louis homeowner is ready to sign in May. Most roofers will tell you their price is good for a set number of days. Fewer will tell you what they do between the day you asked for the bid and the day you say yes, and that gap is where a comparison can go wrong.

This page is about the follow-up. Each roofer who gave you a written bid will reach out at some point, or will not. How they reach out, how often, and what they say when you go quiet tells you how the job will be run after you sign. It is a fair thing to compare, and it costs you nothing to ask.

Roofer comparison

Start by writing down the date each bid was delivered to you in writing, not the date of the first visit. A verbal number from a walk-through is not the same document as a scope with photos and measurements. Put the two dates side by side. If one roofer delivered on a Tuesday and another on the following Monday, the older bid has been sitting longer, and its validity window may be shorter than you think.

Then compare the follow-up pattern. Some roofers send one message on day two, one on day seven, and then wait for you. Others call the same week and leave a voicemail with a callback number. A few never follow up at all, which is an answer in itself. None of these patterns is automatically wrong. A roofer who backs off after one message may be respecting your time. A roofer who does not reach out for a month may be booked solid. What matters is that you can see the pattern, and that it does not change depending on the price.

Keys Roofing works from a written scope with photos and measurements, and the office at (314) 220-2333 is where a homeowner can ask about timing. The point of the comparison is not which roofer calls the most. It is whether each one puts the terms of their follow-up on paper. A follow-up email that restates the bid's expiry date, the materials price basis and the earliest start window is useful to you. A text that says "just checking in" is not.

Watch for a second kind of gap: the roofer whose follow-up only asks whether you have decided, and never asks what you still need answered. A good follow-up names the open items. Did you ask about the ice and water membrane at the eave? Did you ask how the chimney flashing is priced? If the follow-up does not touch the questions you raised on the walk-through, the roofer is selling, not solving, and you should note it.

What it costs

An unsigned quote has a cost that does not appear on the bid. Materials prices change. Shingle makers adjust their list prices on schedules that no single contractor controls, and a roofer who quoted you in late summer may not be able to hold that number into the fall. Ask each roofer directly how long their unit prices are held, and whether the hold is tied to the date you sign or the date the shingles ship. Those are different promises, and the difference can be a few hundred dollars on a typical St. Louis house.

Season matters too. A bid written in October for a spring start carries a different risk than one written in April for a June start. Freeze and thaw cycles in the St. Louis area make winter installs slower, and sometimes impossible on a given day, which can push a start date by weeks. Ask each roofer what their follow-up calendar looks like before the first hard freeze, and whether a missed window reopens the price.

There is also the homeowner's time. Every extra round of calls is an hour you are not spending on the decision. A roofer whose follow-up makes the decision easier is worth more than one whose price is a few dollars lower and whose messages are scattered across three inboxes. Count the messages you received from each roofer over the same period. The number is not a score, but a pattern of two messages versus eleven tells you something about what the next six months will look like.

Do not pay anything to hold a quote in place unless the terms are written down. A deposit to lock a date is a different commitment from a deposit to lock a price, and a roofer should say which one they are asking for. If the answer is vague, treat the vagueness as the finding.

What to ask

Ask each roofer these questions by email, so the answers are in writing and dated:

  • How many days is this bid valid, counted from the date it was delivered to me?
  • Is the shingle price locked to the signing date or the shipping date?
  • What follow-up will you send if I have not replied, and on what schedule?
  • Who on your team will contact me, and by what route: phone, text or email?
  • If I ask a new question after the bid expires, will you reissue the price, and at what cost?
  • What is the earliest start window you can hold if I sign this month, and what changes if I sign in six weeks?

Then ask one question that is harder to answer. Ask what happens to the job if you go silent for a month and then come back. A roofer with a clear process will describe a re-check of the measurement, a look at current material pricing and a new calendar slot. A roofer without one will say they would be happy to help, which is not an answer.

Record each answer beside the roofer's name in one file. When two roofers give different answers on the same point, write both down. A difference in how a roofer describes the price hold is a comparison fact, and you will want it in front of you on the day you decide.

Finally, keep the decision in your own hands. A follow-up that sets a deadline is fine if the deadline is written down and the roofer can say why it exists. A follow-up that creates pressure with no written reason is worth noting, and you can say so in your reply.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection