The document

A Roof Bid's Cover Letter Says More Than the Price Page

A roof bid's cover letter should name the estimator, the crew lead, the offer's expiry and the scope the number rests on.

A roof bid has two parts that people tend to read in the wrong order. The first is the cover letter, the page or pages that go out with the numbers. The second is the price page. Most homeowners flip straight to the price, which is understandable, but the cover letter is where a roofer says who is responsible for the job, what the number rests on, and how long the offer stands. Two bids with the same total can read very differently once you have both cover letters side by side.

This page covers what a St. Louis homeowner should expect a cover letter to contain, how to compare what each roofer puts there, what the document should cost you to get, and what to ask when a letter leaves something out. It assumes you are deciding between two or three roofers and need one specific fact before you choose.

What a cover letter should name

Start with names. A cover letter should name the person who wrote the estimate and the person who will run the job on your street. Those can be the same person, but they often are not, and the difference matters if the estimator works in an office while the crew lead is on your roof. Ask the roofer to put both names in writing, with a phone number that reaches the crew on a working day. The Keys office number, (314) 220-2333, is one place to start, but ask for the number the job-day crew answers to, which may be a different line.

Next, the letter should say when the offer expires. Shingle prices move with the manufacturer and the distributor, and a bid written in late summer can carry a price that no longer holds by the time the crew is free. A dated expiry tells you whether the number is still the number. If the letter has no date at all, you have a quote with no clock on it, and that is a question to put to the roofer before you compare anything else.

The letter should also point to the scope it rests on. A line that says the scope is attached is not enough by itself. Look for page numbers, sheet names, and a note on whether the measurement is dated and how it was taken. A roofer who measured your roof on a visit should be able to say when, and whether the measurement came from a walk on the roof, a ladder check, or an aerial report. Each of those carries a different error rate, and the letter should tell you which one the number came from.

What a St. Louis letter should address that a generic one skips

St. Louis roofs face a few conditions that a template letter from somewhere else tends to leave out. The freeze-thaw cycle is the first. A letter for a tear-off that runs into a cold week should say what happens if the crew cannot seal the shingles by a certain temperature, and who pays for the extra days. Ask the roofer to name the temperature at which they stop nailing or sealing, and whether that threshold is written into the letter. Hail season, which in this region runs through spring and into summer, matters too. A cover letter should say whether a hail-damaged roof gets a different scope, and whether that scope is priced separately.

Ice damming at the eave is the third. If the roof has a cold north or shaded eave, the letter should say whether the underlayment at the eave is included, and how far up the deck it runs. This is the kind of line that moves a price without much notice, and a letter that does not name it has left the eave open.

Permits are the fourth. St. Louis County has municipal permit desks, and each one has its own practice on who applies, what the application needs, and when inspections are booked. A cover letter should name the permit applicant. It should also say whether the permit fee is in the bid or billed separately. If the roofer says the permit is included, ask what the permit covers and where the permit card will hang while the crew works.

Roofer comparison: lining up the letters

Put the cover letters from each bid next to each other, and check the same five things in each one. Who wrote the estimate and who runs the job. When the offer expires. What the number rests on, including the date and method of measurement. What the letter says about weather, the eave, and the permit. And whether the letter makes any promise about time, such as a start window or a completion date.

The fifth item is the one most homeowners skip. A letter that promises a completion date should say what the date assumes. A date that assumes dry weather for eight working days is a different promise from a date with no weather terms. If one letter sets a start window and another gives a single day, you are not comparing the same thing, and you should ask both roofers to restate their timing in terms that match.

Missouri does not license roofers at the state level, so the letter is one of the few documents you control in the comparison. It is not a license, and it does not make the roofer responsible for anything the law would not already require. What it does is set the terms the roofer has chosen to put in writing, and that is worth reading closely.

Pay attention to the tone of the letter as well. A letter that answers the questions it was asked and names the places where it is uncertain is more useful than one that reads smoothly and says nothing about the things that move a price. Hedge words are not automatically a warning. They can be an honest sign that a roofer has not yet seen a part of the roof. The question is whether the roofer says what the hedge covers and when they will know more.

What it costs

A cover letter should not cost you anything. A roofer who asks for a fee to write one, or who treats the letter as an extra add-on, is telling you something about how the bid will be handled. The letter is part of the estimate, and it should arrive with the numbers, not after a deposit. If the letter depends on a sales visit you have not yet booked, ask whether the visit is free and whether the letter is part of that visit.

The cost question that does matter is what the letter leaves out and what that omission could add later. Each missing line is a potential change order. A permit fee that is not named in the letter may appear on the final invoice. A missing eave detail may appear as a separate line when the crew reaches the eave. A letter that is thin on terms is cheap to get and expensive to argue about after the tear-off begins. Ask each roofer to state what the letter assumes, and price the gaps before you sign anything.

There is also a timing cost. If one bid expires in two weeks and another in two months, the two numbers are not on the same footing. The shorter window can force a choice before you have finished comparing, and that pressure is worth naming to yourself before you act on it.

What to ask

Ask each roofer who wrote the estimate and who will be the crew lead on your roof, and ask for a direct number for the crew lead on the days the work is scheduled. Ask when the offer expires, and what happens to the price after that date. Ask how and when the measurement was taken, and whether it was checked on the roof or from the ground. Ask whether the letter includes the eave underlayment, the permit fee, and the cold-weather plan, and ask what temperature the crew stops sealing shingles.

Ask what the completion date assumes. Ask whether any part of the scope is priced as an allowance, and what the allowance covers. Ask whether the letter can be sent again if the first copy is lost, and whether a revised letter carries a new date. Write the answers down, and compare the answers, not just the totals.

If a roofer cannot answer one of these in writing, that is a result too. You can ask again by email or phone and note the reply. A roofer who answers quickly and in the same terms across every question is easier to compare than one who answers differently each time you ask.

When you have two or three letters side by side, read each one through once from start to finish, then go back and mark the places where the letters disagree. Those marks are the questions to take back to each roofer before you choose. The price can wait until the letters agree on what they are pricing.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection